Primary equipment simulation system tester based on modularization
The utility model discloses a primary equipment simulation system tester based on modularization. Including a housing, a display screen is arranged on the front surface of the shell; a large knob anda small knob which are used for adjusting the main loop and the auxiliary loop are arranged below the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YUAN JIE FANG TAO LI LILI SUN DAOLIN XU GANGGANG ZHANG XIAOLE JIAO WEIXING XUE XIAOLONG ZHONG DAINING CHEN XI SUN HAOJIE JIA WUXUAN SHENG TENGFEI WANG YULIANG LIN DONGKUI ZHOU YUAN JIANG JIANG YIN YIKE ZHAO XIPENG GUO CANJIE |
description | The utility model discloses a primary equipment simulation system tester based on modularization. Including a housing, a display screen is arranged on the front surface of the shell; a large knob anda small knob which are used for adjusting the main loop and the auxiliary loop are arranged below the display screen; a key area is arranged on the right side of the display screen, an on-off key is arranged above the key area, a lifting handle is arranged above the shell, a wiring area is arranged on the left side of the lifting handle, an input aviation plug and an output aviation plug are arranged in the wiring area, an integrated module is arranged in the shell, and two fans are arranged at the upper position and the lower position of the right side of the integrated module respectively. The utility model provides a primary equipment simulation system tester based on modularization. When the traditional test method is used, the average action test time of each set of bus protection contacts is about 240 minute |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN209372998UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN209372998UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN209372998UU3</originalsourceid><addsrcrecordid>eNrjZHAKKMrMTSyqVEgtLM0syE3NK1EozswtzUksyczPUyiuLC5JzVUoSQVSRQpJicWpKQpA4dz8FKCKoswqsCoeBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLv7GdkYGlsbmRpaREaakyUIgAuODQK</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Primary equipment simulation system tester based on modularization</title><source>esp@cenet</source><creator>YUAN JIE ; FANG TAO ; LI LILI ; SUN DAOLIN ; XU GANGGANG ; ZHANG XIAOLE ; JIAO WEIXING ; XUE XIAOLONG ; ZHONG DAINING ; CHEN XI ; SUN HAOJIE ; JIA WUXUAN ; SHENG TENGFEI ; WANG YULIANG ; LIN DONGKUI ; ZHOU YUAN ; JIANG JIANG ; YIN YIKE ; ZHAO XIPENG ; GUO CANJIE</creator><creatorcontrib>YUAN JIE ; FANG TAO ; LI LILI ; SUN DAOLIN ; XU GANGGANG ; ZHANG XIAOLE ; JIAO WEIXING ; XUE XIAOLONG ; ZHONG DAINING ; CHEN XI ; SUN HAOJIE ; JIA WUXUAN ; SHENG TENGFEI ; WANG YULIANG ; LIN DONGKUI ; ZHOU YUAN ; JIANG JIANG ; YIN YIKE ; ZHAO XIPENG ; GUO CANJIE</creatorcontrib><description>The utility model discloses a primary equipment simulation system tester based on modularization. Including a housing, a display screen is arranged on the front surface of the shell; a large knob anda small knob which are used for adjusting the main loop and the auxiliary loop are arranged below the display screen; a key area is arranged on the right side of the display screen, an on-off key is arranged above the key area, a lifting handle is arranged above the shell, a wiring area is arranged on the left side of the lifting handle, an input aviation plug and an output aviation plug are arranged in the wiring area, an integrated module is arranged in the shell, and two fans are arranged at the upper position and the lower position of the right side of the integrated module respectively. The utility model provides a primary equipment simulation system tester based on modularization. When the traditional test method is used, the average action test time of each set of bus protection contacts is about 240 minute</description><language>chi ; eng</language><subject>CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS ; ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR ; ELECTRICITY ; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS ; MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; PRINTED CIRCUITS ; TESTING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190910&DB=EPODOC&CC=CN&NR=209372998U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190910&DB=EPODOC&CC=CN&NR=209372998U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YUAN JIE</creatorcontrib><creatorcontrib>FANG TAO</creatorcontrib><creatorcontrib>LI LILI</creatorcontrib><creatorcontrib>SUN DAOLIN</creatorcontrib><creatorcontrib>XU GANGGANG</creatorcontrib><creatorcontrib>ZHANG XIAOLE</creatorcontrib><creatorcontrib>JIAO WEIXING</creatorcontrib><creatorcontrib>XUE XIAOLONG</creatorcontrib><creatorcontrib>ZHONG DAINING</creatorcontrib><creatorcontrib>CHEN XI</creatorcontrib><creatorcontrib>SUN HAOJIE</creatorcontrib><creatorcontrib>JIA WUXUAN</creatorcontrib><creatorcontrib>SHENG TENGFEI</creatorcontrib><creatorcontrib>WANG YULIANG</creatorcontrib><creatorcontrib>LIN DONGKUI</creatorcontrib><creatorcontrib>ZHOU YUAN</creatorcontrib><creatorcontrib>JIANG JIANG</creatorcontrib><creatorcontrib>YIN YIKE</creatorcontrib><creatorcontrib>ZHAO XIPENG</creatorcontrib><creatorcontrib>GUO CANJIE</creatorcontrib><title>Primary equipment simulation system tester based on modularization</title><description>The utility model discloses a primary equipment simulation system tester based on modularization. Including a housing, a display screen is arranged on the front surface of the shell; a large knob anda small knob which are used for adjusting the main loop and the auxiliary loop are arranged below the display screen; a key area is arranged on the right side of the display screen, an on-off key is arranged above the key area, a lifting handle is arranged above the shell, a wiring area is arranged on the left side of the lifting handle, an input aviation plug and an output aviation plug are arranged in the wiring area, an integrated module is arranged in the shell, and two fans are arranged at the upper position and the lower position of the right side of the integrated module respectively. The utility model provides a primary equipment simulation system tester based on modularization. When the traditional test method is used, the average action test time of each set of bus protection contacts is about 240 minute</description><subject>CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS</subject><subject>ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR</subject><subject>ELECTRICITY</subject><subject>MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS</subject><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>PRINTED CIRCUITS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAKKMrMTSyqVEgtLM0syE3NK1EozswtzUksyczPUyiuLC5JzVUoSQVSRQpJicWpKQpA4dz8FKCKoswqsCoeBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLv7GdkYGlsbmRpaREaakyUIgAuODQK</recordid><startdate>20190910</startdate><enddate>20190910</enddate><creator>YUAN JIE</creator><creator>FANG TAO</creator><creator>LI LILI</creator><creator>SUN DAOLIN</creator><creator>XU GANGGANG</creator><creator>ZHANG XIAOLE</creator><creator>JIAO WEIXING</creator><creator>XUE XIAOLONG</creator><creator>ZHONG DAINING</creator><creator>CHEN XI</creator><creator>SUN HAOJIE</creator><creator>JIA WUXUAN</creator><creator>SHENG TENGFEI</creator><creator>WANG YULIANG</creator><creator>LIN DONGKUI</creator><creator>ZHOU YUAN</creator><creator>JIANG JIANG</creator><creator>YIN YIKE</creator><creator>ZHAO XIPENG</creator><creator>GUO CANJIE</creator><scope>EVB</scope></search><sort><creationdate>20190910</creationdate><title>Primary equipment simulation system tester based on modularization</title><author>YUAN JIE ; FANG TAO ; LI LILI ; SUN DAOLIN ; XU GANGGANG ; ZHANG XIAOLE ; JIAO WEIXING ; XUE XIAOLONG ; ZHONG DAINING ; CHEN XI ; SUN HAOJIE ; JIA WUXUAN ; SHENG TENGFEI ; WANG YULIANG ; LIN DONGKUI ; ZHOU YUAN ; JIANG JIANG ; YIN YIKE ; ZHAO XIPENG ; GUO CANJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN209372998UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS</topic><topic>ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR</topic><topic>ELECTRICITY</topic><topic>MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS</topic><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>PRINTED CIRCUITS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>YUAN JIE</creatorcontrib><creatorcontrib>FANG TAO</creatorcontrib><creatorcontrib>LI LILI</creatorcontrib><creatorcontrib>SUN DAOLIN</creatorcontrib><creatorcontrib>XU GANGGANG</creatorcontrib><creatorcontrib>ZHANG XIAOLE</creatorcontrib><creatorcontrib>JIAO WEIXING</creatorcontrib><creatorcontrib>XUE XIAOLONG</creatorcontrib><creatorcontrib>ZHONG DAINING</creatorcontrib><creatorcontrib>CHEN XI</creatorcontrib><creatorcontrib>SUN HAOJIE</creatorcontrib><creatorcontrib>JIA WUXUAN</creatorcontrib><creatorcontrib>SHENG TENGFEI</creatorcontrib><creatorcontrib>WANG YULIANG</creatorcontrib><creatorcontrib>LIN DONGKUI</creatorcontrib><creatorcontrib>ZHOU YUAN</creatorcontrib><creatorcontrib>JIANG JIANG</creatorcontrib><creatorcontrib>YIN YIKE</creatorcontrib><creatorcontrib>ZHAO XIPENG</creatorcontrib><creatorcontrib>GUO CANJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YUAN JIE</au><au>FANG TAO</au><au>LI LILI</au><au>SUN DAOLIN</au><au>XU GANGGANG</au><au>ZHANG XIAOLE</au><au>JIAO WEIXING</au><au>XUE XIAOLONG</au><au>ZHONG DAINING</au><au>CHEN XI</au><au>SUN HAOJIE</au><au>JIA WUXUAN</au><au>SHENG TENGFEI</au><au>WANG YULIANG</au><au>LIN DONGKUI</au><au>ZHOU YUAN</au><au>JIANG JIANG</au><au>YIN YIKE</au><au>ZHAO XIPENG</au><au>GUO CANJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Primary equipment simulation system tester based on modularization</title><date>2019-09-10</date><risdate>2019</risdate><abstract>The utility model discloses a primary equipment simulation system tester based on modularization. Including a housing, a display screen is arranged on the front surface of the shell; a large knob anda small knob which are used for adjusting the main loop and the auxiliary loop are arranged below the display screen; a key area is arranged on the right side of the display screen, an on-off key is arranged above the key area, a lifting handle is arranged above the shell, a wiring area is arranged on the left side of the lifting handle, an input aviation plug and an output aviation plug are arranged in the wiring area, an integrated module is arranged in the shell, and two fans are arranged at the upper position and the lower position of the right side of the integrated module respectively. The utility model provides a primary equipment simulation system tester based on modularization. When the traditional test method is used, the average action test time of each set of bus protection contacts is about 240 minute</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN209372998UU |
source | esp@cenet |
subjects | CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR ELECTRICITY MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS MEASURING MEASURING ELECTRIC VARIABLES MEASURING MAGNETIC VARIABLES PHYSICS PRINTED CIRCUITS TESTING |
title | Primary equipment simulation system tester based on modularization |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T11%3A15%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YUAN%20JIE&rft.date=2019-09-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN209372998UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |