High stake beam slab formula wharf surface blowdown structure

The utility model discloses a high stake beam slab formula wharf surface blowdown structure, high stake beam slab formula pier includes pier portion and draws bridge, it links to each other with pierportion to draw bridge, the blowdown structure includes sealed tube, intervalve, hose, blowdown branc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU YUE, SHEN JIANXIA, SHAO QI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU YUE
SHEN JIANXIA
SHAO QI
description The utility model discloses a high stake beam slab formula wharf surface blowdown structure, high stake beam slab formula pier includes pier portion and draws bridge, it links to each other with pierportion to draw bridge, the blowdown structure includes sealed tube, intervalve, hose, blowdown branch pipe, dirt collecting tank and blowdown main pipe, be equipped with a plurality of mudholes on the wharf surface of pier portion, be equipped with a sealed tube in every mudhole, the intervalve is pegged graft in the sealed tube, and the bottom of intervalve and hose sealing connection, hose andblowdown branch pipe sealing connection, and blowdown branch pipe and blowdown main pipe all are linked together with dirt collecting tank. The utility model discloses need not dig the escape canal, little to wharf structure destruction, the construction investment is low, adopting the supporting hose of intervalve to use, when blockking up, can taking out the intervalve and dredge or direct the change taking place the dri
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN208328829UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN208328829UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN208328829UU3</originalsourceid><addsrcrecordid>eNrjZLD1yEzPUCguScxOVUhKTcxVKM5JTFJIyy_KLc1JVCjPSCxKUyguLUpLTAbK5-SXp-SX5wGVF5Uml5QWpfIwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTiAqCuvNSSeGc_IwMLYyMLCyPL0FBjohQBAIFJMS8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High stake beam slab formula wharf surface blowdown structure</title><source>esp@cenet</source><creator>LIU YUE ; SHEN JIANXIA ; SHAO QI</creator><creatorcontrib>LIU YUE ; SHEN JIANXIA ; SHAO QI</creatorcontrib><description>The utility model discloses a high stake beam slab formula wharf surface blowdown structure, high stake beam slab formula pier includes pier portion and draws bridge, it links to each other with pierportion to draw bridge, the blowdown structure includes sealed tube, intervalve, hose, blowdown branch pipe, dirt collecting tank and blowdown main pipe, be equipped with a plurality of mudholes on the wharf surface of pier portion, be equipped with a sealed tube in every mudhole, the intervalve is pegged graft in the sealed tube, and the bottom of intervalve and hose sealing connection, hose andblowdown branch pipe sealing connection, and blowdown branch pipe and blowdown main pipe all are linked together with dirt collecting tank. The utility model discloses need not dig the escape canal, little to wharf structure destruction, the construction investment is low, adopting the supporting hose of intervalve to use, when blockking up, can taking out the intervalve and dredge or direct the change taking place the dri</description><language>chi ; eng</language><subject>CESSPOOLS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; WATER SUPPLY</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190104&amp;DB=EPODOC&amp;CC=CN&amp;NR=208328829U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190104&amp;DB=EPODOC&amp;CC=CN&amp;NR=208328829U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YUE</creatorcontrib><creatorcontrib>SHEN JIANXIA</creatorcontrib><creatorcontrib>SHAO QI</creatorcontrib><title>High stake beam slab formula wharf surface blowdown structure</title><description>The utility model discloses a high stake beam slab formula wharf surface blowdown structure, high stake beam slab formula pier includes pier portion and draws bridge, it links to each other with pierportion to draw bridge, the blowdown structure includes sealed tube, intervalve, hose, blowdown branch pipe, dirt collecting tank and blowdown main pipe, be equipped with a plurality of mudholes on the wharf surface of pier portion, be equipped with a sealed tube in every mudhole, the intervalve is pegged graft in the sealed tube, and the bottom of intervalve and hose sealing connection, hose andblowdown branch pipe sealing connection, and blowdown branch pipe and blowdown main pipe all are linked together with dirt collecting tank. The utility model discloses need not dig the escape canal, little to wharf structure destruction, the construction investment is low, adopting the supporting hose of intervalve to use, when blockking up, can taking out the intervalve and dredge or direct the change taking place the dri</description><subject>CESSPOOLS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLD1yEzPUCguScxOVUhKTcxVKM5JTFJIyy_KLc1JVCjPSCxKUyguLUpLTAbK5-SXp-SX5wGVF5Uml5QWpfIwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTiAqCuvNSSeGc_IwMLYyMLCyPL0FBjohQBAIFJMS8</recordid><startdate>20190104</startdate><enddate>20190104</enddate><creator>LIU YUE</creator><creator>SHEN JIANXIA</creator><creator>SHAO QI</creator><scope>EVB</scope></search><sort><creationdate>20190104</creationdate><title>High stake beam slab formula wharf surface blowdown structure</title><author>LIU YUE ; SHEN JIANXIA ; SHAO QI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN208328829UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CESSPOOLS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YUE</creatorcontrib><creatorcontrib>SHEN JIANXIA</creatorcontrib><creatorcontrib>SHAO QI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YUE</au><au>SHEN JIANXIA</au><au>SHAO QI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High stake beam slab formula wharf surface blowdown structure</title><date>2019-01-04</date><risdate>2019</risdate><abstract>The utility model discloses a high stake beam slab formula wharf surface blowdown structure, high stake beam slab formula pier includes pier portion and draws bridge, it links to each other with pierportion to draw bridge, the blowdown structure includes sealed tube, intervalve, hose, blowdown branch pipe, dirt collecting tank and blowdown main pipe, be equipped with a plurality of mudholes on the wharf surface of pier portion, be equipped with a sealed tube in every mudhole, the intervalve is pegged graft in the sealed tube, and the bottom of intervalve and hose sealing connection, hose andblowdown branch pipe sealing connection, and blowdown branch pipe and blowdown main pipe all are linked together with dirt collecting tank. The utility model discloses need not dig the escape canal, little to wharf structure destruction, the construction investment is low, adopting the supporting hose of intervalve to use, when blockking up, can taking out the intervalve and dredge or direct the change taking place the dri</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN208328829UU
source esp@cenet
subjects CESSPOOLS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER
SEWERAGE
SEWERS
SOIL SHIFTING
WATER SUPPLY
title High stake beam slab formula wharf surface blowdown structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T00%3A12%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YUE&rft.date=2019-01-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN208328829UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true