Tunnel construction safety control system
The utility model provides a tunnel construction safety control system, includes personnel orientation module, tunnel live video monitored control system and the tunnel personnel's action judge module that links to each other through wireless transmission module with the background processing m...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIANG PENG QIU XIHUA RUAN QI LYU DONGYUAN WANG HAIYING CHANG XIAO |
description | The utility model provides a tunnel construction safety control system, includes personnel orientation module, tunnel live video monitored control system and the tunnel personnel's action judge module that links to each other through wireless transmission module with the background processing module, personnel orientation module establish the label basic station in different positions including location identification card and a plurality of, tunnel live video monitored control system include the panoramic camera and be used for changing image data's encoder, tunnel personnel's action judge module including entrance guard basic station that has card reader chip and the RFID card that can be carried out uniqueness discernment by the entrance guard basic station, the background processing module is respectively through network and fiber connection distal end server and real -time data display module. The utility model discloses can realize the real -time attendance to the tunnel construction personnel, the effe |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN205788262UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN205788262UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN205788262UU3</originalsourceid><addsrcrecordid>eNrjZNAMKc3LS81RSM7PKy4pKk0uyczPUyhOTEstqQSJlRTl5ygUVxaXpObyMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jA1NzCwsjM6PQUGOiFAEAqhkqRw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel construction safety control system</title><source>esp@cenet</source><creator>LIANG PENG ; QIU XIHUA ; RUAN QI ; LYU DONGYUAN ; WANG HAIYING ; CHANG XIAO</creator><creatorcontrib>LIANG PENG ; QIU XIHUA ; RUAN QI ; LYU DONGYUAN ; WANG HAIYING ; CHANG XIAO</creatorcontrib><description>The utility model provides a tunnel construction safety control system, includes personnel orientation module, tunnel live video monitored control system and the tunnel personnel's action judge module that links to each other through wireless transmission module with the background processing module, personnel orientation module establish the label basic station in different positions including location identification card and a plurality of, tunnel live video monitored control system include the panoramic camera and be used for changing image data's encoder, tunnel personnel's action judge module including entrance guard basic station that has card reader chip and the RFID card that can be carried out uniqueness discernment by the entrance guard basic station, the background processing module is respectively through network and fiber connection distal end server and real -time data display module. The utility model discloses can realize the real -time attendance to the tunnel construction personnel, the effe</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161207&DB=EPODOC&CC=CN&NR=205788262U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161207&DB=EPODOC&CC=CN&NR=205788262U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIANG PENG</creatorcontrib><creatorcontrib>QIU XIHUA</creatorcontrib><creatorcontrib>RUAN QI</creatorcontrib><creatorcontrib>LYU DONGYUAN</creatorcontrib><creatorcontrib>WANG HAIYING</creatorcontrib><creatorcontrib>CHANG XIAO</creatorcontrib><title>Tunnel construction safety control system</title><description>The utility model provides a tunnel construction safety control system, includes personnel orientation module, tunnel live video monitored control system and the tunnel personnel's action judge module that links to each other through wireless transmission module with the background processing module, personnel orientation module establish the label basic station in different positions including location identification card and a plurality of, tunnel live video monitored control system include the panoramic camera and be used for changing image data's encoder, tunnel personnel's action judge module including entrance guard basic station that has card reader chip and the RFID card that can be carried out uniqueness discernment by the entrance guard basic station, the background processing module is respectively through network and fiber connection distal end server and real -time data display module. The utility model discloses can realize the real -time attendance to the tunnel construction personnel, the effe</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAMKc3LS81RSM7PKy4pKk0uyczPUyhOTEstqQSJlRTl5ygUVxaXpObyMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jA1NzCwsjM6PQUGOiFAEAqhkqRw</recordid><startdate>20161207</startdate><enddate>20161207</enddate><creator>LIANG PENG</creator><creator>QIU XIHUA</creator><creator>RUAN QI</creator><creator>LYU DONGYUAN</creator><creator>WANG HAIYING</creator><creator>CHANG XIAO</creator><scope>EVB</scope></search><sort><creationdate>20161207</creationdate><title>Tunnel construction safety control system</title><author>LIANG PENG ; QIU XIHUA ; RUAN QI ; LYU DONGYUAN ; WANG HAIYING ; CHANG XIAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN205788262UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LIANG PENG</creatorcontrib><creatorcontrib>QIU XIHUA</creatorcontrib><creatorcontrib>RUAN QI</creatorcontrib><creatorcontrib>LYU DONGYUAN</creatorcontrib><creatorcontrib>WANG HAIYING</creatorcontrib><creatorcontrib>CHANG XIAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIANG PENG</au><au>QIU XIHUA</au><au>RUAN QI</au><au>LYU DONGYUAN</au><au>WANG HAIYING</au><au>CHANG XIAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel construction safety control system</title><date>2016-12-07</date><risdate>2016</risdate><abstract>The utility model provides a tunnel construction safety control system, includes personnel orientation module, tunnel live video monitored control system and the tunnel personnel's action judge module that links to each other through wireless transmission module with the background processing module, personnel orientation module establish the label basic station in different positions including location identification card and a plurality of, tunnel live video monitored control system include the panoramic camera and be used for changing image data's encoder, tunnel personnel's action judge module including entrance guard basic station that has card reader chip and the RFID card that can be carried out uniqueness discernment by the entrance guard basic station, the background processing module is respectively through network and fiber connection distal end server and real -time data display module. The utility model discloses can realize the real -time attendance to the tunnel construction personnel, the effe</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN205788262UU |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Tunnel construction safety control system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T02%3A40%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIANG%20PENG&rft.date=2016-12-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN205788262UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |