Railway tunnel bottom structure
The utility model belongs to the field of underground engineering supporting structures, and particularly relates to a railway tunnel bottom structure. The tunnel structure comprises a tunnel and further comprises a pre-deformation inverted arch with the rise-span ratio of 1/12-1/5, and buffer layer...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG LEI HE CONG FANG ZHENHUA LI ZHENGHUI WANG JIA TAO WEIMING ZOU YILUN LIAO XIONG SONG YANG CHEN JUN WANG YIMIN SHU DONGLI |
description | The utility model belongs to the field of underground engineering supporting structures, and particularly relates to a railway tunnel bottom structure. The tunnel structure comprises a tunnel and further comprises a pre-deformation inverted arch with the rise-span ratio of 1/12-1/5, and buffer layers are arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel. When the bottom of the high-speed railway tunnel bulges, the pre-deformation inverted arch can reduce a track lifting value caused by the bulge of the bottom of the tunnel, so that the smoothness of a track structure is ensured; besides, buffer layers are further arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel, so that enough buffer space can be reserved in the construction process, and cracking of the pre-deformation inverted arch caused by long-time action of horizontal structural stress can be prevented. Therefore, the upheaval phenomenon at the bottom of the high-speed railway |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215170036UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215170036UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215170036UU3</originalsourceid><addsrcrecordid>eNrjZJAPSszMKU-sVCgpzctLzVFIyi8pyc9VKC4pKk0uKS1K5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoamhuYGBsZmoaHGRCkCAKVQJiE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Railway tunnel bottom structure</title><source>esp@cenet</source><creator>WANG LEI ; HE CONG ; FANG ZHENHUA ; LI ZHENGHUI ; WANG JIA ; TAO WEIMING ; ZOU YILUN ; LIAO XIONG ; SONG YANG ; CHEN JUN ; WANG YIMIN ; SHU DONGLI</creator><creatorcontrib>WANG LEI ; HE CONG ; FANG ZHENHUA ; LI ZHENGHUI ; WANG JIA ; TAO WEIMING ; ZOU YILUN ; LIAO XIONG ; SONG YANG ; CHEN JUN ; WANG YIMIN ; SHU DONGLI</creatorcontrib><description>The utility model belongs to the field of underground engineering supporting structures, and particularly relates to a railway tunnel bottom structure. The tunnel structure comprises a tunnel and further comprises a pre-deformation inverted arch with the rise-span ratio of 1/12-1/5, and buffer layers are arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel. When the bottom of the high-speed railway tunnel bulges, the pre-deformation inverted arch can reduce a track lifting value caused by the bulge of the bottom of the tunnel, so that the smoothness of a track structure is ensured; besides, buffer layers are further arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel, so that enough buffer space can be reserved in the construction process, and cracking of the pre-deformation inverted arch caused by long-time action of horizontal structural stress can be prevented. Therefore, the upheaval phenomenon at the bottom of the high-speed railway</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211214&DB=EPODOC&CC=CN&NR=215170036U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211214&DB=EPODOC&CC=CN&NR=215170036U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>HE CONG</creatorcontrib><creatorcontrib>FANG ZHENHUA</creatorcontrib><creatorcontrib>LI ZHENGHUI</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>TAO WEIMING</creatorcontrib><creatorcontrib>ZOU YILUN</creatorcontrib><creatorcontrib>LIAO XIONG</creatorcontrib><creatorcontrib>SONG YANG</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>WANG YIMIN</creatorcontrib><creatorcontrib>SHU DONGLI</creatorcontrib><title>Railway tunnel bottom structure</title><description>The utility model belongs to the field of underground engineering supporting structures, and particularly relates to a railway tunnel bottom structure. The tunnel structure comprises a tunnel and further comprises a pre-deformation inverted arch with the rise-span ratio of 1/12-1/5, and buffer layers are arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel. When the bottom of the high-speed railway tunnel bulges, the pre-deformation inverted arch can reduce a track lifting value caused by the bulge of the bottom of the tunnel, so that the smoothness of a track structure is ensured; besides, buffer layers are further arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel, so that enough buffer space can be reserved in the construction process, and cracking of the pre-deformation inverted arch caused by long-time action of horizontal structural stress can be prevented. Therefore, the upheaval phenomenon at the bottom of the high-speed railway</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAPSszMKU-sVCgpzctLzVFIyi8pyc9VKC4pKk0uKS1K5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoamhuYGBsZmoaHGRCkCAKVQJiE</recordid><startdate>20211214</startdate><enddate>20211214</enddate><creator>WANG LEI</creator><creator>HE CONG</creator><creator>FANG ZHENHUA</creator><creator>LI ZHENGHUI</creator><creator>WANG JIA</creator><creator>TAO WEIMING</creator><creator>ZOU YILUN</creator><creator>LIAO XIONG</creator><creator>SONG YANG</creator><creator>CHEN JUN</creator><creator>WANG YIMIN</creator><creator>SHU DONGLI</creator><scope>EVB</scope></search><sort><creationdate>20211214</creationdate><title>Railway tunnel bottom structure</title><author>WANG LEI ; HE CONG ; FANG ZHENHUA ; LI ZHENGHUI ; WANG JIA ; TAO WEIMING ; ZOU YILUN ; LIAO XIONG ; SONG YANG ; CHEN JUN ; WANG YIMIN ; SHU DONGLI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215170036UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>HE CONG</creatorcontrib><creatorcontrib>FANG ZHENHUA</creatorcontrib><creatorcontrib>LI ZHENGHUI</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>TAO WEIMING</creatorcontrib><creatorcontrib>ZOU YILUN</creatorcontrib><creatorcontrib>LIAO XIONG</creatorcontrib><creatorcontrib>SONG YANG</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>WANG YIMIN</creatorcontrib><creatorcontrib>SHU DONGLI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG LEI</au><au>HE CONG</au><au>FANG ZHENHUA</au><au>LI ZHENGHUI</au><au>WANG JIA</au><au>TAO WEIMING</au><au>ZOU YILUN</au><au>LIAO XIONG</au><au>SONG YANG</au><au>CHEN JUN</au><au>WANG YIMIN</au><au>SHU DONGLI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Railway tunnel bottom structure</title><date>2021-12-14</date><risdate>2021</risdate><abstract>The utility model belongs to the field of underground engineering supporting structures, and particularly relates to a railway tunnel bottom structure. The tunnel structure comprises a tunnel and further comprises a pre-deformation inverted arch with the rise-span ratio of 1/12-1/5, and buffer layers are arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel. When the bottom of the high-speed railway tunnel bulges, the pre-deformation inverted arch can reduce a track lifting value caused by the bulge of the bottom of the tunnel, so that the smoothness of a track structure is ensured; besides, buffer layers are further arranged at the bottom of the pre-deformation inverted arch and the bottom of the tunnel, so that enough buffer space can be reserved in the construction process, and cracking of the pre-deformation inverted arch caused by long-time action of horizontal structural stress can be prevented. Therefore, the upheaval phenomenon at the bottom of the high-speed railway</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN215170036UU |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Railway tunnel bottom structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T07%3A34%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20LEI&rft.date=2021-12-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215170036UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |