Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast

The utility model discloses a big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast, include and fill out district (1) through pile foundation hole (2) that auger drill machine (4) formed at fragment stone height, be equipped with...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YU KUN, TIAN ZUOFU, ZHAO MENGCHUN, QIU HONGYU, GONG CHAOWEI, FENG LINBO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YU KUN
TIAN ZUOFU
ZHAO MENGCHUN
QIU HONGYU
GONG CHAOWEI
FENG LINBO
description The utility model discloses a big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast, include and fill out district (1) through pile foundation hole (2) that auger drill machine (4) formed at fragment stone height, be equipped with the steel that pushes down the follow -up along with drilling and protect a section of thick bamboo (3)in pile foundation hole (2), the steel protects a section of thick bamboo (3) and adopts and to connect the long permanent structure of wholeness that constitutes in pile foundation hole (2), goes upa lesson and protects a section of thick bamboo (5) and a lesson down and protect welded connection between the section of thick bamboo (8) and stitch (7) and locate vertical stiffener (6) welding strengthening who sets up the 60cm length according to the 50cm interval. The utility model discloses a protecting hole side soil mass stability nature at the pore -forming in -process, 20cm whenever creeps into 50cm just protect
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN208088288UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN208088288UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN208088288UU3</originalsourceid><addsrcrecordid>eNqNzLEOwjAMBNAuDAj4B4uFCakqS2aqIiYmOlcmcVpLaRIlDt9PkPgAprvh3W2b95VniJiEtSMwjCsJJbAJ55W8QJbgCRbieRHgDJadIwOhSMVZEms5ZYhcxzYUb1A4eEBvvvhFOqwEMSSqR6loKbVZzLJvNhZdpsMvd83xNjz7-5limChH1ORJpv7RtapVqlNqHC9_oQ-da0Zk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast</title><source>esp@cenet</source><creator>YU KUN ; TIAN ZUOFU ; ZHAO MENGCHUN ; QIU HONGYU ; GONG CHAOWEI ; FENG LINBO</creator><creatorcontrib>YU KUN ; TIAN ZUOFU ; ZHAO MENGCHUN ; QIU HONGYU ; GONG CHAOWEI ; FENG LINBO</creatorcontrib><description>The utility model discloses a big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast, include and fill out district (1) through pile foundation hole (2) that auger drill machine (4) formed at fragment stone height, be equipped with the steel that pushes down the follow -up along with drilling and protect a section of thick bamboo (3)in pile foundation hole (2), the steel protects a section of thick bamboo (3) and adopts and to connect the long permanent structure of wholeness that constitutes in pile foundation hole (2), goes upa lesson and protects a section of thick bamboo (5) and a lesson down and protect welded connection between the section of thick bamboo (8) and stitch (7) and locate vertical stiffener (6) welding strengthening who sets up the 60cm length according to the 50cm interval. The utility model discloses a protecting hole side soil mass stability nature at the pore -forming in -process, 20cm whenever creeps into 50cm just protect</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181113&amp;DB=EPODOC&amp;CC=CN&amp;NR=208088288U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181113&amp;DB=EPODOC&amp;CC=CN&amp;NR=208088288U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YU KUN</creatorcontrib><creatorcontrib>TIAN ZUOFU</creatorcontrib><creatorcontrib>ZHAO MENGCHUN</creatorcontrib><creatorcontrib>QIU HONGYU</creatorcontrib><creatorcontrib>GONG CHAOWEI</creatorcontrib><creatorcontrib>FENG LINBO</creatorcontrib><title>Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast</title><description>The utility model discloses a big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast, include and fill out district (1) through pile foundation hole (2) that auger drill machine (4) formed at fragment stone height, be equipped with the steel that pushes down the follow -up along with drilling and protect a section of thick bamboo (3)in pile foundation hole (2), the steel protects a section of thick bamboo (3) and adopts and to connect the long permanent structure of wholeness that constitutes in pile foundation hole (2), goes upa lesson and protects a section of thick bamboo (5) and a lesson down and protect welded connection between the section of thick bamboo (8) and stitch (7) and locate vertical stiffener (6) welding strengthening who sets up the 60cm length according to the 50cm interval. The utility model discloses a protecting hole side soil mass stability nature at the pore -forming in -process, 20cm whenever creeps into 50cm just protect</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzLEOwjAMBNAuDAj4B4uFCakqS2aqIiYmOlcmcVpLaRIlDt9PkPgAprvh3W2b95VniJiEtSMwjCsJJbAJ55W8QJbgCRbieRHgDJadIwOhSMVZEms5ZYhcxzYUb1A4eEBvvvhFOqwEMSSqR6loKbVZzLJvNhZdpsMvd83xNjz7-5limChH1ORJpv7RtapVqlNqHC9_oQ-da0Zk</recordid><startdate>20181113</startdate><enddate>20181113</enddate><creator>YU KUN</creator><creator>TIAN ZUOFU</creator><creator>ZHAO MENGCHUN</creator><creator>QIU HONGYU</creator><creator>GONG CHAOWEI</creator><creator>FENG LINBO</creator><scope>EVB</scope></search><sort><creationdate>20181113</creationdate><title>Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast</title><author>YU KUN ; TIAN ZUOFU ; ZHAO MENGCHUN ; QIU HONGYU ; GONG CHAOWEI ; FENG LINBO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN208088288UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YU KUN</creatorcontrib><creatorcontrib>TIAN ZUOFU</creatorcontrib><creatorcontrib>ZHAO MENGCHUN</creatorcontrib><creatorcontrib>QIU HONGYU</creatorcontrib><creatorcontrib>GONG CHAOWEI</creatorcontrib><creatorcontrib>FENG LINBO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YU KUN</au><au>TIAN ZUOFU</au><au>ZHAO MENGCHUN</au><au>QIU HONGYU</au><au>GONG CHAOWEI</au><au>FENG LINBO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast</title><date>2018-11-13</date><risdate>2018</risdate><abstract>The utility model discloses a big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast, include and fill out district (1) through pile foundation hole (2) that auger drill machine (4) formed at fragment stone height, be equipped with the steel that pushes down the follow -up along with drilling and protect a section of thick bamboo (3)in pile foundation hole (2), the steel protects a section of thick bamboo (3) and adopts and to connect the long permanent structure of wholeness that constitutes in pile foundation hole (2), goes upa lesson and protects a section of thick bamboo (5) and a lesson down and protect welded connection between the section of thick bamboo (8) and stitch (7) and locate vertical stiffener (6) welding strengthening who sets up the 60cm length according to the 50cm interval. The utility model discloses a protecting hole side soil mass stability nature at the pore -forming in -process, 20cm whenever creeps into 50cm just protect</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN208088288UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Big particle diameter fragment stone height is filled out district's pile foundation and is become pore structure fast
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T15%3A03%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YU%20KUN&rft.date=2018-11-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN208088288UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true