Road and bridge construction management equipment

The utility model relates to road and bridge construction management equipment. The device comprises a device body, a recording plate is arranged at the lower part of the device body; a fixing block is arranged on the side face of the device body. A recording pen is arranged in the fixed block; a ti...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG GAOFEI, ZHANG XIAN, FANG JUN, LEI YANLI, LYU XINGLI, GE XIAOJIANG, ZHANG HONGLI, GUO ZHENFENG, TU JIAN, JIAO LIQIANG, XI WENKAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG GAOFEI
ZHANG XIAN
FANG JUN
LEI YANLI
LYU XINGLI
GE XIAOJIANG
ZHANG HONGLI
GUO ZHENFENG
TU JIAN
JIAO LIQIANG
XI WENKAI
description The utility model relates to road and bridge construction management equipment. The device comprises a device body, a recording plate is arranged at the lower part of the device body; a fixing block is arranged on the side face of the device body. A recording pen is arranged in the fixed block; a timer is arranged at the upper part of the device body; a sound alarm is arranged on the right side ofthe timer; a reset button is arranged on the lower portion of the timer, a light alarm is further arranged on the side face of the timer, a fixing plate is arranged on the rear side of the device body, a magnetic strip is arranged on the other side of the fixing plate, a protective cover is further arranged on the top of the fixing plate, and the protective cover is hinged to the fixing plate through a hinge column. The system has the advantages of being convenient to manage and accurate in recording. 本实用新型涉及一种路桥施工管理设备,它包括装置本体,所述装置本体下部设置有记录板,所述装置本体侧面设置有固定块,所述固定块内设置有记录笔,所述装置本体上部设置有计时器,所述计时器右侧设置有声报警器,所述计时器下部设置有复位按钮,所述计
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN210199967UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN210199967UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN210199967UU3</originalsourceid><addsrcrecordid>eNrjZDAMyk9MUUjMS1FIKspMSU9VSM7PKy4pKk0uyczPU8hNzEtMT81NzStRSC0szSwAsXgYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhgaGlpaWZeWioMVGKAA2zLOo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Road and bridge construction management equipment</title><source>esp@cenet</source><creator>WANG GAOFEI ; ZHANG XIAN ; FANG JUN ; LEI YANLI ; LYU XINGLI ; GE XIAOJIANG ; ZHANG HONGLI ; GUO ZHENFENG ; TU JIAN ; JIAO LIQIANG ; XI WENKAI</creator><creatorcontrib>WANG GAOFEI ; ZHANG XIAN ; FANG JUN ; LEI YANLI ; LYU XINGLI ; GE XIAOJIANG ; ZHANG HONGLI ; GUO ZHENFENG ; TU JIAN ; JIAO LIQIANG ; XI WENKAI</creatorcontrib><description>The utility model relates to road and bridge construction management equipment. The device comprises a device body, a recording plate is arranged at the lower part of the device body; a fixing block is arranged on the side face of the device body. A recording pen is arranged in the fixed block; a timer is arranged at the upper part of the device body; a sound alarm is arranged on the right side ofthe timer; a reset button is arranged on the lower portion of the timer, a light alarm is further arranged on the side face of the timer, a fixing plate is arranged on the rear side of the device body, a magnetic strip is arranged on the other side of the fixing plate, a protective cover is further arranged on the top of the fixing plate, and the protective cover is hinged to the fixing plate through a hinge column. The system has the advantages of being convenient to manage and accurate in recording. 本实用新型涉及一种路桥施工管理设备,它包括装置本体,所述装置本体下部设置有记录板,所述装置本体侧面设置有固定块,所述固定块内设置有记录笔,所述装置本体上部设置有计时器,所述计时器右侧设置有声报警器,所述计时器下部设置有复位按钮,所述计</description><language>chi ; eng</language><subject>ALARM SYSTEMS ; ORDER TELEGRAPHS ; PHYSICS ; SIGNALLING ; SIGNALLING OR CALLING SYSTEMS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200327&amp;DB=EPODOC&amp;CC=CN&amp;NR=210199967U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200327&amp;DB=EPODOC&amp;CC=CN&amp;NR=210199967U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG GAOFEI</creatorcontrib><creatorcontrib>ZHANG XIAN</creatorcontrib><creatorcontrib>FANG JUN</creatorcontrib><creatorcontrib>LEI YANLI</creatorcontrib><creatorcontrib>LYU XINGLI</creatorcontrib><creatorcontrib>GE XIAOJIANG</creatorcontrib><creatorcontrib>ZHANG HONGLI</creatorcontrib><creatorcontrib>GUO ZHENFENG</creatorcontrib><creatorcontrib>TU JIAN</creatorcontrib><creatorcontrib>JIAO LIQIANG</creatorcontrib><creatorcontrib>XI WENKAI</creatorcontrib><title>Road and bridge construction management equipment</title><description>The utility model relates to road and bridge construction management equipment. The device comprises a device body, a recording plate is arranged at the lower part of the device body; a fixing block is arranged on the side face of the device body. A recording pen is arranged in the fixed block; a timer is arranged at the upper part of the device body; a sound alarm is arranged on the right side ofthe timer; a reset button is arranged on the lower portion of the timer, a light alarm is further arranged on the side face of the timer, a fixing plate is arranged on the rear side of the device body, a magnetic strip is arranged on the other side of the fixing plate, a protective cover is further arranged on the top of the fixing plate, and the protective cover is hinged to the fixing plate through a hinge column. The system has the advantages of being convenient to manage and accurate in recording. 本实用新型涉及一种路桥施工管理设备,它包括装置本体,所述装置本体下部设置有记录板,所述装置本体侧面设置有固定块,所述固定块内设置有记录笔,所述装置本体上部设置有计时器,所述计时器右侧设置有声报警器,所述计时器下部设置有复位按钮,所述计</description><subject>ALARM SYSTEMS</subject><subject>ORDER TELEGRAPHS</subject><subject>PHYSICS</subject><subject>SIGNALLING</subject><subject>SIGNALLING OR CALLING SYSTEMS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAMyk9MUUjMS1FIKspMSU9VSM7PKy4pKk0uyczPU8hNzEtMT81NzStRSC0szSwAsXgYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhgaGlpaWZeWioMVGKAA2zLOo</recordid><startdate>20200327</startdate><enddate>20200327</enddate><creator>WANG GAOFEI</creator><creator>ZHANG XIAN</creator><creator>FANG JUN</creator><creator>LEI YANLI</creator><creator>LYU XINGLI</creator><creator>GE XIAOJIANG</creator><creator>ZHANG HONGLI</creator><creator>GUO ZHENFENG</creator><creator>TU JIAN</creator><creator>JIAO LIQIANG</creator><creator>XI WENKAI</creator><scope>EVB</scope></search><sort><creationdate>20200327</creationdate><title>Road and bridge construction management equipment</title><author>WANG GAOFEI ; ZHANG XIAN ; FANG JUN ; LEI YANLI ; LYU XINGLI ; GE XIAOJIANG ; ZHANG HONGLI ; GUO ZHENFENG ; TU JIAN ; JIAO LIQIANG ; XI WENKAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN210199967UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ALARM SYSTEMS</topic><topic>ORDER TELEGRAPHS</topic><topic>PHYSICS</topic><topic>SIGNALLING</topic><topic>SIGNALLING OR CALLING SYSTEMS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG GAOFEI</creatorcontrib><creatorcontrib>ZHANG XIAN</creatorcontrib><creatorcontrib>FANG JUN</creatorcontrib><creatorcontrib>LEI YANLI</creatorcontrib><creatorcontrib>LYU XINGLI</creatorcontrib><creatorcontrib>GE XIAOJIANG</creatorcontrib><creatorcontrib>ZHANG HONGLI</creatorcontrib><creatorcontrib>GUO ZHENFENG</creatorcontrib><creatorcontrib>TU JIAN</creatorcontrib><creatorcontrib>JIAO LIQIANG</creatorcontrib><creatorcontrib>XI WENKAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG GAOFEI</au><au>ZHANG XIAN</au><au>FANG JUN</au><au>LEI YANLI</au><au>LYU XINGLI</au><au>GE XIAOJIANG</au><au>ZHANG HONGLI</au><au>GUO ZHENFENG</au><au>TU JIAN</au><au>JIAO LIQIANG</au><au>XI WENKAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Road and bridge construction management equipment</title><date>2020-03-27</date><risdate>2020</risdate><abstract>The utility model relates to road and bridge construction management equipment. The device comprises a device body, a recording plate is arranged at the lower part of the device body; a fixing block is arranged on the side face of the device body. A recording pen is arranged in the fixed block; a timer is arranged at the upper part of the device body; a sound alarm is arranged on the right side ofthe timer; a reset button is arranged on the lower portion of the timer, a light alarm is further arranged on the side face of the timer, a fixing plate is arranged on the rear side of the device body, a magnetic strip is arranged on the other side of the fixing plate, a protective cover is further arranged on the top of the fixing plate, and the protective cover is hinged to the fixing plate through a hinge column. The system has the advantages of being convenient to manage and accurate in recording. 本实用新型涉及一种路桥施工管理设备,它包括装置本体,所述装置本体下部设置有记录板,所述装置本体侧面设置有固定块,所述固定块内设置有记录笔,所述装置本体上部设置有计时器,所述计时器右侧设置有声报警器,所述计时器下部设置有复位按钮,所述计</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN210199967UU
source esp@cenet
subjects ALARM SYSTEMS
ORDER TELEGRAPHS
PHYSICS
SIGNALLING
SIGNALLING OR CALLING SYSTEMS
title Road and bridge construction management equipment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T08%3A01%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20GAOFEI&rft.date=2020-03-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN210199967UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true