Take damping trench of light -duty well point

The utility model discloses a take damping trench of light -duty well point, it includes round fender pile (1) and round top beam (2), this circle fender pile (1) outside is equipped with the light -duty well point of round (3), the end elevation of light -duty well point (3) at the bottom of than d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG YAJUN, LI YONGCHENG, RUAN CHENGZHOU, JIAO ZHE, JIANG XIUQING, YANG YONGHUI, LYU GUOJUN, HAN CHAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG YAJUN
LI YONGCHENG
RUAN CHENGZHOU
JIAO ZHE
JIANG XIUQING
YANG YONGHUI
LYU GUOJUN
HAN CHAO
description The utility model discloses a take damping trench of light -duty well point, it includes round fender pile (1) and round top beam (2), this circle fender pile (1) outside is equipped with the light -duty well point of round (3), the end elevation of light -duty well point (3) at the bottom of than damping trench's ditch the elevation low more than 1 meter, the interval between per two adjacent light -duty well point (3) of this ring is 2~3 meters, support (4) in the top of following the damping trench width direction extension for one is established for 4~6 meters in the every interval of top beam (2) elevation department, every row of the inboard of fender pile (1) along length direction extends has at least one deck vibration prevention plate (6) through inflation screwed connection, damping trench from the ditch at the bottom of up the successive layer interval lay coarse sand layer (5) and fine coal grieshoch (7), coarse sand layer (5) and fine coal grieshoch (7) that laid at the interval constitute the s
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN205617447UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN205617447UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN205617447UU3</originalsourceid><addsrcrecordid>eNrjZNANScxOVUhJzC3IzEtXKClKzUvOUMhPU8jJTM8oUdBNKS2pVChPzclRKMjPzCvhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GBqZmhuYmJuahocZEKQIA4XMqdw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Take damping trench of light -duty well point</title><source>esp@cenet</source><creator>ZHANG YAJUN ; LI YONGCHENG ; RUAN CHENGZHOU ; JIAO ZHE ; JIANG XIUQING ; YANG YONGHUI ; LYU GUOJUN ; HAN CHAO</creator><creatorcontrib>ZHANG YAJUN ; LI YONGCHENG ; RUAN CHENGZHOU ; JIAO ZHE ; JIANG XIUQING ; YANG YONGHUI ; LYU GUOJUN ; HAN CHAO</creatorcontrib><description>The utility model discloses a take damping trench of light -duty well point, it includes round fender pile (1) and round top beam (2), this circle fender pile (1) outside is equipped with the light -duty well point of round (3), the end elevation of light -duty well point (3) at the bottom of than damping trench's ditch the elevation low more than 1 meter, the interval between per two adjacent light -duty well point (3) of this ring is 2~3 meters, support (4) in the top of following the damping trench width direction extension for one is established for 4~6 meters in the every interval of top beam (2) elevation department, every row of the inboard of fender pile (1) along length direction extends has at least one deck vibration prevention plate (6) through inflation screwed connection, damping trench from the ditch at the bottom of up the successive layer interval lay coarse sand layer (5) and fine coal grieshoch (7), coarse sand layer (5) and fine coal grieshoch (7) that laid at the interval constitute the s</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20161005&amp;DB=EPODOC&amp;CC=CN&amp;NR=205617447U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20161005&amp;DB=EPODOC&amp;CC=CN&amp;NR=205617447U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG YAJUN</creatorcontrib><creatorcontrib>LI YONGCHENG</creatorcontrib><creatorcontrib>RUAN CHENGZHOU</creatorcontrib><creatorcontrib>JIAO ZHE</creatorcontrib><creatorcontrib>JIANG XIUQING</creatorcontrib><creatorcontrib>YANG YONGHUI</creatorcontrib><creatorcontrib>LYU GUOJUN</creatorcontrib><creatorcontrib>HAN CHAO</creatorcontrib><title>Take damping trench of light -duty well point</title><description>The utility model discloses a take damping trench of light -duty well point, it includes round fender pile (1) and round top beam (2), this circle fender pile (1) outside is equipped with the light -duty well point of round (3), the end elevation of light -duty well point (3) at the bottom of than damping trench's ditch the elevation low more than 1 meter, the interval between per two adjacent light -duty well point (3) of this ring is 2~3 meters, support (4) in the top of following the damping trench width direction extension for one is established for 4~6 meters in the every interval of top beam (2) elevation department, every row of the inboard of fender pile (1) along length direction extends has at least one deck vibration prevention plate (6) through inflation screwed connection, damping trench from the ditch at the bottom of up the successive layer interval lay coarse sand layer (5) and fine coal grieshoch (7), coarse sand layer (5) and fine coal grieshoch (7) that laid at the interval constitute the s</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNANScxOVUhJzC3IzEtXKClKzUvOUMhPU8jJTM8oUdBNKS2pVChPzclRKMjPzCvhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GBqZmhuYmJuahocZEKQIA4XMqdw</recordid><startdate>20161005</startdate><enddate>20161005</enddate><creator>ZHANG YAJUN</creator><creator>LI YONGCHENG</creator><creator>RUAN CHENGZHOU</creator><creator>JIAO ZHE</creator><creator>JIANG XIUQING</creator><creator>YANG YONGHUI</creator><creator>LYU GUOJUN</creator><creator>HAN CHAO</creator><scope>EVB</scope></search><sort><creationdate>20161005</creationdate><title>Take damping trench of light -duty well point</title><author>ZHANG YAJUN ; LI YONGCHENG ; RUAN CHENGZHOU ; JIAO ZHE ; JIANG XIUQING ; YANG YONGHUI ; LYU GUOJUN ; HAN CHAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN205617447UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG YAJUN</creatorcontrib><creatorcontrib>LI YONGCHENG</creatorcontrib><creatorcontrib>RUAN CHENGZHOU</creatorcontrib><creatorcontrib>JIAO ZHE</creatorcontrib><creatorcontrib>JIANG XIUQING</creatorcontrib><creatorcontrib>YANG YONGHUI</creatorcontrib><creatorcontrib>LYU GUOJUN</creatorcontrib><creatorcontrib>HAN CHAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG YAJUN</au><au>LI YONGCHENG</au><au>RUAN CHENGZHOU</au><au>JIAO ZHE</au><au>JIANG XIUQING</au><au>YANG YONGHUI</au><au>LYU GUOJUN</au><au>HAN CHAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Take damping trench of light -duty well point</title><date>2016-10-05</date><risdate>2016</risdate><abstract>The utility model discloses a take damping trench of light -duty well point, it includes round fender pile (1) and round top beam (2), this circle fender pile (1) outside is equipped with the light -duty well point of round (3), the end elevation of light -duty well point (3) at the bottom of than damping trench's ditch the elevation low more than 1 meter, the interval between per two adjacent light -duty well point (3) of this ring is 2~3 meters, support (4) in the top of following the damping trench width direction extension for one is established for 4~6 meters in the every interval of top beam (2) elevation department, every row of the inboard of fender pile (1) along length direction extends has at least one deck vibration prevention plate (6) through inflation screwed connection, damping trench from the ditch at the bottom of up the successive layer interval lay coarse sand layer (5) and fine coal grieshoch (7), coarse sand layer (5) and fine coal grieshoch (7) that laid at the interval constitute the s</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN205617447UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Take damping trench of light -duty well point
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T01%3A42%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20YAJUN&rft.date=2016-10-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN205617447UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true