Assemble steel -concrete composite beam

The utility model relates to an assemble steel -concrete composite beam, assemble steel -concrete composite beam include a concrete panel and a supporting beam who arranges along upper and lower direction, it is equipped with the top flange roof to prop up supporting beam, concrete panel passes thro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GAO JING, HAN GONGXUE, ZHAO LIMING, WANG JIANLIN, QU PENGSHUAI, ZHANG JIANXUN, HUI MENG, WU HAO, HAN SHUGUO, HUO XINGWEI, LI BAILIANG, XU JIAN, LI YALONG, DUI BINBIN, TIAN YANFU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GAO JING
HAN GONGXUE
ZHAO LIMING
WANG JIANLIN
QU PENGSHUAI
ZHANG JIANXUN
HUI MENG
WU HAO
HAN SHUGUO
HUO XINGWEI
LI BAILIANG
XU JIAN
LI YALONG
DUI BINBIN
TIAN YANFU
description The utility model relates to an assemble steel -concrete composite beam, assemble steel -concrete composite beam include a concrete panel and a supporting beam who arranges along upper and lower direction, it is equipped with the top flange roof to prop up supporting beam, concrete panel passes through moulding by casting with the top flange roof, the top flange roof is located concrete panel upper portion. Move concrete panel's the position of building to top flange roof lower extreme by on the roof of top flange, it is closely knit to guarantee that top flange roof and concrete panel build,and firm in connection makes the top flange roof bear the atress in hogging moment district simultaneously, has improved the utilization ratio of material, saves the cost. 本实用新型涉及种拼装钢混凝土组合梁,拼装钢混凝土组合梁包括沿上下方向布置的混凝土面板和支撑梁,所述支撑梁设有上翼缘顶板,所述混凝土面板与上翼缘顶板通过浇注成型,所述上翼缘顶板位于混凝土面板上部。把混凝土面板的浇筑位置由上翼缘顶板上端移至上翼缘顶板下端,保证上翼缘顶板与混凝土面板浇筑密实,连接牢固,同时使上翼缘顶板承受负弯矩区的受力,提高了材料的利用率,节省成本。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN207958956UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN207958956UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN207958956UU3</originalsourceid><addsrcrecordid>eNrjZFB3LC5OzU3KSVUoLklNzVHQTc7PSy5KLUlVSM7PLcgvzgSyklITc3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GBuaWphaWpWWioMVGKAOboKLk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Assemble steel -concrete composite beam</title><source>esp@cenet</source><creator>GAO JING ; HAN GONGXUE ; ZHAO LIMING ; WANG JIANLIN ; QU PENGSHUAI ; ZHANG JIANXUN ; HUI MENG ; WU HAO ; HAN SHUGUO ; HUO XINGWEI ; LI BAILIANG ; XU JIAN ; LI YALONG ; DUI BINBIN ; TIAN YANFU</creator><creatorcontrib>GAO JING ; HAN GONGXUE ; ZHAO LIMING ; WANG JIANLIN ; QU PENGSHUAI ; ZHANG JIANXUN ; HUI MENG ; WU HAO ; HAN SHUGUO ; HUO XINGWEI ; LI BAILIANG ; XU JIAN ; LI YALONG ; DUI BINBIN ; TIAN YANFU</creatorcontrib><description>The utility model relates to an assemble steel -concrete composite beam, assemble steel -concrete composite beam include a concrete panel and a supporting beam who arranges along upper and lower direction, it is equipped with the top flange roof to prop up supporting beam, concrete panel passes through moulding by casting with the top flange roof, the top flange roof is located concrete panel upper portion. Move concrete panel's the position of building to top flange roof lower extreme by on the roof of top flange, it is closely knit to guarantee that top flange roof and concrete panel build,and firm in connection makes the top flange roof bear the atress in hogging moment district simultaneously, has improved the utilization ratio of material, saves the cost. 本实用新型涉及种拼装钢混凝土组合梁,拼装钢混凝土组合梁包括沿上下方向布置的混凝土面板和支撑梁,所述支撑梁设有上翼缘顶板,所述混凝土面板与上翼缘顶板通过浇注成型,所述上翼缘顶板位于混凝土面板上部。把混凝土面板的浇筑位置由上翼缘顶板上端移至上翼缘顶板下端,保证上翼缘顶板与混凝土面板浇筑密实,连接牢固,同时使上翼缘顶板承受负弯矩区的受力,提高了材料的利用率,节省成本。</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181012&amp;DB=EPODOC&amp;CC=CN&amp;NR=207958956U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181012&amp;DB=EPODOC&amp;CC=CN&amp;NR=207958956U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAO JING</creatorcontrib><creatorcontrib>HAN GONGXUE</creatorcontrib><creatorcontrib>ZHAO LIMING</creatorcontrib><creatorcontrib>WANG JIANLIN</creatorcontrib><creatorcontrib>QU PENGSHUAI</creatorcontrib><creatorcontrib>ZHANG JIANXUN</creatorcontrib><creatorcontrib>HUI MENG</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>HAN SHUGUO</creatorcontrib><creatorcontrib>HUO XINGWEI</creatorcontrib><creatorcontrib>LI BAILIANG</creatorcontrib><creatorcontrib>XU JIAN</creatorcontrib><creatorcontrib>LI YALONG</creatorcontrib><creatorcontrib>DUI BINBIN</creatorcontrib><creatorcontrib>TIAN YANFU</creatorcontrib><title>Assemble steel -concrete composite beam</title><description>The utility model relates to an assemble steel -concrete composite beam, assemble steel -concrete composite beam include a concrete panel and a supporting beam who arranges along upper and lower direction, it is equipped with the top flange roof to prop up supporting beam, concrete panel passes through moulding by casting with the top flange roof, the top flange roof is located concrete panel upper portion. Move concrete panel's the position of building to top flange roof lower extreme by on the roof of top flange, it is closely knit to guarantee that top flange roof and concrete panel build,and firm in connection makes the top flange roof bear the atress in hogging moment district simultaneously, has improved the utilization ratio of material, saves the cost. 本实用新型涉及种拼装钢混凝土组合梁,拼装钢混凝土组合梁包括沿上下方向布置的混凝土面板和支撑梁,所述支撑梁设有上翼缘顶板,所述混凝土面板与上翼缘顶板通过浇注成型,所述上翼缘顶板位于混凝土面板上部。把混凝土面板的浇筑位置由上翼缘顶板上端移至上翼缘顶板下端,保证上翼缘顶板与混凝土面板浇筑密实,连接牢固,同时使上翼缘顶板承受负弯矩区的受力,提高了材料的利用率,节省成本。</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB3LC5OzU3KSVUoLklNzVHQTc7PSy5KLUlVSM7PLcgvzgSyklITc3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GBuaWphaWpWWioMVGKAOboKLk</recordid><startdate>20181012</startdate><enddate>20181012</enddate><creator>GAO JING</creator><creator>HAN GONGXUE</creator><creator>ZHAO LIMING</creator><creator>WANG JIANLIN</creator><creator>QU PENGSHUAI</creator><creator>ZHANG JIANXUN</creator><creator>HUI MENG</creator><creator>WU HAO</creator><creator>HAN SHUGUO</creator><creator>HUO XINGWEI</creator><creator>LI BAILIANG</creator><creator>XU JIAN</creator><creator>LI YALONG</creator><creator>DUI BINBIN</creator><creator>TIAN YANFU</creator><scope>EVB</scope></search><sort><creationdate>20181012</creationdate><title>Assemble steel -concrete composite beam</title><author>GAO JING ; HAN GONGXUE ; ZHAO LIMING ; WANG JIANLIN ; QU PENGSHUAI ; ZHANG JIANXUN ; HUI MENG ; WU HAO ; HAN SHUGUO ; HUO XINGWEI ; LI BAILIANG ; XU JIAN ; LI YALONG ; DUI BINBIN ; TIAN YANFU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN207958956UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>GAO JING</creatorcontrib><creatorcontrib>HAN GONGXUE</creatorcontrib><creatorcontrib>ZHAO LIMING</creatorcontrib><creatorcontrib>WANG JIANLIN</creatorcontrib><creatorcontrib>QU PENGSHUAI</creatorcontrib><creatorcontrib>ZHANG JIANXUN</creatorcontrib><creatorcontrib>HUI MENG</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>HAN SHUGUO</creatorcontrib><creatorcontrib>HUO XINGWEI</creatorcontrib><creatorcontrib>LI BAILIANG</creatorcontrib><creatorcontrib>XU JIAN</creatorcontrib><creatorcontrib>LI YALONG</creatorcontrib><creatorcontrib>DUI BINBIN</creatorcontrib><creatorcontrib>TIAN YANFU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAO JING</au><au>HAN GONGXUE</au><au>ZHAO LIMING</au><au>WANG JIANLIN</au><au>QU PENGSHUAI</au><au>ZHANG JIANXUN</au><au>HUI MENG</au><au>WU HAO</au><au>HAN SHUGUO</au><au>HUO XINGWEI</au><au>LI BAILIANG</au><au>XU JIAN</au><au>LI YALONG</au><au>DUI BINBIN</au><au>TIAN YANFU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Assemble steel -concrete composite beam</title><date>2018-10-12</date><risdate>2018</risdate><abstract>The utility model relates to an assemble steel -concrete composite beam, assemble steel -concrete composite beam include a concrete panel and a supporting beam who arranges along upper and lower direction, it is equipped with the top flange roof to prop up supporting beam, concrete panel passes through moulding by casting with the top flange roof, the top flange roof is located concrete panel upper portion. Move concrete panel's the position of building to top flange roof lower extreme by on the roof of top flange, it is closely knit to guarantee that top flange roof and concrete panel build,and firm in connection makes the top flange roof bear the atress in hogging moment district simultaneously, has improved the utilization ratio of material, saves the cost. 本实用新型涉及种拼装钢混凝土组合梁,拼装钢混凝土组合梁包括沿上下方向布置的混凝土面板和支撑梁,所述支撑梁设有上翼缘顶板,所述混凝土面板与上翼缘顶板通过浇注成型,所述上翼缘顶板位于混凝土面板上部。把混凝土面板的浇筑位置由上翼缘顶板上端移至上翼缘顶板下端,保证上翼缘顶板与混凝土面板浇筑密实,连接牢固,同时使上翼缘顶板承受负弯矩区的受力,提高了材料的利用率,节省成本。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN207958956UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Assemble steel -concrete composite beam
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T23%3A38%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAO%20JING&rft.date=2018-10-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN207958956UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true