Escape canal structure is buried deeply to tunnel basement part
The utility model discloses an escape canal structure is buried deeply to tunnel basement part, including central drain pipe that is located the tunnel invert packing and a plurality of inspection shafts that set up along central drain pipe length direction, the tunnel basement is provided with the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!