Prefabricated pipe pile perpendicularity detecting and adjusting device
The utility model discloses a prefabricated pipe pile verticality detecting and adjusting device which comprises an upper steel plate frame, a lower steel plate frame and four vertical rods, the vertical rods are used for connecting the upper steel plate frame and the lower steel plate frame, corner...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SHEN WEICHENG LIU XIAOHAN CUI JIAN SHENG HONGZHAO XU LEI FU SHUSHENG WEI MING |
description | The utility model discloses a prefabricated pipe pile verticality detecting and adjusting device which comprises an upper steel plate frame, a lower steel plate frame and four vertical rods, the vertical rods are used for connecting the upper steel plate frame and the lower steel plate frame, corners of the upper steel plate frame and the lower steel plate frame are reinforced by angle iron, adjustable nuts are installed in the middle positions of four faces of the upper steel plate frame in a penetrating mode, and the adjustable nuts are connected with the upper steel plate frame and the lower steel plate frame in a penetrating mode. A long screw rod penetrates through the adjustable nut, a hand wheel is welded to one end of the long screw rod, and a limiting nut is screwed and fixed to the other end of the long screw rod. According to the prefabricated pipe pile perpendicularity detecting and adjusting device, four sets of long bolts are designed, the positions can be flexibly adjusted, and adjustment can b |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN215105557UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN215105557UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN215105557UU3</originalsourceid><addsrcrecordid>eNrjZHAPKEpNS0wqykxOLElNUSjILEgFEjlAIrWoIDUvJTO5NCexKLOkUiEltSQ1uSQzL10hMS9FITElq7QYzEtJLctMTuVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGpoYGpqam5qGhxkQpAgAd3jVL</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prefabricated pipe pile perpendicularity detecting and adjusting device</title><source>esp@cenet</source><creator>SHEN WEICHENG ; LIU XIAOHAN ; CUI JIAN ; SHENG HONGZHAO ; XU LEI ; FU SHUSHENG ; WEI MING</creator><creatorcontrib>SHEN WEICHENG ; LIU XIAOHAN ; CUI JIAN ; SHENG HONGZHAO ; XU LEI ; FU SHUSHENG ; WEI MING</creatorcontrib><description>The utility model discloses a prefabricated pipe pile verticality detecting and adjusting device which comprises an upper steel plate frame, a lower steel plate frame and four vertical rods, the vertical rods are used for connecting the upper steel plate frame and the lower steel plate frame, corners of the upper steel plate frame and the lower steel plate frame are reinforced by angle iron, adjustable nuts are installed in the middle positions of four faces of the upper steel plate frame in a penetrating mode, and the adjustable nuts are connected with the upper steel plate frame and the lower steel plate frame in a penetrating mode. A long screw rod penetrates through the adjustable nut, a hand wheel is welded to one end of the long screw rod, and a limiting nut is screwed and fixed to the other end of the long screw rod. According to the prefabricated pipe pile perpendicularity detecting and adjusting device, four sets of long bolts are designed, the positions can be flexibly adjusted, and adjustment can b</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211210&DB=EPODOC&CC=CN&NR=215105557U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211210&DB=EPODOC&CC=CN&NR=215105557U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHEN WEICHENG</creatorcontrib><creatorcontrib>LIU XIAOHAN</creatorcontrib><creatorcontrib>CUI JIAN</creatorcontrib><creatorcontrib>SHENG HONGZHAO</creatorcontrib><creatorcontrib>XU LEI</creatorcontrib><creatorcontrib>FU SHUSHENG</creatorcontrib><creatorcontrib>WEI MING</creatorcontrib><title>Prefabricated pipe pile perpendicularity detecting and adjusting device</title><description>The utility model discloses a prefabricated pipe pile verticality detecting and adjusting device which comprises an upper steel plate frame, a lower steel plate frame and four vertical rods, the vertical rods are used for connecting the upper steel plate frame and the lower steel plate frame, corners of the upper steel plate frame and the lower steel plate frame are reinforced by angle iron, adjustable nuts are installed in the middle positions of four faces of the upper steel plate frame in a penetrating mode, and the adjustable nuts are connected with the upper steel plate frame and the lower steel plate frame in a penetrating mode. A long screw rod penetrates through the adjustable nut, a hand wheel is welded to one end of the long screw rod, and a limiting nut is screwed and fixed to the other end of the long screw rod. According to the prefabricated pipe pile perpendicularity detecting and adjusting device, four sets of long bolts are designed, the positions can be flexibly adjusted, and adjustment can b</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAPKEpNS0wqykxOLElNUSjILEgFEjlAIrWoIDUvJTO5NCexKLOkUiEltSQ1uSQzL10hMS9FITElq7QYzEtJLctMTuVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGpoYGpqam5qGhxkQpAgAd3jVL</recordid><startdate>20211210</startdate><enddate>20211210</enddate><creator>SHEN WEICHENG</creator><creator>LIU XIAOHAN</creator><creator>CUI JIAN</creator><creator>SHENG HONGZHAO</creator><creator>XU LEI</creator><creator>FU SHUSHENG</creator><creator>WEI MING</creator><scope>EVB</scope></search><sort><creationdate>20211210</creationdate><title>Prefabricated pipe pile perpendicularity detecting and adjusting device</title><author>SHEN WEICHENG ; LIU XIAOHAN ; CUI JIAN ; SHENG HONGZHAO ; XU LEI ; FU SHUSHENG ; WEI MING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN215105557UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SHEN WEICHENG</creatorcontrib><creatorcontrib>LIU XIAOHAN</creatorcontrib><creatorcontrib>CUI JIAN</creatorcontrib><creatorcontrib>SHENG HONGZHAO</creatorcontrib><creatorcontrib>XU LEI</creatorcontrib><creatorcontrib>FU SHUSHENG</creatorcontrib><creatorcontrib>WEI MING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHEN WEICHENG</au><au>LIU XIAOHAN</au><au>CUI JIAN</au><au>SHENG HONGZHAO</au><au>XU LEI</au><au>FU SHUSHENG</au><au>WEI MING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prefabricated pipe pile perpendicularity detecting and adjusting device</title><date>2021-12-10</date><risdate>2021</risdate><abstract>The utility model discloses a prefabricated pipe pile verticality detecting and adjusting device which comprises an upper steel plate frame, a lower steel plate frame and four vertical rods, the vertical rods are used for connecting the upper steel plate frame and the lower steel plate frame, corners of the upper steel plate frame and the lower steel plate frame are reinforced by angle iron, adjustable nuts are installed in the middle positions of four faces of the upper steel plate frame in a penetrating mode, and the adjustable nuts are connected with the upper steel plate frame and the lower steel plate frame in a penetrating mode. A long screw rod penetrates through the adjustable nut, a hand wheel is welded to one end of the long screw rod, and a limiting nut is screwed and fixed to the other end of the long screw rod. According to the prefabricated pipe pile perpendicularity detecting and adjusting device, four sets of long bolts are designed, the positions can be flexibly adjusted, and adjustment can b</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN215105557UU |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Prefabricated pipe pile perpendicularity detecting and adjusting device |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T14%3A42%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHEN%20WEICHENG&rft.date=2021-12-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN215105557UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |