Mining method tunnel with underground power transformation and distribution room

The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WEI, DENG JUNQIANG, TANG HAO, CAO SHIDING, WEI BIN, YIN ZHEBIN, ZHOU HUALONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WEI
DENG JUNQIANG
TANG HAO
CAO SHIDING
WEI BIN
YIN ZHEBIN
ZHOU HUALONG
description The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN211598674UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN211598674UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN211598674UU3</originalsourceid><addsrcrecordid>eNqNirsOwjAMALMwIOAfLHaG8mauQCwgBjpXgbhtpMaOHEf9fSrEBzCddHdT87h58tRCQO3YgWYi7GHw2kEmh9IKj4TIAwqoWEoNS7DqmcCOwfmk4l_5K4Q5zM2ksX3CxY8zs7ycn-V1hZFrTNG-kVDr8r4uit3puD9sq2rz1_QBl9w5Vw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Mining method tunnel with underground power transformation and distribution room</title><source>esp@cenet</source><creator>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</creator><creatorcontrib>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</creatorcontrib><description>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</description><language>chi ; eng</language><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; EARTH DRILLING ; ELECTRICITY ; FIXED CONSTRUCTIONS ; GALLERIES ; GENERATION ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200929&amp;DB=EPODOC&amp;CC=CN&amp;NR=211598674U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200929&amp;DB=EPODOC&amp;CC=CN&amp;NR=211598674U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>DENG JUNQIANG</creatorcontrib><creatorcontrib>TANG HAO</creatorcontrib><creatorcontrib>CAO SHIDING</creatorcontrib><creatorcontrib>WEI BIN</creatorcontrib><creatorcontrib>YIN ZHEBIN</creatorcontrib><creatorcontrib>ZHOU HUALONG</creatorcontrib><title>Mining method tunnel with underground power transformation and distribution room</title><description>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</description><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>EARTH DRILLING</subject><subject>ELECTRICITY</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>GENERATION</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirsOwjAMALMwIOAfLHaG8mauQCwgBjpXgbhtpMaOHEf9fSrEBzCddHdT87h58tRCQO3YgWYi7GHw2kEmh9IKj4TIAwqoWEoNS7DqmcCOwfmk4l_5K4Q5zM2ksX3CxY8zs7ycn-V1hZFrTNG-kVDr8r4uit3puD9sq2rz1_QBl9w5Vw</recordid><startdate>20200929</startdate><enddate>20200929</enddate><creator>WANG WEI</creator><creator>DENG JUNQIANG</creator><creator>TANG HAO</creator><creator>CAO SHIDING</creator><creator>WEI BIN</creator><creator>YIN ZHEBIN</creator><creator>ZHOU HUALONG</creator><scope>EVB</scope></search><sort><creationdate>20200929</creationdate><title>Mining method tunnel with underground power transformation and distribution room</title><author>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN211598674UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>EARTH DRILLING</topic><topic>ELECTRICITY</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>GENERATION</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>DENG JUNQIANG</creatorcontrib><creatorcontrib>TANG HAO</creatorcontrib><creatorcontrib>CAO SHIDING</creatorcontrib><creatorcontrib>WEI BIN</creatorcontrib><creatorcontrib>YIN ZHEBIN</creatorcontrib><creatorcontrib>ZHOU HUALONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>DENG JUNQIANG</au><au>TANG HAO</au><au>CAO SHIDING</au><au>WEI BIN</au><au>YIN ZHEBIN</au><au>ZHOU HUALONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Mining method tunnel with underground power transformation and distribution room</title><date>2020-09-29</date><risdate>2020</risdate><abstract>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN211598674UU
source esp@cenet
subjects BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
EARTH DRILLING
ELECTRICITY
FIXED CONSTRUCTIONS
GALLERIES
GENERATION
LARGE UNDERGROUND CHAMBERS
MINING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SHAFTS
TUNNELS
title Mining method tunnel with underground power transformation and distribution room
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T02%3A34%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2020-09-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN211598674UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true