Mining method tunnel with underground power transformation and distribution room
The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribu...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG WEI DENG JUNQIANG TANG HAO CAO SHIDING WEI BIN YIN ZHEBIN ZHOU HUALONG |
description | The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN211598674UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN211598674UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN211598674UU3</originalsourceid><addsrcrecordid>eNqNirsOwjAMALMwIOAfLHaG8mauQCwgBjpXgbhtpMaOHEf9fSrEBzCddHdT87h58tRCQO3YgWYi7GHw2kEmh9IKj4TIAwqoWEoNS7DqmcCOwfmk4l_5K4Q5zM2ksX3CxY8zs7ycn-V1hZFrTNG-kVDr8r4uit3puD9sq2rz1_QBl9w5Vw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Mining method tunnel with underground power transformation and distribution room</title><source>esp@cenet</source><creator>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</creator><creatorcontrib>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</creatorcontrib><description>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</description><language>chi ; eng</language><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; EARTH DRILLING ; ELECTRICITY ; FIXED CONSTRUCTIONS ; GALLERIES ; GENERATION ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200929&DB=EPODOC&CC=CN&NR=211598674U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200929&DB=EPODOC&CC=CN&NR=211598674U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>DENG JUNQIANG</creatorcontrib><creatorcontrib>TANG HAO</creatorcontrib><creatorcontrib>CAO SHIDING</creatorcontrib><creatorcontrib>WEI BIN</creatorcontrib><creatorcontrib>YIN ZHEBIN</creatorcontrib><creatorcontrib>ZHOU HUALONG</creatorcontrib><title>Mining method tunnel with underground power transformation and distribution room</title><description>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</description><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>EARTH DRILLING</subject><subject>ELECTRICITY</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>GENERATION</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirsOwjAMALMwIOAfLHaG8mauQCwgBjpXgbhtpMaOHEf9fSrEBzCddHdT87h58tRCQO3YgWYi7GHw2kEmh9IKj4TIAwqoWEoNS7DqmcCOwfmk4l_5K4Q5zM2ksX3CxY8zs7ycn-V1hZFrTNG-kVDr8r4uit3puD9sq2rz1_QBl9w5Vw</recordid><startdate>20200929</startdate><enddate>20200929</enddate><creator>WANG WEI</creator><creator>DENG JUNQIANG</creator><creator>TANG HAO</creator><creator>CAO SHIDING</creator><creator>WEI BIN</creator><creator>YIN ZHEBIN</creator><creator>ZHOU HUALONG</creator><scope>EVB</scope></search><sort><creationdate>20200929</creationdate><title>Mining method tunnel with underground power transformation and distribution room</title><author>WANG WEI ; DENG JUNQIANG ; TANG HAO ; CAO SHIDING ; WEI BIN ; YIN ZHEBIN ; ZHOU HUALONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN211598674UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>EARTH DRILLING</topic><topic>ELECTRICITY</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>GENERATION</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>DENG JUNQIANG</creatorcontrib><creatorcontrib>TANG HAO</creatorcontrib><creatorcontrib>CAO SHIDING</creatorcontrib><creatorcontrib>WEI BIN</creatorcontrib><creatorcontrib>YIN ZHEBIN</creatorcontrib><creatorcontrib>ZHOU HUALONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>DENG JUNQIANG</au><au>TANG HAO</au><au>CAO SHIDING</au><au>WEI BIN</au><au>YIN ZHEBIN</au><au>ZHOU HUALONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Mining method tunnel with underground power transformation and distribution room</title><date>2020-09-29</date><risdate>2020</risdate><abstract>The utility model belongs to the technical field of tunnel engineering, and provides a mining method tunnel with an underground power transformation and distribution room. The mining method tunnel comprises two main line tunnels, a transverse channel, an underground power transformation and distribution room tunnel and a cable entry well. The two main line tunnels are arranged in parallel, the transverse channel is perpendicular to the main line tunnels, and the two ends of the transverse channel are communicated with the two main line tunnels respectively. The underground power transformationand distribution room tunnel is located in the middle of the transverse channel, the length extending direction of the underground power transformation and distribution room tunnel is parallel to thelength direction of the transverse channel, and the tunnel and the transverse channel are jointly built. The bottom end of the cable entry well is connected with an underground power transformation and distribution room tunne</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN211598674UU |
source | esp@cenet |
subjects | BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER CONVERSION OR DISTRIBUTION OF ELECTRIC POWER EARTH DRILLING ELECTRICITY FIXED CONSTRUCTIONS GALLERIES GENERATION LARGE UNDERGROUND CHAMBERS MINING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS TUNNELS |
title | Mining method tunnel with underground power transformation and distribution room |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T02%3A34%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2020-09-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN211598674UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |