Post-adding cantilever structure
The utility model provides a post-overhanging structure which comprises a floor slab, a boundary beam and an overhanging beam, the boundary beam is located on the edge of the floor slab, the overhanging beam is perpendicular to the boundary beam, a cast-in-place groove is formed in the floor slab, t...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YU WEI WANG XIUHUA WU YONGWEI QIAN PENG ZHANG HAO MA FEI ZHOU ZHENGJIU WEI HUIQIANG HUANG TAIJIE |
description | The utility model provides a post-overhanging structure which comprises a floor slab, a boundary beam and an overhanging beam, the boundary beam is located on the edge of the floor slab, the overhanging beam is perpendicular to the boundary beam, a cast-in-place groove is formed in the floor slab, the overhanging beam comprises an installation section, a connection section and an overhanging section which are connected in sequence, and the installation section, the connection section and the overhanging section are perpendicular to each other. At least part of the mounting section is fixed in the cast-in-place groove, a groove is formed in the bottom of the connecting section, the connecting section is clamped to the top of the edge beam through the groove, and the overhanging section overhangs outwards in the direction away from the floor slab. At least part of the mounting section is fixed in the cast-in-place groove of the floor slab, and the groove is formed to enable the connecting section to be connecte |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215671273UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215671273UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215671273UU3</originalsourceid><addsrcrecordid>eNrjZFAIyC8u0U1MScnMS1dITswrycxJLUstUiguKSpNLiktSuVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGpmbmhkbmxqGhxkQpAgDH1iZ3</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Post-adding cantilever structure</title><source>esp@cenet</source><creator>YU WEI ; WANG XIUHUA ; WU YONGWEI ; QIAN PENG ; ZHANG HAO ; MA FEI ; ZHOU ZHENGJIU ; WEI HUIQIANG ; HUANG TAIJIE</creator><creatorcontrib>YU WEI ; WANG XIUHUA ; WU YONGWEI ; QIAN PENG ; ZHANG HAO ; MA FEI ; ZHOU ZHENGJIU ; WEI HUIQIANG ; HUANG TAIJIE</creatorcontrib><description>The utility model provides a post-overhanging structure which comprises a floor slab, a boundary beam and an overhanging beam, the boundary beam is located on the edge of the floor slab, the overhanging beam is perpendicular to the boundary beam, a cast-in-place groove is formed in the floor slab, the overhanging beam comprises an installation section, a connection section and an overhanging section which are connected in sequence, and the installation section, the connection section and the overhanging section are perpendicular to each other. At least part of the mounting section is fixed in the cast-in-place groove, a groove is formed in the bottom of the connecting section, the connecting section is clamped to the top of the edge beam through the groove, and the overhanging section overhangs outwards in the direction away from the floor slab. At least part of the mounting section is fixed in the cast-in-place groove of the floor slab, and the groove is formed to enable the connecting section to be connecte</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220128&DB=EPODOC&CC=CN&NR=215671273U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220128&DB=EPODOC&CC=CN&NR=215671273U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>WANG XIUHUA</creatorcontrib><creatorcontrib>WU YONGWEI</creatorcontrib><creatorcontrib>QIAN PENG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>MA FEI</creatorcontrib><creatorcontrib>ZHOU ZHENGJIU</creatorcontrib><creatorcontrib>WEI HUIQIANG</creatorcontrib><creatorcontrib>HUANG TAIJIE</creatorcontrib><title>Post-adding cantilever structure</title><description>The utility model provides a post-overhanging structure which comprises a floor slab, a boundary beam and an overhanging beam, the boundary beam is located on the edge of the floor slab, the overhanging beam is perpendicular to the boundary beam, a cast-in-place groove is formed in the floor slab, the overhanging beam comprises an installation section, a connection section and an overhanging section which are connected in sequence, and the installation section, the connection section and the overhanging section are perpendicular to each other. At least part of the mounting section is fixed in the cast-in-place groove, a groove is formed in the bottom of the connecting section, the connecting section is clamped to the top of the edge beam through the groove, and the overhanging section overhangs outwards in the direction away from the floor slab. At least part of the mounting section is fixed in the cast-in-place groove of the floor slab, and the groove is formed to enable the connecting section to be connecte</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAIyC8u0U1MScnMS1dITswrycxJLUstUiguKSpNLiktSuVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGpmbmhkbmxqGhxkQpAgDH1iZ3</recordid><startdate>20220128</startdate><enddate>20220128</enddate><creator>YU WEI</creator><creator>WANG XIUHUA</creator><creator>WU YONGWEI</creator><creator>QIAN PENG</creator><creator>ZHANG HAO</creator><creator>MA FEI</creator><creator>ZHOU ZHENGJIU</creator><creator>WEI HUIQIANG</creator><creator>HUANG TAIJIE</creator><scope>EVB</scope></search><sort><creationdate>20220128</creationdate><title>Post-adding cantilever structure</title><author>YU WEI ; WANG XIUHUA ; WU YONGWEI ; QIAN PENG ; ZHANG HAO ; MA FEI ; ZHOU ZHENGJIU ; WEI HUIQIANG ; HUANG TAIJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215671273UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>WANG XIUHUA</creatorcontrib><creatorcontrib>WU YONGWEI</creatorcontrib><creatorcontrib>QIAN PENG</creatorcontrib><creatorcontrib>ZHANG HAO</creatorcontrib><creatorcontrib>MA FEI</creatorcontrib><creatorcontrib>ZHOU ZHENGJIU</creatorcontrib><creatorcontrib>WEI HUIQIANG</creatorcontrib><creatorcontrib>HUANG TAIJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YU WEI</au><au>WANG XIUHUA</au><au>WU YONGWEI</au><au>QIAN PENG</au><au>ZHANG HAO</au><au>MA FEI</au><au>ZHOU ZHENGJIU</au><au>WEI HUIQIANG</au><au>HUANG TAIJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Post-adding cantilever structure</title><date>2022-01-28</date><risdate>2022</risdate><abstract>The utility model provides a post-overhanging structure which comprises a floor slab, a boundary beam and an overhanging beam, the boundary beam is located on the edge of the floor slab, the overhanging beam is perpendicular to the boundary beam, a cast-in-place groove is formed in the floor slab, the overhanging beam comprises an installation section, a connection section and an overhanging section which are connected in sequence, and the installation section, the connection section and the overhanging section are perpendicular to each other. At least part of the mounting section is fixed in the cast-in-place groove, a groove is formed in the bottom of the connecting section, the connecting section is clamped to the top of the edge beam through the groove, and the overhanging section overhangs outwards in the direction away from the floor slab. At least part of the mounting section is fixed in the cast-in-place groove of the floor slab, and the groove is formed to enable the connecting section to be connecte</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN215671273UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Post-adding cantilever structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T17%3A35%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YU%20WEI&rft.date=2022-01-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215671273UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |