Grey system is arranged to bagasse boiler
The utility model provides a grey system is arranged to bagasse boiler, it includes the water sealed tank, the header tank, dust discharge pipe and movable water seal door, the water sealed tank sets up in the ash bucket below, the cinder notch of being connected with row's cinder notch of ash...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!