Sediment device is received to drainage tunnel face

The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU FANGQIU, XIAO XUFENG, LI HUIHUI, HUANG ZHI, XU WEIMING, ZOU SHANG, HU FEIYUE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU FANGQIU
XIAO XUFENG
LI HUIHUI
HUANG ZHI
XU WEIMING
ZOU SHANG
HU FEIYUE
description The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts sediment case rear in this open drain, these both sides of receiving the sediment case are near the open drain right bank and left bank, and receive the baffle of sediment case front end for not being higher than 2MM, the rear end is the sieve in belt screen hole, this both sides and bottom surface of receiving the sediment case is the not whole board in belt screen hole, the both sides of this receipts sediment case respectively set up a set of electric block of being convenient for and connect and will receive the sediment case and hang toward the rings of scarfing cinder department. Each step of open drain both sides has a set of fixed block of stone, is equipped with a draw -in groove in the middle of the fixe
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN205206018UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN205206018UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN205206018UU3</originalsourceid><addsrcrecordid>eNrjZDAOTk3JzE3NK1FISS3LTE5VyCxWKEpNTs0sS01RKMlXSClKzMxLTE9VKCnNy0vNUUhLTE7lYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQVAJXmpJfHOfkYGpkYGZgaGFqGhxkQpAgAxUyzN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Sediment device is received to drainage tunnel face</title><source>esp@cenet</source><creator>LIU FANGQIU ; XIAO XUFENG ; LI HUIHUI ; HUANG ZHI ; XU WEIMING ; ZOU SHANG ; HU FEIYUE</creator><creatorcontrib>LIU FANGQIU ; XIAO XUFENG ; LI HUIHUI ; HUANG ZHI ; XU WEIMING ; ZOU SHANG ; HU FEIYUE</creatorcontrib><description>The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts sediment case rear in this open drain, these both sides of receiving the sediment case are near the open drain right bank and left bank, and receive the baffle of sediment case front end for not being higher than 2MM, the rear end is the sieve in belt screen hole, this both sides and bottom surface of receiving the sediment case is the not whole board in belt screen hole, the both sides of this receipts sediment case respectively set up a set of electric block of being convenient for and connect and will receive the sediment case and hang toward the rings of scarfing cinder department. Each step of open drain both sides has a set of fixed block of stone, is equipped with a draw -in groove in the middle of the fixe</description><language>chi ; eng</language><subject>CESSPOOLS ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SEWERAGE ; SEWERS ; WATER SUPPLY</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160504&amp;DB=EPODOC&amp;CC=CN&amp;NR=205206018U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160504&amp;DB=EPODOC&amp;CC=CN&amp;NR=205206018U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU FANGQIU</creatorcontrib><creatorcontrib>XIAO XUFENG</creatorcontrib><creatorcontrib>LI HUIHUI</creatorcontrib><creatorcontrib>HUANG ZHI</creatorcontrib><creatorcontrib>XU WEIMING</creatorcontrib><creatorcontrib>ZOU SHANG</creatorcontrib><creatorcontrib>HU FEIYUE</creatorcontrib><title>Sediment device is received to drainage tunnel face</title><description>The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts sediment case rear in this open drain, these both sides of receiving the sediment case are near the open drain right bank and left bank, and receive the baffle of sediment case front end for not being higher than 2MM, the rear end is the sieve in belt screen hole, this both sides and bottom surface of receiving the sediment case is the not whole board in belt screen hole, the both sides of this receipts sediment case respectively set up a set of electric block of being convenient for and connect and will receive the sediment case and hang toward the rings of scarfing cinder department. Each step of open drain both sides has a set of fixed block of stone, is equipped with a draw -in groove in the middle of the fixe</description><subject>CESSPOOLS</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAOTk3JzE3NK1FISS3LTE5VyCxWKEpNTs0sS01RKMlXSClKzMxLTE9VKCnNy0vNUUhLTE7lYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQVAJXmpJfHOfkYGpkYGZgaGFqGhxkQpAgAxUyzN</recordid><startdate>20160504</startdate><enddate>20160504</enddate><creator>LIU FANGQIU</creator><creator>XIAO XUFENG</creator><creator>LI HUIHUI</creator><creator>HUANG ZHI</creator><creator>XU WEIMING</creator><creator>ZOU SHANG</creator><creator>HU FEIYUE</creator><scope>EVB</scope></search><sort><creationdate>20160504</creationdate><title>Sediment device is received to drainage tunnel face</title><author>LIU FANGQIU ; XIAO XUFENG ; LI HUIHUI ; HUANG ZHI ; XU WEIMING ; ZOU SHANG ; HU FEIYUE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN205206018UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>CESSPOOLS</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU FANGQIU</creatorcontrib><creatorcontrib>XIAO XUFENG</creatorcontrib><creatorcontrib>LI HUIHUI</creatorcontrib><creatorcontrib>HUANG ZHI</creatorcontrib><creatorcontrib>XU WEIMING</creatorcontrib><creatorcontrib>ZOU SHANG</creatorcontrib><creatorcontrib>HU FEIYUE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU FANGQIU</au><au>XIAO XUFENG</au><au>LI HUIHUI</au><au>HUANG ZHI</au><au>XU WEIMING</au><au>ZOU SHANG</au><au>HU FEIYUE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Sediment device is received to drainage tunnel face</title><date>2016-05-04</date><risdate>2016</risdate><abstract>The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts sediment case rear in this open drain, these both sides of receiving the sediment case are near the open drain right bank and left bank, and receive the baffle of sediment case front end for not being higher than 2MM, the rear end is the sieve in belt screen hole, this both sides and bottom surface of receiving the sediment case is the not whole board in belt screen hole, the both sides of this receipts sediment case respectively set up a set of electric block of being convenient for and connect and will receive the sediment case and hang toward the rings of scarfing cinder department. Each step of open drain both sides has a set of fixed block of stone, is equipped with a draw -in groove in the middle of the fixe</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN205206018UU
source esp@cenet
subjects CESSPOOLS
EARTH DRILLING
FIXED CONSTRUCTIONS
MINING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SEWERAGE
SEWERS
WATER SUPPLY
title Sediment device is received to drainage tunnel face
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T06%3A02%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20FANGQIU&rft.date=2016-05-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN205206018UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true