Limit structure is connected with pier stud temporarily to steel case arch rib tied arch bridge's steel abut

The utility model provides a limit structure is connected with pier stud temporarily to steel case arch rib tied arch bridge's steel abut is including steel abut, pier and the support of setting between steel abut and pier, the vertical connection of steel abut is at the top of support to be eq...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HE YANLAN, SUN WEI, TONG SHENGQIANG, ZHAO JIUCUN, ZHENG MIN, WU PENGFEI, WAN XINGGUO, XIAO QIXING, CHEN GANG, WANG JIAJIA, ZHAO WEI, CHEN ZIYANG, GUO YAHUI, SHENG ZIYI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!