Pile pier type bidirectional berthing pier structure

The utility model discloses a pile pier type two-way berthing pier structure which comprises a bearing platform, a pile foundation and a pier body, the pile foundation is fixedly connected with the bottom of the bearing platform, the pier body is fixedly connected to the top of the bearing platform,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DUAN YUANZHEN, LI JUN, ZOU KAIMING, XIONG SIMING, XIONG ZHI, GAN MAOHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DUAN YUANZHEN
LI JUN
ZOU KAIMING
XIONG SIMING
XIONG ZHI
GAN MAOHUI
description The utility model discloses a pile pier type two-way berthing pier structure which comprises a bearing platform, a pile foundation and a pier body, the pile foundation is fixedly connected with the bottom of the bearing platform, the pier body is fixedly connected to the top of the bearing platform, waterproof plate clamping grooves are formed in the two sides of the pier body, a plurality of fixed bollards are fixedly connected to the upstream face of the pier body, and the fixed bollards are fixedly connected to the bottom of the bearing platform. A fixed bollard embedded part is arranged on the side, away from the fixed bollard, of the pier body. The ship berthing problem of the proposed ship lock can be solved by utilizing the characteristics of the structure; the ship lock is expanded without rebuilding a berthing building, so that the engineering investment is saved; the influence on the plane arrangement of the extended ship lock is reduced; and a water-stop sheet mounting groove is reserved, so that a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215715050UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215715050UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215715050UU3</originalsourceid><addsrcrecordid>eNrjZDAJyMxJVSjITC1SKKksSFVIykzJLEpNLsnMz0vMUUhKLSrJyMxLhygoLikqTS4pLUrlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhqbmhqYGpgahocZEKQIAr_st7A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile pier type bidirectional berthing pier structure</title><source>esp@cenet</source><creator>DUAN YUANZHEN ; LI JUN ; ZOU KAIMING ; XIONG SIMING ; XIONG ZHI ; GAN MAOHUI</creator><creatorcontrib>DUAN YUANZHEN ; LI JUN ; ZOU KAIMING ; XIONG SIMING ; XIONG ZHI ; GAN MAOHUI</creatorcontrib><description>The utility model discloses a pile pier type two-way berthing pier structure which comprises a bearing platform, a pile foundation and a pier body, the pile foundation is fixedly connected with the bottom of the bearing platform, the pier body is fixedly connected to the top of the bearing platform, waterproof plate clamping grooves are formed in the two sides of the pier body, a plurality of fixed bollards are fixedly connected to the upstream face of the pier body, and the fixed bollards are fixedly connected to the bottom of the bearing platform. A fixed bollard embedded part is arranged on the side, away from the fixed bollard, of the pier body. The ship berthing problem of the proposed ship lock can be solved by utilizing the characteristics of the structure; the ship lock is expanded without rebuilding a berthing building, so that the engineering investment is saved; the influence on the plane arrangement of the extended ship lock is reduced; and a water-stop sheet mounting groove is reserved, so that a</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220201&amp;DB=EPODOC&amp;CC=CN&amp;NR=215715050U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220201&amp;DB=EPODOC&amp;CC=CN&amp;NR=215715050U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DUAN YUANZHEN</creatorcontrib><creatorcontrib>LI JUN</creatorcontrib><creatorcontrib>ZOU KAIMING</creatorcontrib><creatorcontrib>XIONG SIMING</creatorcontrib><creatorcontrib>XIONG ZHI</creatorcontrib><creatorcontrib>GAN MAOHUI</creatorcontrib><title>Pile pier type bidirectional berthing pier structure</title><description>The utility model discloses a pile pier type two-way berthing pier structure which comprises a bearing platform, a pile foundation and a pier body, the pile foundation is fixedly connected with the bottom of the bearing platform, the pier body is fixedly connected to the top of the bearing platform, waterproof plate clamping grooves are formed in the two sides of the pier body, a plurality of fixed bollards are fixedly connected to the upstream face of the pier body, and the fixed bollards are fixedly connected to the bottom of the bearing platform. A fixed bollard embedded part is arranged on the side, away from the fixed bollard, of the pier body. The ship berthing problem of the proposed ship lock can be solved by utilizing the characteristics of the structure; the ship lock is expanded without rebuilding a berthing building, so that the engineering investment is saved; the influence on the plane arrangement of the extended ship lock is reduced; and a water-stop sheet mounting groove is reserved, so that a</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAJyMxJVSjITC1SKKksSFVIykzJLEpNLsnMz0vMUUhKLSrJyMxLhygoLikqTS4pLUrlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhqbmhqYGpgahocZEKQIAr_st7A</recordid><startdate>20220201</startdate><enddate>20220201</enddate><creator>DUAN YUANZHEN</creator><creator>LI JUN</creator><creator>ZOU KAIMING</creator><creator>XIONG SIMING</creator><creator>XIONG ZHI</creator><creator>GAN MAOHUI</creator><scope>EVB</scope></search><sort><creationdate>20220201</creationdate><title>Pile pier type bidirectional berthing pier structure</title><author>DUAN YUANZHEN ; LI JUN ; ZOU KAIMING ; XIONG SIMING ; XIONG ZHI ; GAN MAOHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215715050UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>DUAN YUANZHEN</creatorcontrib><creatorcontrib>LI JUN</creatorcontrib><creatorcontrib>ZOU KAIMING</creatorcontrib><creatorcontrib>XIONG SIMING</creatorcontrib><creatorcontrib>XIONG ZHI</creatorcontrib><creatorcontrib>GAN MAOHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DUAN YUANZHEN</au><au>LI JUN</au><au>ZOU KAIMING</au><au>XIONG SIMING</au><au>XIONG ZHI</au><au>GAN MAOHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile pier type bidirectional berthing pier structure</title><date>2022-02-01</date><risdate>2022</risdate><abstract>The utility model discloses a pile pier type two-way berthing pier structure which comprises a bearing platform, a pile foundation and a pier body, the pile foundation is fixedly connected with the bottom of the bearing platform, the pier body is fixedly connected to the top of the bearing platform, waterproof plate clamping grooves are formed in the two sides of the pier body, a plurality of fixed bollards are fixedly connected to the upstream face of the pier body, and the fixed bollards are fixedly connected to the bottom of the bearing platform. A fixed bollard embedded part is arranged on the side, away from the fixed bollard, of the pier body. The ship berthing problem of the proposed ship lock can be solved by utilizing the characteristics of the structure; the ship lock is expanded without rebuilding a berthing building, so that the engineering investment is saved; the influence on the plane arrangement of the extended ship lock is reduced; and a water-stop sheet mounting groove is reserved, so that a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN215715050UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pile pier type bidirectional berthing pier structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T21%3A41%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DUAN%20YUANZHEN&rft.date=2022-02-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215715050UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true