Rainwater rapid penetration asphalt roadbed pavement
The utility model relates to the technical field of pavements, and discloses a rainwater rapid permeation asphalt roadbed pavement which comprises an original soil layer, a rammed earth layer laid above the original soil layer, a loess layer laid above the rammed earth layer, a large gravel layer la...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHEN ZHONGWEN HUANG SHENHUA HUANG BAOYI |
description | The utility model relates to the technical field of pavements, and discloses a rainwater rapid permeation asphalt roadbed pavement which comprises an original soil layer, a rammed earth layer laid above the original soil layer, a loess layer laid above the rammed earth layer, a large gravel layer laid above the loess layer, and a small gravel layer laid above the large gravel layer. A slag and gravel mixing layer is laid on the small gravel layer, a filtering layer is laid on the slag and gravel mixing layer, a pervious concrete layer is laid on the filtering layer, an asphalt layer is laid on the upper side wall of the pervious concrete layer, and a plurality of drainage pipes are arranged in the slag and gravel mixing layer. The two ends of the drainage pipe are located in soil on the two sides of the road surface and fixedly communicate with sewage pipes, and the lower side wall of the drainage pipe fixedly communicates with a plurality of water seepage pipes. According to the utility model, the permeation |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN216947701UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN216947701UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN216947701UU3</originalsourceid><addsrcrecordid>eNrjZDAJSszMK08sSS1SKEosyExRKEjNSy0pSizJzM9TSCwuyEjMKVEoyk9MSUoFyiWWpeam5pXwMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLEZJAh8c5-RoZmlibm5gaGoaHGRCkCAMkGLh0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rainwater rapid penetration asphalt roadbed pavement</title><source>esp@cenet</source><creator>CHEN ZHONGWEN ; HUANG SHENHUA ; HUANG BAOYI</creator><creatorcontrib>CHEN ZHONGWEN ; HUANG SHENHUA ; HUANG BAOYI</creatorcontrib><description>The utility model relates to the technical field of pavements, and discloses a rainwater rapid permeation asphalt roadbed pavement which comprises an original soil layer, a rammed earth layer laid above the original soil layer, a loess layer laid above the rammed earth layer, a large gravel layer laid above the loess layer, and a small gravel layer laid above the large gravel layer. A slag and gravel mixing layer is laid on the small gravel layer, a filtering layer is laid on the slag and gravel mixing layer, a pervious concrete layer is laid on the filtering layer, an asphalt layer is laid on the upper side wall of the pervious concrete layer, and a plurality of drainage pipes are arranged in the slag and gravel mixing layer. The two ends of the drainage pipe are located in soil on the two sides of the road surface and fixedly communicate with sewage pipes, and the lower side wall of the drainage pipe fixedly communicates with a plurality of water seepage pipes. According to the utility model, the permeation</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220712&DB=EPODOC&CC=CN&NR=216947701U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220712&DB=EPODOC&CC=CN&NR=216947701U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN ZHONGWEN</creatorcontrib><creatorcontrib>HUANG SHENHUA</creatorcontrib><creatorcontrib>HUANG BAOYI</creatorcontrib><title>Rainwater rapid penetration asphalt roadbed pavement</title><description>The utility model relates to the technical field of pavements, and discloses a rainwater rapid permeation asphalt roadbed pavement which comprises an original soil layer, a rammed earth layer laid above the original soil layer, a loess layer laid above the rammed earth layer, a large gravel layer laid above the loess layer, and a small gravel layer laid above the large gravel layer. A slag and gravel mixing layer is laid on the small gravel layer, a filtering layer is laid on the slag and gravel mixing layer, a pervious concrete layer is laid on the filtering layer, an asphalt layer is laid on the upper side wall of the pervious concrete layer, and a plurality of drainage pipes are arranged in the slag and gravel mixing layer. The two ends of the drainage pipe are located in soil on the two sides of the road surface and fixedly communicate with sewage pipes, and the lower side wall of the drainage pipe fixedly communicates with a plurality of water seepage pipes. According to the utility model, the permeation</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAJSszMK08sSS1SKEosyExRKEjNSy0pSizJzM9TSCwuyEjMKVEoyk9MSUoFyiWWpeam5pXwMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLEZJAh8c5-RoZmlibm5gaGoaHGRCkCAMkGLh0</recordid><startdate>20220712</startdate><enddate>20220712</enddate><creator>CHEN ZHONGWEN</creator><creator>HUANG SHENHUA</creator><creator>HUANG BAOYI</creator><scope>EVB</scope></search><sort><creationdate>20220712</creationdate><title>Rainwater rapid penetration asphalt roadbed pavement</title><author>CHEN ZHONGWEN ; HUANG SHENHUA ; HUANG BAOYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN216947701UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN ZHONGWEN</creatorcontrib><creatorcontrib>HUANG SHENHUA</creatorcontrib><creatorcontrib>HUANG BAOYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN ZHONGWEN</au><au>HUANG SHENHUA</au><au>HUANG BAOYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rainwater rapid penetration asphalt roadbed pavement</title><date>2022-07-12</date><risdate>2022</risdate><abstract>The utility model relates to the technical field of pavements, and discloses a rainwater rapid permeation asphalt roadbed pavement which comprises an original soil layer, a rammed earth layer laid above the original soil layer, a loess layer laid above the rammed earth layer, a large gravel layer laid above the loess layer, and a small gravel layer laid above the large gravel layer. A slag and gravel mixing layer is laid on the small gravel layer, a filtering layer is laid on the slag and gravel mixing layer, a pervious concrete layer is laid on the filtering layer, an asphalt layer is laid on the upper side wall of the pervious concrete layer, and a plurality of drainage pipes are arranged in the slag and gravel mixing layer. The two ends of the drainage pipe are located in soil on the two sides of the road surface and fixedly communicate with sewage pipes, and the lower side wall of the drainage pipe fixedly communicates with a plurality of water seepage pipes. According to the utility model, the permeation</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN216947701UU |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR |
title | Rainwater rapid penetration asphalt roadbed pavement |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T05%3A14%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20ZHONGWEN&rft.date=2022-07-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN216947701UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |