Foundation pit support of steel structure factory building

The utility model discloses a steel structure factory building foundation pit support which comprises a first step slope, a first single-row stirring pile, a first single-row jet grouting pile, a first prestressed pipe pile, a factory building foundation pit bottom structure, a second step slope, a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FENG YAJUN, JIA YUYUAN, ZHONG CHUNHUA, CHEN ZHIHAO, HUANG JUNWEI, ZHANG KAITIAN, CAI HONGHUI, LIU ZHONGXIN, SU DONGYOU, ZHOU WENJIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FENG YAJUN
JIA YUYUAN
ZHONG CHUNHUA
CHEN ZHIHAO
HUANG JUNWEI
ZHANG KAITIAN
CAI HONGHUI
LIU ZHONGXIN
SU DONGYOU
ZHOU WENJIE
description The utility model discloses a steel structure factory building foundation pit support which comprises a first step slope, a first single-row stirring pile, a first single-row jet grouting pile, a first prestressed pipe pile, a factory building foundation pit bottom structure, a second step slope, a second prestressed pipe pile, a second single-row stirring pile and a second single-row jet grouting pile. Soil layers on the two sides of the plant foundation pit can be reinforced through cooperation of the stirring piles and the jet grouting piles, meanwhile, due to the arrangement of the two slopes, excavation of the deep foundation pit can be achieved conveniently, and the structure of the prestressed pipe piles, the connecting beams and the like is combined; the method is suitable for foundation pit construction of a factory building including a basement in a complex soil structure with soil layers including a soil filling layer, a mucky soil layer, a medium sand layer, a silty clay layer and a mud rock layer
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217105110UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217105110UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217105110UU3</originalsourceid><addsrcrecordid>eNrjZLByyy_NS0ksyczPUyjILFEoLi0oyC8qUchPUyguSU3NAZJFpcklpUWpCmmJySX5RZUKSaWZOSmZeek8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTe2c_I0NzQwNTQ0CA01JgoRQAjMTBj</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Foundation pit support of steel structure factory building</title><source>esp@cenet</source><creator>FENG YAJUN ; JIA YUYUAN ; ZHONG CHUNHUA ; CHEN ZHIHAO ; HUANG JUNWEI ; ZHANG KAITIAN ; CAI HONGHUI ; LIU ZHONGXIN ; SU DONGYOU ; ZHOU WENJIE</creator><creatorcontrib>FENG YAJUN ; JIA YUYUAN ; ZHONG CHUNHUA ; CHEN ZHIHAO ; HUANG JUNWEI ; ZHANG KAITIAN ; CAI HONGHUI ; LIU ZHONGXIN ; SU DONGYOU ; ZHOU WENJIE</creatorcontrib><description>The utility model discloses a steel structure factory building foundation pit support which comprises a first step slope, a first single-row stirring pile, a first single-row jet grouting pile, a first prestressed pipe pile, a factory building foundation pit bottom structure, a second step slope, a second prestressed pipe pile, a second single-row stirring pile and a second single-row jet grouting pile. Soil layers on the two sides of the plant foundation pit can be reinforced through cooperation of the stirring piles and the jet grouting piles, meanwhile, due to the arrangement of the two slopes, excavation of the deep foundation pit can be achieved conveniently, and the structure of the prestressed pipe piles, the connecting beams and the like is combined; the method is suitable for foundation pit construction of a factory building including a basement in a complex soil structure with soil layers including a soil filling layer, a mucky soil layer, a medium sand layer, a silty clay layer and a mud rock layer</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220802&amp;DB=EPODOC&amp;CC=CN&amp;NR=217105110U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220802&amp;DB=EPODOC&amp;CC=CN&amp;NR=217105110U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FENG YAJUN</creatorcontrib><creatorcontrib>JIA YUYUAN</creatorcontrib><creatorcontrib>ZHONG CHUNHUA</creatorcontrib><creatorcontrib>CHEN ZHIHAO</creatorcontrib><creatorcontrib>HUANG JUNWEI</creatorcontrib><creatorcontrib>ZHANG KAITIAN</creatorcontrib><creatorcontrib>CAI HONGHUI</creatorcontrib><creatorcontrib>LIU ZHONGXIN</creatorcontrib><creatorcontrib>SU DONGYOU</creatorcontrib><creatorcontrib>ZHOU WENJIE</creatorcontrib><title>Foundation pit support of steel structure factory building</title><description>The utility model discloses a steel structure factory building foundation pit support which comprises a first step slope, a first single-row stirring pile, a first single-row jet grouting pile, a first prestressed pipe pile, a factory building foundation pit bottom structure, a second step slope, a second prestressed pipe pile, a second single-row stirring pile and a second single-row jet grouting pile. Soil layers on the two sides of the plant foundation pit can be reinforced through cooperation of the stirring piles and the jet grouting piles, meanwhile, due to the arrangement of the two slopes, excavation of the deep foundation pit can be achieved conveniently, and the structure of the prestressed pipe piles, the connecting beams and the like is combined; the method is suitable for foundation pit construction of a factory building including a basement in a complex soil structure with soil layers including a soil filling layer, a mucky soil layer, a medium sand layer, a silty clay layer and a mud rock layer</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLByyy_NS0ksyczPUyjILFEoLi0oyC8qUchPUyguSU3NAZJFpcklpUWpCmmJySX5RZUKSaWZOSmZeek8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTe2c_I0NzQwNTQ0CA01JgoRQAjMTBj</recordid><startdate>20220802</startdate><enddate>20220802</enddate><creator>FENG YAJUN</creator><creator>JIA YUYUAN</creator><creator>ZHONG CHUNHUA</creator><creator>CHEN ZHIHAO</creator><creator>HUANG JUNWEI</creator><creator>ZHANG KAITIAN</creator><creator>CAI HONGHUI</creator><creator>LIU ZHONGXIN</creator><creator>SU DONGYOU</creator><creator>ZHOU WENJIE</creator><scope>EVB</scope></search><sort><creationdate>20220802</creationdate><title>Foundation pit support of steel structure factory building</title><author>FENG YAJUN ; JIA YUYUAN ; ZHONG CHUNHUA ; CHEN ZHIHAO ; HUANG JUNWEI ; ZHANG KAITIAN ; CAI HONGHUI ; LIU ZHONGXIN ; SU DONGYOU ; ZHOU WENJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217105110UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>FENG YAJUN</creatorcontrib><creatorcontrib>JIA YUYUAN</creatorcontrib><creatorcontrib>ZHONG CHUNHUA</creatorcontrib><creatorcontrib>CHEN ZHIHAO</creatorcontrib><creatorcontrib>HUANG JUNWEI</creatorcontrib><creatorcontrib>ZHANG KAITIAN</creatorcontrib><creatorcontrib>CAI HONGHUI</creatorcontrib><creatorcontrib>LIU ZHONGXIN</creatorcontrib><creatorcontrib>SU DONGYOU</creatorcontrib><creatorcontrib>ZHOU WENJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FENG YAJUN</au><au>JIA YUYUAN</au><au>ZHONG CHUNHUA</au><au>CHEN ZHIHAO</au><au>HUANG JUNWEI</au><au>ZHANG KAITIAN</au><au>CAI HONGHUI</au><au>LIU ZHONGXIN</au><au>SU DONGYOU</au><au>ZHOU WENJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Foundation pit support of steel structure factory building</title><date>2022-08-02</date><risdate>2022</risdate><abstract>The utility model discloses a steel structure factory building foundation pit support which comprises a first step slope, a first single-row stirring pile, a first single-row jet grouting pile, a first prestressed pipe pile, a factory building foundation pit bottom structure, a second step slope, a second prestressed pipe pile, a second single-row stirring pile and a second single-row jet grouting pile. Soil layers on the two sides of the plant foundation pit can be reinforced through cooperation of the stirring piles and the jet grouting piles, meanwhile, due to the arrangement of the two slopes, excavation of the deep foundation pit can be achieved conveniently, and the structure of the prestressed pipe piles, the connecting beams and the like is combined; the method is suitable for foundation pit construction of a factory building including a basement in a complex soil structure with soil layers including a soil filling layer, a mucky soil layer, a medium sand layer, a silty clay layer and a mud rock layer</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN217105110UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Foundation pit support of steel structure factory building
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T18%3A32%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FENG%20YAJUN&rft.date=2022-08-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217105110UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true