System based on two closed loop realize intelligent control of transformer cooler group
The utility model relates to a system based on two closed loop realize intelligent control of transformer cooler group, wherein the system includes central management module, several motor control protection module and transformer data sampling module, central management module be connected with tra...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZOU HONGSEN YU XIAOJUN LIANG SHOUSHUO YIN ZHEHONG TANG XIN CEN DENGQING YE ZAIFU AN YANJIE YANG JIAXIANG YANG CHEN WANG HONGLI JIANG JIANLIN LIU ZHIYUAN LU HONGJIAN ZHAO JIAN CHEN HAOYANG CHEN RUI SONG JINGNING |
description | The utility model relates to a system based on two closed loop realize intelligent control of transformer cooler group, wherein the system includes central management module, several motor control protection module and transformer data sampling module, central management module be connected with transformer cooler, motor control protection module and transformer data sampling module respectively with central management module be connected, the system still including hauling oneself willingly into the module fully, the module of hauling oneself willingly into fully connect between central management module and two sections powers. Adopt this system, can real -time supervision the transformer oil temperature, load current and cooler unit operating current, according to the operation tactics of these data and transformer control by temperature change tactics and cooler, the input and the excision of operating duration automatically regulated forced air cooler unit, has realized transformer oil temperature, the a |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN205691979UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN205691979UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN205691979UU3</originalsourceid><addsrcrecordid>eNqNirsKAjEQANNYiPoPi73gAz1SH4qVjR6WR4ybI7CXDZsV0a_3BD_AaphhxuZ6fhXFHm6u4B04gT4ZPPHXiDmDoKP4RohJkSh2mBQ8JxUm4AAqLpXA0qMMmWlAJ_zIUzMKjgrOfpyY-WF_qY8LzNxiyc5jQm3r03q53dmVrWzTbP6aPhFgO2Y</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>System based on two closed loop realize intelligent control of transformer cooler group</title><source>esp@cenet</source><creator>ZOU HONGSEN ; YU XIAOJUN ; LIANG SHOUSHUO ; YIN ZHEHONG ; TANG XIN ; CEN DENGQING ; YE ZAIFU ; AN YANJIE ; YANG JIAXIANG ; YANG CHEN ; WANG HONGLI ; JIANG JIANLIN ; LIU ZHIYUAN ; LU HONGJIAN ; ZHAO JIAN ; CHEN HAOYANG ; CHEN RUI ; SONG JINGNING</creator><creatorcontrib>ZOU HONGSEN ; YU XIAOJUN ; LIANG SHOUSHUO ; YIN ZHEHONG ; TANG XIN ; CEN DENGQING ; YE ZAIFU ; AN YANJIE ; YANG JIAXIANG ; YANG CHEN ; WANG HONGLI ; JIANG JIANLIN ; LIU ZHIYUAN ; LU HONGJIAN ; ZHAO JIAN ; CHEN HAOYANG ; CHEN RUI ; SONG JINGNING</creatorcontrib><description>The utility model relates to a system based on two closed loop realize intelligent control of transformer cooler group, wherein the system includes central management module, several motor control protection module and transformer data sampling module, central management module be connected with transformer cooler, motor control protection module and transformer data sampling module respectively with central management module be connected, the system still including hauling oneself willingly into the module fully, the module of hauling oneself willingly into fully connect between central management module and two sections powers. Adopt this system, can real -time supervision the transformer oil temperature, load current and cooler unit operating current, according to the operation tactics of these data and transformer control by temperature change tactics and cooler, the input and the excision of operating duration automatically regulated forced air cooler unit, has realized transformer oil temperature, the a</description><language>chi ; eng</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161116&DB=EPODOC&CC=CN&NR=205691979U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161116&DB=EPODOC&CC=CN&NR=205691979U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZOU HONGSEN</creatorcontrib><creatorcontrib>YU XIAOJUN</creatorcontrib><creatorcontrib>LIANG SHOUSHUO</creatorcontrib><creatorcontrib>YIN ZHEHONG</creatorcontrib><creatorcontrib>TANG XIN</creatorcontrib><creatorcontrib>CEN DENGQING</creatorcontrib><creatorcontrib>YE ZAIFU</creatorcontrib><creatorcontrib>AN YANJIE</creatorcontrib><creatorcontrib>YANG JIAXIANG</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>WANG HONGLI</creatorcontrib><creatorcontrib>JIANG JIANLIN</creatorcontrib><creatorcontrib>LIU ZHIYUAN</creatorcontrib><creatorcontrib>LU HONGJIAN</creatorcontrib><creatorcontrib>ZHAO JIAN</creatorcontrib><creatorcontrib>CHEN HAOYANG</creatorcontrib><creatorcontrib>CHEN RUI</creatorcontrib><creatorcontrib>SONG JINGNING</creatorcontrib><title>System based on two closed loop realize intelligent control of transformer cooler group</title><description>The utility model relates to a system based on two closed loop realize intelligent control of transformer cooler group, wherein the system includes central management module, several motor control protection module and transformer data sampling module, central management module be connected with transformer cooler, motor control protection module and transformer data sampling module respectively with central management module be connected, the system still including hauling oneself willingly into the module fully, the module of hauling oneself willingly into fully connect between central management module and two sections powers. Adopt this system, can real -time supervision the transformer oil temperature, load current and cooler unit operating current, according to the operation tactics of these data and transformer control by temperature change tactics and cooler, the input and the excision of operating duration automatically regulated forced air cooler unit, has realized transformer oil temperature, the a</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirsKAjEQANNYiPoPi73gAz1SH4qVjR6WR4ybI7CXDZsV0a_3BD_AaphhxuZ6fhXFHm6u4B04gT4ZPPHXiDmDoKP4RohJkSh2mBQ8JxUm4AAqLpXA0qMMmWlAJ_zIUzMKjgrOfpyY-WF_qY8LzNxiyc5jQm3r03q53dmVrWzTbP6aPhFgO2Y</recordid><startdate>20161116</startdate><enddate>20161116</enddate><creator>ZOU HONGSEN</creator><creator>YU XIAOJUN</creator><creator>LIANG SHOUSHUO</creator><creator>YIN ZHEHONG</creator><creator>TANG XIN</creator><creator>CEN DENGQING</creator><creator>YE ZAIFU</creator><creator>AN YANJIE</creator><creator>YANG JIAXIANG</creator><creator>YANG CHEN</creator><creator>WANG HONGLI</creator><creator>JIANG JIANLIN</creator><creator>LIU ZHIYUAN</creator><creator>LU HONGJIAN</creator><creator>ZHAO JIAN</creator><creator>CHEN HAOYANG</creator><creator>CHEN RUI</creator><creator>SONG JINGNING</creator><scope>EVB</scope></search><sort><creationdate>20161116</creationdate><title>System based on two closed loop realize intelligent control of transformer cooler group</title><author>ZOU HONGSEN ; YU XIAOJUN ; LIANG SHOUSHUO ; YIN ZHEHONG ; TANG XIN ; CEN DENGQING ; YE ZAIFU ; AN YANJIE ; YANG JIAXIANG ; YANG CHEN ; WANG HONGLI ; JIANG JIANLIN ; LIU ZHIYUAN ; LU HONGJIAN ; ZHAO JIAN ; CHEN HAOYANG ; CHEN RUI ; SONG JINGNING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN205691979UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZOU HONGSEN</creatorcontrib><creatorcontrib>YU XIAOJUN</creatorcontrib><creatorcontrib>LIANG SHOUSHUO</creatorcontrib><creatorcontrib>YIN ZHEHONG</creatorcontrib><creatorcontrib>TANG XIN</creatorcontrib><creatorcontrib>CEN DENGQING</creatorcontrib><creatorcontrib>YE ZAIFU</creatorcontrib><creatorcontrib>AN YANJIE</creatorcontrib><creatorcontrib>YANG JIAXIANG</creatorcontrib><creatorcontrib>YANG CHEN</creatorcontrib><creatorcontrib>WANG HONGLI</creatorcontrib><creatorcontrib>JIANG JIANLIN</creatorcontrib><creatorcontrib>LIU ZHIYUAN</creatorcontrib><creatorcontrib>LU HONGJIAN</creatorcontrib><creatorcontrib>ZHAO JIAN</creatorcontrib><creatorcontrib>CHEN HAOYANG</creatorcontrib><creatorcontrib>CHEN RUI</creatorcontrib><creatorcontrib>SONG JINGNING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZOU HONGSEN</au><au>YU XIAOJUN</au><au>LIANG SHOUSHUO</au><au>YIN ZHEHONG</au><au>TANG XIN</au><au>CEN DENGQING</au><au>YE ZAIFU</au><au>AN YANJIE</au><au>YANG JIAXIANG</au><au>YANG CHEN</au><au>WANG HONGLI</au><au>JIANG JIANLIN</au><au>LIU ZHIYUAN</au><au>LU HONGJIAN</au><au>ZHAO JIAN</au><au>CHEN HAOYANG</au><au>CHEN RUI</au><au>SONG JINGNING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>System based on two closed loop realize intelligent control of transformer cooler group</title><date>2016-11-16</date><risdate>2016</risdate><abstract>The utility model relates to a system based on two closed loop realize intelligent control of transformer cooler group, wherein the system includes central management module, several motor control protection module and transformer data sampling module, central management module be connected with transformer cooler, motor control protection module and transformer data sampling module respectively with central management module be connected, the system still including hauling oneself willingly into the module fully, the module of hauling oneself willingly into fully connect between central management module and two sections powers. Adopt this system, can real -time supervision the transformer oil temperature, load current and cooler unit operating current, according to the operation tactics of these data and transformer control by temperature change tactics and cooler, the input and the excision of operating duration automatically regulated forced air cooler unit, has realized transformer oil temperature, the a</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN205691979UU |
source | esp@cenet |
subjects | CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING FUNCTIONAL ELEMENTS OF SUCH SYSTEMS MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING |
title | System based on two closed loop realize intelligent control of transformer cooler group |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T04%3A02%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZOU%20HONGSEN&rft.date=2016-11-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN205691979UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |