Mark time along with self -adjustable safe suspension bridge on water of slope

Mark time along with self -adjustable safe suspension bridge on water of slope, the articulated installation footboard of main pontic (2) front end links up device (1), side -mounting bridge floor mark time step (4) are gone up in main pontic (2), main pontic (2) front end bottom installation gyro w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN WUZHENG, WANG XIUZHEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!