Main bridge bracket pre-pressing structure
The utility model relates to the technical field of construction, in particular to a main bridge bracket pre-pressing structure which comprises a bracket arranged on a bridge pier and an embedded connecting piece arranged at the top of the bridge pier and further comprises a jacking device and a plu...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG LONG XING YINGYUAN DONG BIN LI XU ZHANG DAWEI ZHANG FAN |
description | The utility model relates to the technical field of construction, in particular to a main bridge bracket pre-pressing structure which comprises a bracket arranged on a bridge pier and an embedded connecting piece arranged at the top of the bridge pier and further comprises a jacking device and a plurality of capping beams. The coping beams are arranged above the bridge piers at intervals through the connecting pieces, the coping beams and the brackets are arranged in the same direction, the bottom faces of the jacking devices make contact with the upper surfaces of the cross beams, the top faces of the jacking devices make contact with the lower surfaces of the corresponding coping beams, and the jacking devices are located on the outer sides of the embedded connecting pieces; the coping beam is connected with the top of the pier, the jacking device such as the jack is arranged in the middle, force is applied to the coping beam through the top of the jack, meanwhile, force is applied to the bracket through th |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215714647UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215714647UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215714647UU3</originalsourceid><addsrcrecordid>eNrjZNDyTczMU0gqykxJTwVSicnZqSUKBUWpukBcXJyZl65QXFJUmlxSWpTKw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDE3NDU3MTMxDQ42JUgQAkSsqDQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Main bridge bracket pre-pressing structure</title><source>esp@cenet</source><creator>ZHANG LONG ; XING YINGYUAN ; DONG BIN ; LI XU ; ZHANG DAWEI ; ZHANG FAN</creator><creatorcontrib>ZHANG LONG ; XING YINGYUAN ; DONG BIN ; LI XU ; ZHANG DAWEI ; ZHANG FAN</creatorcontrib><description>The utility model relates to the technical field of construction, in particular to a main bridge bracket pre-pressing structure which comprises a bracket arranged on a bridge pier and an embedded connecting piece arranged at the top of the bridge pier and further comprises a jacking device and a plurality of capping beams. The coping beams are arranged above the bridge piers at intervals through the connecting pieces, the coping beams and the brackets are arranged in the same direction, the bottom faces of the jacking devices make contact with the upper surfaces of the cross beams, the top faces of the jacking devices make contact with the lower surfaces of the corresponding coping beams, and the jacking devices are located on the outer sides of the embedded connecting pieces; the coping beam is connected with the top of the pier, the jacking device such as the jack is arranged in the middle, force is applied to the coping beam through the top of the jack, meanwhile, force is applied to the bracket through th</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220201&DB=EPODOC&CC=CN&NR=215714647U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220201&DB=EPODOC&CC=CN&NR=215714647U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG LONG</creatorcontrib><creatorcontrib>XING YINGYUAN</creatorcontrib><creatorcontrib>DONG BIN</creatorcontrib><creatorcontrib>LI XU</creatorcontrib><creatorcontrib>ZHANG DAWEI</creatorcontrib><creatorcontrib>ZHANG FAN</creatorcontrib><title>Main bridge bracket pre-pressing structure</title><description>The utility model relates to the technical field of construction, in particular to a main bridge bracket pre-pressing structure which comprises a bracket arranged on a bridge pier and an embedded connecting piece arranged at the top of the bridge pier and further comprises a jacking device and a plurality of capping beams. The coping beams are arranged above the bridge piers at intervals through the connecting pieces, the coping beams and the brackets are arranged in the same direction, the bottom faces of the jacking devices make contact with the upper surfaces of the cross beams, the top faces of the jacking devices make contact with the lower surfaces of the corresponding coping beams, and the jacking devices are located on the outer sides of the embedded connecting pieces; the coping beam is connected with the top of the pier, the jacking device such as the jack is arranged in the middle, force is applied to the coping beam through the top of the jack, meanwhile, force is applied to the bracket through th</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDyTczMU0gqykxJTwVSicnZqSUKBUWpukBcXJyZl65QXFJUmlxSWpTKw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDE3NDU3MTMxDQ42JUgQAkSsqDQ</recordid><startdate>20220201</startdate><enddate>20220201</enddate><creator>ZHANG LONG</creator><creator>XING YINGYUAN</creator><creator>DONG BIN</creator><creator>LI XU</creator><creator>ZHANG DAWEI</creator><creator>ZHANG FAN</creator><scope>EVB</scope></search><sort><creationdate>20220201</creationdate><title>Main bridge bracket pre-pressing structure</title><author>ZHANG LONG ; XING YINGYUAN ; DONG BIN ; LI XU ; ZHANG DAWEI ; ZHANG FAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215714647UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG LONG</creatorcontrib><creatorcontrib>XING YINGYUAN</creatorcontrib><creatorcontrib>DONG BIN</creatorcontrib><creatorcontrib>LI XU</creatorcontrib><creatorcontrib>ZHANG DAWEI</creatorcontrib><creatorcontrib>ZHANG FAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG LONG</au><au>XING YINGYUAN</au><au>DONG BIN</au><au>LI XU</au><au>ZHANG DAWEI</au><au>ZHANG FAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Main bridge bracket pre-pressing structure</title><date>2022-02-01</date><risdate>2022</risdate><abstract>The utility model relates to the technical field of construction, in particular to a main bridge bracket pre-pressing structure which comprises a bracket arranged on a bridge pier and an embedded connecting piece arranged at the top of the bridge pier and further comprises a jacking device and a plurality of capping beams. The coping beams are arranged above the bridge piers at intervals through the connecting pieces, the coping beams and the brackets are arranged in the same direction, the bottom faces of the jacking devices make contact with the upper surfaces of the cross beams, the top faces of the jacking devices make contact with the lower surfaces of the corresponding coping beams, and the jacking devices are located on the outer sides of the embedded connecting pieces; the coping beam is connected with the top of the pier, the jacking device such as the jack is arranged in the middle, force is applied to the coping beam through the top of the jack, meanwhile, force is applied to the bracket through th</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN215714647UU |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Main bridge bracket pre-pressing structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T19%3A18%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20LONG&rft.date=2022-02-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215714647UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |