Prefabricated E-shaped reinforced concrete hydroelectric tube well
The prefabricated E-shaped reinforced concrete hydroelectric tube well comprises a main plate and an auxiliary plate, a traction assembly is arranged at the top of the main plate, an installation assembly is arranged in the auxiliary plate, and a trapezoidal groove is formed in the outer surface of...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XING YUQIANG ZHANG HUAFENG LI RONGLU |
description | The prefabricated E-shaped reinforced concrete hydroelectric tube well comprises a main plate and an auxiliary plate, a traction assembly is arranged at the top of the main plate, an installation assembly is arranged in the auxiliary plate, and a trapezoidal groove is formed in the outer surface of the main plate; according to the scheme, factory processing and prefabrication, on-site hoisting construction, anchoring of top node steel bars into a top plate beam and pouring of the node and top plate concrete are adopted, so that only hoisting and node steel bar binding operation are left on site, construction is easy and convenient, the construction efficiency is greatly improved, meanwhile, the main plate and the auxiliary plate are designed in a separated mode, and transportation is convenient; compared with the prior art, the prefabricated member has the advantages that the prefabricated member is simple in structure, the damage rate during transportation is reduced, the transportation and carrying efficien |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215518870UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215518870UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215518870UU3</originalsourceid><addsrcrecordid>eNrjZHAKKEpNS0wqykxOLElNUXDVLc5ILAAyilIz89Lyi5KBzOT8vOSi1JJUhYzKlKL81JzU5BKgcoWS0qRUhfLUnBweBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLv7GdkaGpqaGFhbhAaakyUIgDCVTMj</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prefabricated E-shaped reinforced concrete hydroelectric tube well</title><source>esp@cenet</source><creator>XING YUQIANG ; ZHANG HUAFENG ; LI RONGLU</creator><creatorcontrib>XING YUQIANG ; ZHANG HUAFENG ; LI RONGLU</creatorcontrib><description>The prefabricated E-shaped reinforced concrete hydroelectric tube well comprises a main plate and an auxiliary plate, a traction assembly is arranged at the top of the main plate, an installation assembly is arranged in the auxiliary plate, and a trapezoidal groove is formed in the outer surface of the main plate; according to the scheme, factory processing and prefabrication, on-site hoisting construction, anchoring of top node steel bars into a top plate beam and pouring of the node and top plate concrete are adopted, so that only hoisting and node steel bar binding operation are left on site, construction is easy and convenient, the construction efficiency is greatly improved, meanwhile, the main plate and the auxiliary plate are designed in a separated mode, and transportation is convenient; compared with the prior art, the prefabricated member has the advantages that the prefabricated member is simple in structure, the damage rate during transportation is reduced, the transportation and carrying efficien</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220114&DB=EPODOC&CC=CN&NR=215518870U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220114&DB=EPODOC&CC=CN&NR=215518870U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XING YUQIANG</creatorcontrib><creatorcontrib>ZHANG HUAFENG</creatorcontrib><creatorcontrib>LI RONGLU</creatorcontrib><title>Prefabricated E-shaped reinforced concrete hydroelectric tube well</title><description>The prefabricated E-shaped reinforced concrete hydroelectric tube well comprises a main plate and an auxiliary plate, a traction assembly is arranged at the top of the main plate, an installation assembly is arranged in the auxiliary plate, and a trapezoidal groove is formed in the outer surface of the main plate; according to the scheme, factory processing and prefabrication, on-site hoisting construction, anchoring of top node steel bars into a top plate beam and pouring of the node and top plate concrete are adopted, so that only hoisting and node steel bar binding operation are left on site, construction is easy and convenient, the construction efficiency is greatly improved, meanwhile, the main plate and the auxiliary plate are designed in a separated mode, and transportation is convenient; compared with the prior art, the prefabricated member has the advantages that the prefabricated member is simple in structure, the damage rate during transportation is reduced, the transportation and carrying efficien</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAKKEpNS0wqykxOLElNUXDVLc5ILAAyilIz89Lyi5KBzOT8vOSi1JJUhYzKlKL81JzU5BKgcoWS0qRUhfLUnBweBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLv7GdkaGpqaGFhbhAaakyUIgDCVTMj</recordid><startdate>20220114</startdate><enddate>20220114</enddate><creator>XING YUQIANG</creator><creator>ZHANG HUAFENG</creator><creator>LI RONGLU</creator><scope>EVB</scope></search><sort><creationdate>20220114</creationdate><title>Prefabricated E-shaped reinforced concrete hydroelectric tube well</title><author>XING YUQIANG ; ZHANG HUAFENG ; LI RONGLU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215518870UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XING YUQIANG</creatorcontrib><creatorcontrib>ZHANG HUAFENG</creatorcontrib><creatorcontrib>LI RONGLU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XING YUQIANG</au><au>ZHANG HUAFENG</au><au>LI RONGLU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prefabricated E-shaped reinforced concrete hydroelectric tube well</title><date>2022-01-14</date><risdate>2022</risdate><abstract>The prefabricated E-shaped reinforced concrete hydroelectric tube well comprises a main plate and an auxiliary plate, a traction assembly is arranged at the top of the main plate, an installation assembly is arranged in the auxiliary plate, and a trapezoidal groove is formed in the outer surface of the main plate; according to the scheme, factory processing and prefabrication, on-site hoisting construction, anchoring of top node steel bars into a top plate beam and pouring of the node and top plate concrete are adopted, so that only hoisting and node steel bar binding operation are left on site, construction is easy and convenient, the construction efficiency is greatly improved, meanwhile, the main plate and the auxiliary plate are designed in a separated mode, and transportation is convenient; compared with the prior art, the prefabricated member has the advantages that the prefabricated member is simple in structure, the damage rate during transportation is reduced, the transportation and carrying efficien</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN215518870UU |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Prefabricated E-shaped reinforced concrete hydroelectric tube well |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T11%3A10%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XING%20YUQIANG&rft.date=2022-01-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215518870UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |