Integral unloading device for Bailey beam bracket of urban railway

The utility model discloses an integral unloading device for an urban railway bailey beam bracket. The problems that a bailey beam support in an existing urban railway is troublesome to dismantle, and potential safety hazards exist are solved. The device comprises a support and a connecting piece, a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HONG CHENGPO, ZHONG XINHAI, PAN XINLEI, DU YUNGUO, ZHANG LESONG, GOU CHANGFEI, DAI WEILIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HONG CHENGPO
ZHONG XINHAI
PAN XINLEI
DU YUNGUO
ZHANG LESONG
GOU CHANGFEI
DAI WEILIANG
description The utility model discloses an integral unloading device for an urban railway bailey beam bracket. The problems that a bailey beam support in an existing urban railway is troublesome to dismantle, and potential safety hazards exist are solved. The device comprises a support and a connecting piece, a jack is arranged on the support, one end of the connecting piece is arranged above the jack, the other end of the connecting piece sequentially penetrates through the jack and the support and is used for being connected with a bailey beam support, and a first locking assembly and a second locking assembly are arranged on the connecting piece. At least one of the first locking assembly and the second locking assembly is connected with the connecting piece and used for locking the bailey beam support through the connecting piece. The device has the advantages that the bailey beam support does not need to be disassembled and assembled at high altitude, the assembling and disassembling speed of the bailey beam support
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN214882981UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN214882981UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN214882981UU3</originalsourceid><addsrcrecordid>eNrjZHDyzCtJTS9KzFEozcvJT0zJzEtXSEkty0xOVUjLL1JwSszMSa1USEpNzFVIKkpMzk4tUchPUygtSkrMUygCSpYnVvIwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyNDEwsLI0sLw9BQY6IUAQB9yzKO</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Integral unloading device for Bailey beam bracket of urban railway</title><source>esp@cenet</source><creator>HONG CHENGPO ; ZHONG XINHAI ; PAN XINLEI ; DU YUNGUO ; ZHANG LESONG ; GOU CHANGFEI ; DAI WEILIANG</creator><creatorcontrib>HONG CHENGPO ; ZHONG XINHAI ; PAN XINLEI ; DU YUNGUO ; ZHANG LESONG ; GOU CHANGFEI ; DAI WEILIANG</creatorcontrib><description>The utility model discloses an integral unloading device for an urban railway bailey beam bracket. The problems that a bailey beam support in an existing urban railway is troublesome to dismantle, and potential safety hazards exist are solved. The device comprises a support and a connecting piece, a jack is arranged on the support, one end of the connecting piece is arranged above the jack, the other end of the connecting piece sequentially penetrates through the jack and the support and is used for being connected with a bailey beam support, and a first locking assembly and a second locking assembly are arranged on the connecting piece. At least one of the first locking assembly and the second locking assembly is connected with the connecting piece and used for locking the bailey beam support through the connecting piece. The device has the advantages that the bailey beam support does not need to be disassembled and assembled at high altitude, the assembling and disassembling speed of the bailey beam support</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211126&amp;DB=EPODOC&amp;CC=CN&amp;NR=214882981U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211126&amp;DB=EPODOC&amp;CC=CN&amp;NR=214882981U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HONG CHENGPO</creatorcontrib><creatorcontrib>ZHONG XINHAI</creatorcontrib><creatorcontrib>PAN XINLEI</creatorcontrib><creatorcontrib>DU YUNGUO</creatorcontrib><creatorcontrib>ZHANG LESONG</creatorcontrib><creatorcontrib>GOU CHANGFEI</creatorcontrib><creatorcontrib>DAI WEILIANG</creatorcontrib><title>Integral unloading device for Bailey beam bracket of urban railway</title><description>The utility model discloses an integral unloading device for an urban railway bailey beam bracket. The problems that a bailey beam support in an existing urban railway is troublesome to dismantle, and potential safety hazards exist are solved. The device comprises a support and a connecting piece, a jack is arranged on the support, one end of the connecting piece is arranged above the jack, the other end of the connecting piece sequentially penetrates through the jack and the support and is used for being connected with a bailey beam support, and a first locking assembly and a second locking assembly are arranged on the connecting piece. At least one of the first locking assembly and the second locking assembly is connected with the connecting piece and used for locking the bailey beam support through the connecting piece. The device has the advantages that the bailey beam support does not need to be disassembled and assembled at high altitude, the assembling and disassembling speed of the bailey beam support</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDyzCtJTS9KzFEozcvJT0zJzEtXSEkty0xOVUjLL1JwSszMSa1USEpNzFVIKkpMzk4tUchPUygtSkrMUygCSpYnVvIwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyNDEwsLI0sLw9BQY6IUAQB9yzKO</recordid><startdate>20211126</startdate><enddate>20211126</enddate><creator>HONG CHENGPO</creator><creator>ZHONG XINHAI</creator><creator>PAN XINLEI</creator><creator>DU YUNGUO</creator><creator>ZHANG LESONG</creator><creator>GOU CHANGFEI</creator><creator>DAI WEILIANG</creator><scope>EVB</scope></search><sort><creationdate>20211126</creationdate><title>Integral unloading device for Bailey beam bracket of urban railway</title><author>HONG CHENGPO ; ZHONG XINHAI ; PAN XINLEI ; DU YUNGUO ; ZHANG LESONG ; GOU CHANGFEI ; DAI WEILIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN214882981UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>HONG CHENGPO</creatorcontrib><creatorcontrib>ZHONG XINHAI</creatorcontrib><creatorcontrib>PAN XINLEI</creatorcontrib><creatorcontrib>DU YUNGUO</creatorcontrib><creatorcontrib>ZHANG LESONG</creatorcontrib><creatorcontrib>GOU CHANGFEI</creatorcontrib><creatorcontrib>DAI WEILIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HONG CHENGPO</au><au>ZHONG XINHAI</au><au>PAN XINLEI</au><au>DU YUNGUO</au><au>ZHANG LESONG</au><au>GOU CHANGFEI</au><au>DAI WEILIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Integral unloading device for Bailey beam bracket of urban railway</title><date>2021-11-26</date><risdate>2021</risdate><abstract>The utility model discloses an integral unloading device for an urban railway bailey beam bracket. The problems that a bailey beam support in an existing urban railway is troublesome to dismantle, and potential safety hazards exist are solved. The device comprises a support and a connecting piece, a jack is arranged on the support, one end of the connecting piece is arranged above the jack, the other end of the connecting piece sequentially penetrates through the jack and the support and is used for being connected with a bailey beam support, and a first locking assembly and a second locking assembly are arranged on the connecting piece. At least one of the first locking assembly and the second locking assembly is connected with the connecting piece and used for locking the bailey beam support through the connecting piece. The device has the advantages that the bailey beam support does not need to be disassembled and assembled at high altitude, the assembling and disassembling speed of the bailey beam support</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN214882981UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Integral unloading device for Bailey beam bracket of urban railway
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T13%3A39%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HONG%20CHENGPO&rft.date=2021-11-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN214882981UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true