Foundation pit displacement monitoring device for construction project supervision
The utility model discloses a foundation pit displacement monitoring device for construction project supervision, which relates to the technical field of building construction and comprises a foundation pit support, a datum point prism, a total station and a plurality of monitoring mark components,...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG XIAOMI TONG AINIAN |
description | The utility model discloses a foundation pit displacement monitoring device for construction project supervision, which relates to the technical field of building construction and comprises a foundation pit support, a datum point prism, a total station and a plurality of monitoring mark components, the foundation pit support is square, and the monitoring mark components are uniformly arranged at the top of the foundation pit support. The datum point prism and the total station are both arranged on the ground on one side of the foundation pit support, the monitoring mark assembly comprises an embedded steel bar, a quick disassembly and assembly mechanism, a rotating mechanism and a monitoring point prism, the bottom end of the embedded steel bar is embedded in the foundation pit support, and a mounting sleeve in the quick disassembly and assembly mechanism is arranged on the outer side of the embedded steel bar in a sleeving mode. According to the utility model, the pre-embedding difficulty is effectively redu |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN214993918UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN214993918UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN214993918UU3</originalsourceid><addsrcrecordid>eNqNjLEKwjAQhrM4iPoOh7tDrYOZi8XJQexcQnKVK-1dSC59fgv6AE4_fHzfvzXPVgoHpyQMkRQC5Tg5jzOywixMKon4DQEX8giDJPDCWVPx3ybJiF4hl4hpobyyvdkMbsp4-O3OHNvbq7mfMEqPOa7vjNo3j3N1sba21bXr6r-kD0ETOmw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Foundation pit displacement monitoring device for construction project supervision</title><source>esp@cenet</source><creator>WANG XIAOMI ; TONG AINIAN</creator><creatorcontrib>WANG XIAOMI ; TONG AINIAN</creatorcontrib><description>The utility model discloses a foundation pit displacement monitoring device for construction project supervision, which relates to the technical field of building construction and comprises a foundation pit support, a datum point prism, a total station and a plurality of monitoring mark components, the foundation pit support is square, and the monitoring mark components are uniformly arranged at the top of the foundation pit support. The datum point prism and the total station are both arranged on the ground on one side of the foundation pit support, the monitoring mark assembly comprises an embedded steel bar, a quick disassembly and assembly mechanism, a rotating mechanism and a monitoring point prism, the bottom end of the embedded steel bar is embedded in the foundation pit support, and a mounting sleeve in the quick disassembly and assembly mechanism is arranged on the outer side of the embedded steel bar in a sleeving mode. According to the utility model, the pre-embedding difficulty is effectively redu</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211203&DB=EPODOC&CC=CN&NR=214993918U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211203&DB=EPODOC&CC=CN&NR=214993918U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG XIAOMI</creatorcontrib><creatorcontrib>TONG AINIAN</creatorcontrib><title>Foundation pit displacement monitoring device for construction project supervision</title><description>The utility model discloses a foundation pit displacement monitoring device for construction project supervision, which relates to the technical field of building construction and comprises a foundation pit support, a datum point prism, a total station and a plurality of monitoring mark components, the foundation pit support is square, and the monitoring mark components are uniformly arranged at the top of the foundation pit support. The datum point prism and the total station are both arranged on the ground on one side of the foundation pit support, the monitoring mark assembly comprises an embedded steel bar, a quick disassembly and assembly mechanism, a rotating mechanism and a monitoring point prism, the bottom end of the embedded steel bar is embedded in the foundation pit support, and a mounting sleeve in the quick disassembly and assembly mechanism is arranged on the outer side of the embedded steel bar in a sleeving mode. According to the utility model, the pre-embedding difficulty is effectively redu</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAQhrM4iPoOh7tDrYOZi8XJQexcQnKVK-1dSC59fgv6AE4_fHzfvzXPVgoHpyQMkRQC5Tg5jzOywixMKon4DQEX8giDJPDCWVPx3ybJiF4hl4hpobyyvdkMbsp4-O3OHNvbq7mfMEqPOa7vjNo3j3N1sba21bXr6r-kD0ETOmw</recordid><startdate>20211203</startdate><enddate>20211203</enddate><creator>WANG XIAOMI</creator><creator>TONG AINIAN</creator><scope>EVB</scope></search><sort><creationdate>20211203</creationdate><title>Foundation pit displacement monitoring device for construction project supervision</title><author>WANG XIAOMI ; TONG AINIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN214993918UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG XIAOMI</creatorcontrib><creatorcontrib>TONG AINIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG XIAOMI</au><au>TONG AINIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Foundation pit displacement monitoring device for construction project supervision</title><date>2021-12-03</date><risdate>2021</risdate><abstract>The utility model discloses a foundation pit displacement monitoring device for construction project supervision, which relates to the technical field of building construction and comprises a foundation pit support, a datum point prism, a total station and a plurality of monitoring mark components, the foundation pit support is square, and the monitoring mark components are uniformly arranged at the top of the foundation pit support. The datum point prism and the total station are both arranged on the ground on one side of the foundation pit support, the monitoring mark assembly comprises an embedded steel bar, a quick disassembly and assembly mechanism, a rotating mechanism and a monitoring point prism, the bottom end of the embedded steel bar is embedded in the foundation pit support, and a mounting sleeve in the quick disassembly and assembly mechanism is arranged on the outer side of the embedded steel bar in a sleeving mode. According to the utility model, the pre-embedding difficulty is effectively redu</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN214993918UU |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Foundation pit displacement monitoring device for construction project supervision |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T12%3A41%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20XIAOMI&rft.date=2021-12-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN214993918UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |