Excavation supporting precipitation integration tubular pile dado structure

The utility model provides an excavation supporting precipitation integration tubular pile dado structure which characterized in that: including the dado stake, keeping off native board, pile cover, top supporting beam, the dado stake is that hollow steel tube structure, dado stake one side are equi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIN BAICHUN, LI HONGWEI, MA TINGJUN, YANG ZONG, WANG CHENGZHI, DING YE, CUI YONGSHENG, LIU HUI, KONG FANLI, LI BAOCHANG, YANG GUOFU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIN BAICHUN
LI HONGWEI
MA TINGJUN
YANG ZONG
WANG CHENGZHI
DING YE
CUI YONGSHENG
LIU HUI
KONG FANLI
LI BAOCHANG
YANG GUOFU
description The utility model provides an excavation supporting precipitation integration tubular pile dado structure which characterized in that: including the dado stake, keeping off native board, pile cover, top supporting beam, the dado stake is that hollow steel tube structure, dado stake one side are equipped with the precipitation hole, and be connected with in the dado stake and keep off native board between the stake, dado pile bolck end connection pile cover, atress structure system is formed through pile cover top supporting beam jointly to relative dado pile bolck end. This structure can batch production reduce cost, can freely assemble, dismantle, and the existing equipment support can reuse to furthest saves the time limit for a project and practices thrift the cost, owing to dado stake, the native board of fender all can be demolishd after the construction and recycle, does not have any pollution, satisfies the environmental protection requirement, saves construction period. The construction side method is
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN206428707UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN206428707UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN206428707UU3</originalsourceid><addsrcrecordid>eNrjZPB2rUhOLEssyczPUyguLSjILyrJzEtXKChKTc4syCyBSGTmlaSmF0HYJaVJpTmJRQoFmTmpCimJKfkKxSVFpcklpUWpPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyMDMxMjC3MA8NNSYKEUAiMA3rA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Excavation supporting precipitation integration tubular pile dado structure</title><source>esp@cenet</source><creator>LIN BAICHUN ; LI HONGWEI ; MA TINGJUN ; YANG ZONG ; WANG CHENGZHI ; DING YE ; CUI YONGSHENG ; LIU HUI ; KONG FANLI ; LI BAOCHANG ; YANG GUOFU</creator><creatorcontrib>LIN BAICHUN ; LI HONGWEI ; MA TINGJUN ; YANG ZONG ; WANG CHENGZHI ; DING YE ; CUI YONGSHENG ; LIU HUI ; KONG FANLI ; LI BAOCHANG ; YANG GUOFU</creatorcontrib><description>The utility model provides an excavation supporting precipitation integration tubular pile dado structure which characterized in that: including the dado stake, keeping off native board, pile cover, top supporting beam, the dado stake is that hollow steel tube structure, dado stake one side are equipped with the precipitation hole, and be connected with in the dado stake and keep off native board between the stake, dado pile bolck end connection pile cover, atress structure system is formed through pile cover top supporting beam jointly to relative dado pile bolck end. This structure can batch production reduce cost, can freely assemble, dismantle, and the existing equipment support can reuse to furthest saves the time limit for a project and practices thrift the cost, owing to dado stake, the native board of fender all can be demolishd after the construction and recycle, does not have any pollution, satisfies the environmental protection requirement, saves construction period. The construction side method is</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20170822&amp;DB=EPODOC&amp;CC=CN&amp;NR=206428707U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20170822&amp;DB=EPODOC&amp;CC=CN&amp;NR=206428707U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIN BAICHUN</creatorcontrib><creatorcontrib>LI HONGWEI</creatorcontrib><creatorcontrib>MA TINGJUN</creatorcontrib><creatorcontrib>YANG ZONG</creatorcontrib><creatorcontrib>WANG CHENGZHI</creatorcontrib><creatorcontrib>DING YE</creatorcontrib><creatorcontrib>CUI YONGSHENG</creatorcontrib><creatorcontrib>LIU HUI</creatorcontrib><creatorcontrib>KONG FANLI</creatorcontrib><creatorcontrib>LI BAOCHANG</creatorcontrib><creatorcontrib>YANG GUOFU</creatorcontrib><title>Excavation supporting precipitation integration tubular pile dado structure</title><description>The utility model provides an excavation supporting precipitation integration tubular pile dado structure which characterized in that: including the dado stake, keeping off native board, pile cover, top supporting beam, the dado stake is that hollow steel tube structure, dado stake one side are equipped with the precipitation hole, and be connected with in the dado stake and keep off native board between the stake, dado pile bolck end connection pile cover, atress structure system is formed through pile cover top supporting beam jointly to relative dado pile bolck end. This structure can batch production reduce cost, can freely assemble, dismantle, and the existing equipment support can reuse to furthest saves the time limit for a project and practices thrift the cost, owing to dado stake, the native board of fender all can be demolishd after the construction and recycle, does not have any pollution, satisfies the environmental protection requirement, saves construction period. The construction side method is</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPB2rUhOLEssyczPUyguLSjILyrJzEtXKChKTc4syCyBSGTmlaSmF0HYJaVJpTmJRQoFmTmpCimJKfkKxSVFpcklpUWpPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyMDMxMjC3MA8NNSYKEUAiMA3rA</recordid><startdate>20170822</startdate><enddate>20170822</enddate><creator>LIN BAICHUN</creator><creator>LI HONGWEI</creator><creator>MA TINGJUN</creator><creator>YANG ZONG</creator><creator>WANG CHENGZHI</creator><creator>DING YE</creator><creator>CUI YONGSHENG</creator><creator>LIU HUI</creator><creator>KONG FANLI</creator><creator>LI BAOCHANG</creator><creator>YANG GUOFU</creator><scope>EVB</scope></search><sort><creationdate>20170822</creationdate><title>Excavation supporting precipitation integration tubular pile dado structure</title><author>LIN BAICHUN ; LI HONGWEI ; MA TINGJUN ; YANG ZONG ; WANG CHENGZHI ; DING YE ; CUI YONGSHENG ; LIU HUI ; KONG FANLI ; LI BAOCHANG ; YANG GUOFU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN206428707UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2017</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LIN BAICHUN</creatorcontrib><creatorcontrib>LI HONGWEI</creatorcontrib><creatorcontrib>MA TINGJUN</creatorcontrib><creatorcontrib>YANG ZONG</creatorcontrib><creatorcontrib>WANG CHENGZHI</creatorcontrib><creatorcontrib>DING YE</creatorcontrib><creatorcontrib>CUI YONGSHENG</creatorcontrib><creatorcontrib>LIU HUI</creatorcontrib><creatorcontrib>KONG FANLI</creatorcontrib><creatorcontrib>LI BAOCHANG</creatorcontrib><creatorcontrib>YANG GUOFU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIN BAICHUN</au><au>LI HONGWEI</au><au>MA TINGJUN</au><au>YANG ZONG</au><au>WANG CHENGZHI</au><au>DING YE</au><au>CUI YONGSHENG</au><au>LIU HUI</au><au>KONG FANLI</au><au>LI BAOCHANG</au><au>YANG GUOFU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Excavation supporting precipitation integration tubular pile dado structure</title><date>2017-08-22</date><risdate>2017</risdate><abstract>The utility model provides an excavation supporting precipitation integration tubular pile dado structure which characterized in that: including the dado stake, keeping off native board, pile cover, top supporting beam, the dado stake is that hollow steel tube structure, dado stake one side are equipped with the precipitation hole, and be connected with in the dado stake and keep off native board between the stake, dado pile bolck end connection pile cover, atress structure system is formed through pile cover top supporting beam jointly to relative dado pile bolck end. This structure can batch production reduce cost, can freely assemble, dismantle, and the existing equipment support can reuse to furthest saves the time limit for a project and practices thrift the cost, owing to dado stake, the native board of fender all can be demolishd after the construction and recycle, does not have any pollution, satisfies the environmental protection requirement, saves construction period. The construction side method is</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN206428707UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Excavation supporting precipitation integration tubular pile dado structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T01%3A29%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIN%20BAICHUN&rft.date=2017-08-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN206428707UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true