Gantry crane sideslip flatcar
The utility model provides a gantry crane sideslip flatcar, time limit for a project and incremental cost are heavily pieced together, are prolonged in the dismouting that has existed when having solved gantry crane from a set of orbit sideslip to another group's orbit or even multiunit orbit p...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU YUAN BAI BIN ZHANG RONGMING ZHANG JINGWEI NIU RUIHUA QU ZHENHUA |
description | The utility model provides a gantry crane sideslip flatcar, time limit for a project and incremental cost are heavily pieced together, are prolonged in the dismouting that has existed when having solved gantry crane from a set of orbit sideslip to another group's orbit or even multiunit orbit problem. It includes linking beam, two running gear, two climbing mechanism, track support base and running gear draw gear, the linking beam rigid coupling is on the grade beam is connected in gantry crane's walking, two running gear are located the linking beam both ends, connect through running gear draw gear between two running gear, running gear can follow the reciprocal linear motion of gantry crane orbit guide rail, two climbing mechanism are located two running gear inboards, climbing mechanismone end sets up on track support base, track support base cooperatees with sideslip flatcar operation guide rail, the track support base below sets up gantry crane operation guide rail, the other endcontacts with the binder. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN207276051UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN207276051UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN207276051UU3</originalsourceid><addsrcrecordid>eNrjZJB1T8wrKapUSC5KzEtVKM5MSS3OySxQSMtJLElOLOJhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYG5kbmZgamhqGhxkQpAgAY4CTs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Gantry crane sideslip flatcar</title><source>esp@cenet</source><creator>LIU YUAN ; BAI BIN ; ZHANG RONGMING ; ZHANG JINGWEI ; NIU RUIHUA ; QU ZHENHUA</creator><creatorcontrib>LIU YUAN ; BAI BIN ; ZHANG RONGMING ; ZHANG JINGWEI ; NIU RUIHUA ; QU ZHENHUA</creatorcontrib><description>The utility model provides a gantry crane sideslip flatcar, time limit for a project and incremental cost are heavily pieced together, are prolonged in the dismouting that has existed when having solved gantry crane from a set of orbit sideslip to another group's orbit or even multiunit orbit problem. It includes linking beam, two running gear, two climbing mechanism, track support base and running gear draw gear, the linking beam rigid coupling is on the grade beam is connected in gantry crane's walking, two running gear are located the linking beam both ends, connect through running gear draw gear between two running gear, running gear can follow the reciprocal linear motion of gantry crane orbit guide rail, two climbing mechanism are located two running gear inboards, climbing mechanismone end sets up on track support base, track support base cooperatees with sideslip flatcar operation guide rail, the track support base below sets up gantry crane operation guide rail, the other endcontacts with the binder.</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180427&DB=EPODOC&CC=CN&NR=207276051U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180427&DB=EPODOC&CC=CN&NR=207276051U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YUAN</creatorcontrib><creatorcontrib>BAI BIN</creatorcontrib><creatorcontrib>ZHANG RONGMING</creatorcontrib><creatorcontrib>ZHANG JINGWEI</creatorcontrib><creatorcontrib>NIU RUIHUA</creatorcontrib><creatorcontrib>QU ZHENHUA</creatorcontrib><title>Gantry crane sideslip flatcar</title><description>The utility model provides a gantry crane sideslip flatcar, time limit for a project and incremental cost are heavily pieced together, are prolonged in the dismouting that has existed when having solved gantry crane from a set of orbit sideslip to another group's orbit or even multiunit orbit problem. It includes linking beam, two running gear, two climbing mechanism, track support base and running gear draw gear, the linking beam rigid coupling is on the grade beam is connected in gantry crane's walking, two running gear are located the linking beam both ends, connect through running gear draw gear between two running gear, running gear can follow the reciprocal linear motion of gantry crane orbit guide rail, two climbing mechanism are located two running gear inboards, climbing mechanismone end sets up on track support base, track support base cooperatees with sideslip flatcar operation guide rail, the track support base below sets up gantry crane operation guide rail, the other endcontacts with the binder.</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJB1T8wrKapUSC5KzEtVKM5MSS3OySxQSMtJLElOLOJhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYG5kbmZgamhqGhxkQpAgAY4CTs</recordid><startdate>20180427</startdate><enddate>20180427</enddate><creator>LIU YUAN</creator><creator>BAI BIN</creator><creator>ZHANG RONGMING</creator><creator>ZHANG JINGWEI</creator><creator>NIU RUIHUA</creator><creator>QU ZHENHUA</creator><scope>EVB</scope></search><sort><creationdate>20180427</creationdate><title>Gantry crane sideslip flatcar</title><author>LIU YUAN ; BAI BIN ; ZHANG RONGMING ; ZHANG JINGWEI ; NIU RUIHUA ; QU ZHENHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN207276051UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YUAN</creatorcontrib><creatorcontrib>BAI BIN</creatorcontrib><creatorcontrib>ZHANG RONGMING</creatorcontrib><creatorcontrib>ZHANG JINGWEI</creatorcontrib><creatorcontrib>NIU RUIHUA</creatorcontrib><creatorcontrib>QU ZHENHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YUAN</au><au>BAI BIN</au><au>ZHANG RONGMING</au><au>ZHANG JINGWEI</au><au>NIU RUIHUA</au><au>QU ZHENHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Gantry crane sideslip flatcar</title><date>2018-04-27</date><risdate>2018</risdate><abstract>The utility model provides a gantry crane sideslip flatcar, time limit for a project and incremental cost are heavily pieced together, are prolonged in the dismouting that has existed when having solved gantry crane from a set of orbit sideslip to another group's orbit or even multiunit orbit problem. It includes linking beam, two running gear, two climbing mechanism, track support base and running gear draw gear, the linking beam rigid coupling is on the grade beam is connected in gantry crane's walking, two running gear are located the linking beam both ends, connect through running gear draw gear between two running gear, running gear can follow the reciprocal linear motion of gantry crane orbit guide rail, two climbing mechanism are located two running gear inboards, climbing mechanismone end sets up on track support base, track support base cooperatees with sideslip flatcar operation guide rail, the track support base below sets up gantry crane operation guide rail, the other endcontacts with the binder.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN207276051UU |
source | esp@cenet |
subjects | CRANES HAULING HOISTING LIFTING LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES PERFORMING OPERATIONS TRANSPORTING |
title | Gantry crane sideslip flatcar |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T16%3A07%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YUAN&rft.date=2018-04-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN207276051UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |