Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel
The utility model discloses a wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel, include that arch wall water horizontally rotating spouts the stake,face water horizontally rotating spouts the stake and spouts the stake perpendicularly soon, arch wal...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG JUNRU YANG ZHANMENG WANG GANGYONG LI YONGLIANG XIAO BINGCHEN ZHENG ZONGXI KONG CHAO WANG RUI PAN PENG WANG YONG |
description | The utility model discloses a wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel, include that arch wall water horizontally rotating spouts the stake,face water horizontally rotating spouts the stake and spouts the stake perpendicularly soon, arch wall water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and the arch wall water horizontally rotating of a plurality of interlocks of each other spouts an arch wall in formation tunnel, face water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and a plurality of face water horizontally rotating spout the department of topping bar that the face was located in the stake, spout a perpendicular to tunnel perpendicularly soonand move towards to set up, a plurality ofly spout the stake perpendicularly soon and locate the light and shade boundary and face upward slope department. The utility model discloses the arch wall water horizontally rotating |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN207829905UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN207829905UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN207829905UU3</originalsourceid><addsrcrecordid>eNqNjLEKwjAQhrs4iPoOh3uhVEQ7F8XJyeJYjuRaA-kl5C6Db28EH8Dp--H7-NeVeTq2gAuKCHhC63gGfSUiqK1biMUFRg-SYwxJv9YEFk3ZaDEQJhAsD3MKucDjmxKURclkBc3M5LfVakIvtPtxU-2vl0d_qymGkSSiISYd-3vbnM5t1zXHYTj8FX0Afd9AJQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel</title><source>esp@cenet</source><creator>ZHANG JUNRU ; YANG ZHANMENG ; WANG GANGYONG ; LI YONGLIANG ; XIAO BINGCHEN ; ZHENG ZONGXI ; KONG CHAO ; WANG RUI ; PAN PENG ; WANG YONG</creator><creatorcontrib>ZHANG JUNRU ; YANG ZHANMENG ; WANG GANGYONG ; LI YONGLIANG ; XIAO BINGCHEN ; ZHENG ZONGXI ; KONG CHAO ; WANG RUI ; PAN PENG ; WANG YONG</creatorcontrib><description>The utility model discloses a wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel, include that arch wall water horizontally rotating spouts the stake,face water horizontally rotating spouts the stake and spouts the stake perpendicularly soon, arch wall water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and the arch wall water horizontally rotating of a plurality of interlocks of each other spouts an arch wall in formation tunnel, face water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and a plurality of face water horizontally rotating spout the department of topping bar that the face was located in the stake, spout a perpendicular to tunnel perpendicularly soonand move towards to set up, a plurality ofly spout the stake perpendicularly soon and locate the light and shade boundary and face upward slope department. The utility model discloses the arch wall water horizontally rotating</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180907&DB=EPODOC&CC=CN&NR=207829905U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180907&DB=EPODOC&CC=CN&NR=207829905U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG JUNRU</creatorcontrib><creatorcontrib>YANG ZHANMENG</creatorcontrib><creatorcontrib>WANG GANGYONG</creatorcontrib><creatorcontrib>LI YONGLIANG</creatorcontrib><creatorcontrib>XIAO BINGCHEN</creatorcontrib><creatorcontrib>ZHENG ZONGXI</creatorcontrib><creatorcontrib>KONG CHAO</creatorcontrib><creatorcontrib>WANG RUI</creatorcontrib><creatorcontrib>PAN PENG</creatorcontrib><creatorcontrib>WANG YONG</creatorcontrib><title>Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel</title><description>The utility model discloses a wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel, include that arch wall water horizontally rotating spouts the stake,face water horizontally rotating spouts the stake and spouts the stake perpendicularly soon, arch wall water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and the arch wall water horizontally rotating of a plurality of interlocks of each other spouts an arch wall in formation tunnel, face water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and a plurality of face water horizontally rotating spout the department of topping bar that the face was located in the stake, spout a perpendicular to tunnel perpendicularly soonand move towards to set up, a plurality ofly spout the stake perpendicularly soon and locate the light and shade boundary and face upward slope department. The utility model discloses the arch wall water horizontally rotating</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAQhrs4iPoOh3uhVEQ7F8XJyeJYjuRaA-kl5C6Db28EH8Dp--H7-NeVeTq2gAuKCHhC63gGfSUiqK1biMUFRg-SYwxJv9YEFk3ZaDEQJhAsD3MKucDjmxKURclkBc3M5LfVakIvtPtxU-2vl0d_qymGkSSiISYd-3vbnM5t1zXHYTj8FX0Afd9AJQ</recordid><startdate>20180907</startdate><enddate>20180907</enddate><creator>ZHANG JUNRU</creator><creator>YANG ZHANMENG</creator><creator>WANG GANGYONG</creator><creator>LI YONGLIANG</creator><creator>XIAO BINGCHEN</creator><creator>ZHENG ZONGXI</creator><creator>KONG CHAO</creator><creator>WANG RUI</creator><creator>PAN PENG</creator><creator>WANG YONG</creator><scope>EVB</scope></search><sort><creationdate>20180907</creationdate><title>Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel</title><author>ZHANG JUNRU ; YANG ZHANMENG ; WANG GANGYONG ; LI YONGLIANG ; XIAO BINGCHEN ; ZHENG ZONGXI ; KONG CHAO ; WANG RUI ; PAN PENG ; WANG YONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN207829905UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG JUNRU</creatorcontrib><creatorcontrib>YANG ZHANMENG</creatorcontrib><creatorcontrib>WANG GANGYONG</creatorcontrib><creatorcontrib>LI YONGLIANG</creatorcontrib><creatorcontrib>XIAO BINGCHEN</creatorcontrib><creatorcontrib>ZHENG ZONGXI</creatorcontrib><creatorcontrib>KONG CHAO</creatorcontrib><creatorcontrib>WANG RUI</creatorcontrib><creatorcontrib>PAN PENG</creatorcontrib><creatorcontrib>WANG YONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG JUNRU</au><au>YANG ZHANMENG</au><au>WANG GANGYONG</au><au>LI YONGLIANG</au><au>XIAO BINGCHEN</au><au>ZHENG ZONGXI</au><au>KONG CHAO</au><au>WANG RUI</au><au>PAN PENG</au><au>WANG YONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel</title><date>2018-09-07</date><risdate>2018</risdate><abstract>The utility model discloses a wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel, include that arch wall water horizontally rotating spouts the stake,face water horizontally rotating spouts the stake and spouts the stake perpendicularly soon, arch wall water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and the arch wall water horizontally rotating of a plurality of interlocks of each other spouts an arch wall in formation tunnel, face water horizontally rotating spouts the stake and moves towards to set up along the tunnel, and a plurality of face water horizontally rotating spout the department of topping bar that the face was located in the stake, spout a perpendicular to tunnel perpendicularly soonand move towards to set up, a plurality ofly spout the stake perpendicularly soon and locate the light and shade boundary and face upward slope department. The utility model discloses the arch wall water horizontally rotating</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN207829905UU |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Wind amasss leading three -dimensional supporting construction of sand ground layer undercut tunnel |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T18%3A59%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20JUNRU&rft.date=2018-09-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN207829905UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |