Pay-off equipment for building construction
The utility model discloses pay-off equipment for building construction, which comprises two fixed plates, bearing blocks are fixed at the lower ends of the two fixed plates, a U-shaped plate is fixedon one side of one bearing block, a movable plate is fixed on one side of the other bearing block, o...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!