Drainage structure of underground subway station construction deformation joint
The utility model discloses a drainage structure of an underground subway station construction deformation joint, which comprises a first wall body and a second wall body, a transversely arranged deformation joint is arranged between the first wall body and the second wall body, a drainage ditch is...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PAN WEIDONG BAI KE XUE DONG SHI ZHIYONG GU ZONGLEI SHI HAOJIE SUN HAIZHEN ZHANG FAGANG SHAO SHILEI JIANG PENGCHENG |
description | The utility model discloses a drainage structure of an underground subway station construction deformation joint, which comprises a first wall body and a second wall body, a transversely arranged deformation joint is arranged between the first wall body and the second wall body, a drainage ditch is arranged on the upper side of the deformation joint, and the drainage ditch is communicated with the deformation joint. The drainage structure for the construction deformation joint of the underground subway station has the advantages that emergency early warning design is carried out on the drainage ditch in the working process, when a drainage opening of the drainage ditch is accidentally blocked, water in the drainage ditch is not prone to leaking to the surface of a wall body in a short time, workers can easily perceive the situation, and the construction efficiency is improved. Meanwhile, the reinforcing device arranged in the connecting groove can reinforce the drainage ditch, collapse and even breakage of th |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN214883900UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN214883900UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN214883900UU3</originalsourceid><addsrcrecordid>eNrjZPB3KUrMzEtMT1UoLikqTS4pLUpVyE9TKM1LSS1KL8oH0grFpUnliZVA-cSSzPw8heT8PIhSECclNS2_KBcikZWfmVfCw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDE0sLIwtDQxCQ42JUgQAdOA5Ig</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Drainage structure of underground subway station construction deformation joint</title><source>esp@cenet</source><creator>PAN WEIDONG ; BAI KE ; XUE DONG ; SHI ZHIYONG ; GU ZONGLEI ; SHI HAOJIE ; SUN HAIZHEN ; ZHANG FAGANG ; SHAO SHILEI ; JIANG PENGCHENG</creator><creatorcontrib>PAN WEIDONG ; BAI KE ; XUE DONG ; SHI ZHIYONG ; GU ZONGLEI ; SHI HAOJIE ; SUN HAIZHEN ; ZHANG FAGANG ; SHAO SHILEI ; JIANG PENGCHENG</creatorcontrib><description>The utility model discloses a drainage structure of an underground subway station construction deformation joint, which comprises a first wall body and a second wall body, a transversely arranged deformation joint is arranged between the first wall body and the second wall body, a drainage ditch is arranged on the upper side of the deformation joint, and the drainage ditch is communicated with the deformation joint. The drainage structure for the construction deformation joint of the underground subway station has the advantages that emergency early warning design is carried out on the drainage ditch in the working process, when a drainage opening of the drainage ditch is accidentally blocked, water in the drainage ditch is not prone to leaking to the surface of a wall body in a short time, workers can easily perceive the situation, and the construction efficiency is improved. Meanwhile, the reinforcing device arranged in the connecting groove can reinforce the drainage ditch, collapse and even breakage of th</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MEASURING ; MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL ; METERING BY VOLUME ; PHYSICS ; SOIL SHIFTING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211126&DB=EPODOC&CC=CN&NR=214883900U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211126&DB=EPODOC&CC=CN&NR=214883900U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN WEIDONG</creatorcontrib><creatorcontrib>BAI KE</creatorcontrib><creatorcontrib>XUE DONG</creatorcontrib><creatorcontrib>SHI ZHIYONG</creatorcontrib><creatorcontrib>GU ZONGLEI</creatorcontrib><creatorcontrib>SHI HAOJIE</creatorcontrib><creatorcontrib>SUN HAIZHEN</creatorcontrib><creatorcontrib>ZHANG FAGANG</creatorcontrib><creatorcontrib>SHAO SHILEI</creatorcontrib><creatorcontrib>JIANG PENGCHENG</creatorcontrib><title>Drainage structure of underground subway station construction deformation joint</title><description>The utility model discloses a drainage structure of an underground subway station construction deformation joint, which comprises a first wall body and a second wall body, a transversely arranged deformation joint is arranged between the first wall body and the second wall body, a drainage ditch is arranged on the upper side of the deformation joint, and the drainage ditch is communicated with the deformation joint. The drainage structure for the construction deformation joint of the underground subway station has the advantages that emergency early warning design is carried out on the drainage ditch in the working process, when a drainage opening of the drainage ditch is accidentally blocked, water in the drainage ditch is not prone to leaking to the surface of a wall body in a short time, workers can easily perceive the situation, and the construction efficiency is improved. Meanwhile, the reinforcing device arranged in the connecting groove can reinforce the drainage ditch, collapse and even breakage of th</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MEASURING</subject><subject>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</subject><subject>METERING BY VOLUME</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPB3KUrMzEtMT1UoLikqTS4pLUpVyE9TKM1LSS1KL8oH0grFpUnliZVA-cSSzPw8heT8PIhSECclNS2_KBcikZWfmVfCw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDE0sLIwtDQxCQ42JUgQAdOA5Ig</recordid><startdate>20211126</startdate><enddate>20211126</enddate><creator>PAN WEIDONG</creator><creator>BAI KE</creator><creator>XUE DONG</creator><creator>SHI ZHIYONG</creator><creator>GU ZONGLEI</creator><creator>SHI HAOJIE</creator><creator>SUN HAIZHEN</creator><creator>ZHANG FAGANG</creator><creator>SHAO SHILEI</creator><creator>JIANG PENGCHENG</creator><scope>EVB</scope></search><sort><creationdate>20211126</creationdate><title>Drainage structure of underground subway station construction deformation joint</title><author>PAN WEIDONG ; BAI KE ; XUE DONG ; SHI ZHIYONG ; GU ZONGLEI ; SHI HAOJIE ; SUN HAIZHEN ; ZHANG FAGANG ; SHAO SHILEI ; JIANG PENGCHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN214883900UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MEASURING</topic><topic>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</topic><topic>METERING BY VOLUME</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN WEIDONG</creatorcontrib><creatorcontrib>BAI KE</creatorcontrib><creatorcontrib>XUE DONG</creatorcontrib><creatorcontrib>SHI ZHIYONG</creatorcontrib><creatorcontrib>GU ZONGLEI</creatorcontrib><creatorcontrib>SHI HAOJIE</creatorcontrib><creatorcontrib>SUN HAIZHEN</creatorcontrib><creatorcontrib>ZHANG FAGANG</creatorcontrib><creatorcontrib>SHAO SHILEI</creatorcontrib><creatorcontrib>JIANG PENGCHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN WEIDONG</au><au>BAI KE</au><au>XUE DONG</au><au>SHI ZHIYONG</au><au>GU ZONGLEI</au><au>SHI HAOJIE</au><au>SUN HAIZHEN</au><au>ZHANG FAGANG</au><au>SHAO SHILEI</au><au>JIANG PENGCHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Drainage structure of underground subway station construction deformation joint</title><date>2021-11-26</date><risdate>2021</risdate><abstract>The utility model discloses a drainage structure of an underground subway station construction deformation joint, which comprises a first wall body and a second wall body, a transversely arranged deformation joint is arranged between the first wall body and the second wall body, a drainage ditch is arranged on the upper side of the deformation joint, and the drainage ditch is communicated with the deformation joint. The drainage structure for the construction deformation joint of the underground subway station has the advantages that emergency early warning design is carried out on the drainage ditch in the working process, when a drainage opening of the drainage ditch is accidentally blocked, water in the drainage ditch is not prone to leaking to the surface of a wall body in a short time, workers can easily perceive the situation, and the construction efficiency is improved. Meanwhile, the reinforcing device arranged in the connecting groove can reinforce the drainage ditch, collapse and even breakage of th</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN214883900UU |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING MEASURING MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL METERING BY VOLUME PHYSICS SOIL SHIFTING TESTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Drainage structure of underground subway station construction deformation joint |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T07%3A35%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20WEIDONG&rft.date=2021-11-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN214883900UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |