Low concave project under construction anti -flooding water structure

The utility model belongs to the technical field of the building, especially, relate to a low concave project under construction anti -flooding water structure, include the baffle, be located the L type ear wall of baffle both sides to and with the support system of baffle with horizontal earth'...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIN JINHUA, DUAN YUEQIANG, FU WENHUI, HONG ZUZHI, SHI CHANGQI, ZHU YONG, XUE HUAKUN, LIN ZHIJUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIN JINHUA
DUAN YUEQIANG
FU WENHUI
HONG ZUZHI
SHI CHANGQI
ZHU YONG
XUE HUAKUN
LIN ZHIJUN
description The utility model belongs to the technical field of the building, especially, relate to a low concave project under construction anti -flooding water structure, include the baffle, be located the L type ear wall of baffle both sides to and with the support system of baffle with horizontal earth's surface fixed connection, the baffle comprises a plurality of baffle units, and there are two the support ribs and baffle unit back fixed connection that intersect along the diagonal in the baffle unit back, and support rib central point puts to weld has a fixed hinge fishplate bar, the fixed hinge fishplate bar welds the three corner brace boards that the backboard face was equipped with two parallel arrangement including welding the board, the right -angle side of three corner brace boards withweld that the board is perpendicular to be set up, all be equipped with a keyhole on every three corner brace board, be equipped with articulated activity between two keyholes and tie, articulated activity is tied and support
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN207794005UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN207794005UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN207794005UU3</originalsourceid><addsrcrecordid>eNrjZHD1yS9XSM7PS04sS1UoKMrPSk0uUSjNS0ktAokWlxSVJpdk5ucpJOaVZCropuXk56dk5qUrlCeWAFVApEuLUnkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GBubmliYGBaWioMVGKAJrnNJQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Low concave project under construction anti -flooding water structure</title><source>esp@cenet</source><creator>LIN JINHUA ; DUAN YUEQIANG ; FU WENHUI ; HONG ZUZHI ; SHI CHANGQI ; ZHU YONG ; XUE HUAKUN ; LIN ZHIJUN</creator><creatorcontrib>LIN JINHUA ; DUAN YUEQIANG ; FU WENHUI ; HONG ZUZHI ; SHI CHANGQI ; ZHU YONG ; XUE HUAKUN ; LIN ZHIJUN</creatorcontrib><description>The utility model belongs to the technical field of the building, especially, relate to a low concave project under construction anti -flooding water structure, include the baffle, be located the L type ear wall of baffle both sides to and with the support system of baffle with horizontal earth's surface fixed connection, the baffle comprises a plurality of baffle units, and there are two the support ribs and baffle unit back fixed connection that intersect along the diagonal in the baffle unit back, and support rib central point puts to weld has a fixed hinge fishplate bar, the fixed hinge fishplate bar welds the three corner brace boards that the backboard face was equipped with two parallel arrangement including welding the board, the right -angle side of three corner brace boards withweld that the board is perpendicular to be set up, all be equipped with a keyhole on every three corner brace board, be equipped with articulated activity between two keyholes and tie, articulated activity is tied and support</description><language>chi ; eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180831&amp;DB=EPODOC&amp;CC=CN&amp;NR=207794005U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180831&amp;DB=EPODOC&amp;CC=CN&amp;NR=207794005U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIN JINHUA</creatorcontrib><creatorcontrib>DUAN YUEQIANG</creatorcontrib><creatorcontrib>FU WENHUI</creatorcontrib><creatorcontrib>HONG ZUZHI</creatorcontrib><creatorcontrib>SHI CHANGQI</creatorcontrib><creatorcontrib>ZHU YONG</creatorcontrib><creatorcontrib>XUE HUAKUN</creatorcontrib><creatorcontrib>LIN ZHIJUN</creatorcontrib><title>Low concave project under construction anti -flooding water structure</title><description>The utility model belongs to the technical field of the building, especially, relate to a low concave project under construction anti -flooding water structure, include the baffle, be located the L type ear wall of baffle both sides to and with the support system of baffle with horizontal earth's surface fixed connection, the baffle comprises a plurality of baffle units, and there are two the support ribs and baffle unit back fixed connection that intersect along the diagonal in the baffle unit back, and support rib central point puts to weld has a fixed hinge fishplate bar, the fixed hinge fishplate bar welds the three corner brace boards that the backboard face was equipped with two parallel arrangement including welding the board, the right -angle side of three corner brace boards withweld that the board is perpendicular to be set up, all be equipped with a keyhole on every three corner brace board, be equipped with articulated activity between two keyholes and tie, articulated activity is tied and support</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD1yS9XSM7PS04sS1UoKMrPSk0uUSjNS0ktAokWlxSVJpdk5ucpJOaVZCropuXk56dk5qUrlCeWAFVApEuLUnkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GBubmliYGBaWioMVGKAJrnNJQ</recordid><startdate>20180831</startdate><enddate>20180831</enddate><creator>LIN JINHUA</creator><creator>DUAN YUEQIANG</creator><creator>FU WENHUI</creator><creator>HONG ZUZHI</creator><creator>SHI CHANGQI</creator><creator>ZHU YONG</creator><creator>XUE HUAKUN</creator><creator>LIN ZHIJUN</creator><scope>EVB</scope></search><sort><creationdate>20180831</creationdate><title>Low concave project under construction anti -flooding water structure</title><author>LIN JINHUA ; DUAN YUEQIANG ; FU WENHUI ; HONG ZUZHI ; SHI CHANGQI ; ZHU YONG ; XUE HUAKUN ; LIN ZHIJUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN207794005UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIN JINHUA</creatorcontrib><creatorcontrib>DUAN YUEQIANG</creatorcontrib><creatorcontrib>FU WENHUI</creatorcontrib><creatorcontrib>HONG ZUZHI</creatorcontrib><creatorcontrib>SHI CHANGQI</creatorcontrib><creatorcontrib>ZHU YONG</creatorcontrib><creatorcontrib>XUE HUAKUN</creatorcontrib><creatorcontrib>LIN ZHIJUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIN JINHUA</au><au>DUAN YUEQIANG</au><au>FU WENHUI</au><au>HONG ZUZHI</au><au>SHI CHANGQI</au><au>ZHU YONG</au><au>XUE HUAKUN</au><au>LIN ZHIJUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Low concave project under construction anti -flooding water structure</title><date>2018-08-31</date><risdate>2018</risdate><abstract>The utility model belongs to the technical field of the building, especially, relate to a low concave project under construction anti -flooding water structure, include the baffle, be located the L type ear wall of baffle both sides to and with the support system of baffle with horizontal earth's surface fixed connection, the baffle comprises a plurality of baffle units, and there are two the support ribs and baffle unit back fixed connection that intersect along the diagonal in the baffle unit back, and support rib central point puts to weld has a fixed hinge fishplate bar, the fixed hinge fishplate bar welds the three corner brace boards that the backboard face was equipped with two parallel arrangement including welding the board, the right -angle side of three corner brace boards withweld that the board is perpendicular to be set up, all be equipped with a keyhole on every three corner brace board, be equipped with articulated activity between two keyholes and tie, articulated activity is tied and support</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN207794005UU
source esp@cenet
subjects FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
title Low concave project under construction anti -flooding water structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T05%3A06%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIN%20JINHUA&rft.date=2018-08-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN207794005UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true