Rapid traverse fast -assembling rig

The utility model relates to a petroleum drilling equipment technical field discloses a rapid traverse fast -assembling rig, and it includes equipment module, mud module, power module, and equipment module includes derrick and base, and the mud module includes that the mud tank puddles the pump, the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIANG XIAORONG, PANG SHIQIANG, ZHANG YANQIU, ZHANG JIAN, CHENG BIN, WANG YUANZHONG, REN DEYONG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIANG XIAORONG
PANG SHIQIANG
ZHANG YANQIU
ZHANG JIAN
CHENG BIN
WANG YUANZHONG
REN DEYONG
description The utility model relates to a petroleum drilling equipment technical field discloses a rapid traverse fast -assembling rig, and it includes equipment module, mud module, power module, and equipment module includes derrick and base, and the mud module includes that the mud tank puddles the pump, the derrick is split into four sections from the bottom to the top in proper order, and the both sides of the bottom looks opposition of first section derrick are equipped with preceding landing leg, back landing leg, four sections derricks are all by vertical back end, the anterior segment of splitting into " L " type of being the inversion, and when two sections derricks were connected, the back end adopted the couple to connect, and the anterior segment adopts the pin otic placode to connect, and the base comprises base module, concubine module, independent winch module, pipe setback beam mold piece, carousel and the independent drive beams module of carousel, base annex, and module interconnect locates to be equipped with the quick erection joint locking device of structure of looks adaptation, the utility model discloses the dismouting is convenient, can satisfy the road transport regulation and move fortune in long -distance, can wholly directly remove between well location closely again, improves the efficiency of rig transition.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204960815UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204960815UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204960815UU3</originalsourceid><addsrcrecordid>eNrjZFAOSizITFEoKUosSy0qTlVISywuUdBNLC5OzU3KycxLVyjKTOdhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGJpZmBhaGpqGhxkQpAgAa0ycC</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid traverse fast -assembling rig</title><source>esp@cenet</source><creator>XIANG XIAORONG ; PANG SHIQIANG ; ZHANG YANQIU ; ZHANG JIAN ; CHENG BIN ; WANG YUANZHONG ; REN DEYONG</creator><creatorcontrib>XIANG XIAORONG ; PANG SHIQIANG ; ZHANG YANQIU ; ZHANG JIAN ; CHENG BIN ; WANG YUANZHONG ; REN DEYONG</creatorcontrib><description>The utility model relates to a petroleum drilling equipment technical field discloses a rapid traverse fast -assembling rig, and it includes equipment module, mud module, power module, and equipment module includes derrick and base, and the mud module includes that the mud tank puddles the pump, the derrick is split into four sections from the bottom to the top in proper order, and the both sides of the bottom looks opposition of first section derrick are equipped with preceding landing leg, back landing leg, four sections derricks are all by vertical back end, the anterior segment of splitting into " L " type of being the inversion, and when two sections derricks were connected, the back end adopted the couple to connect, and the anterior segment adopts the pin otic placode to connect, and the base comprises base module, concubine module, independent winch module, pipe setback beam mold piece, carousel and the independent drive beams module of carousel, base annex, and module interconnect locates to be equipped with the quick erection joint locking device of structure of looks adaptation, the utility model discloses the dismouting is convenient, can satisfy the road transport regulation and move fortune in long -distance, can wholly directly remove between well location closely again, improves the efficiency of rig transition.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160113&amp;DB=EPODOC&amp;CC=CN&amp;NR=204960815U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160113&amp;DB=EPODOC&amp;CC=CN&amp;NR=204960815U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIANG XIAORONG</creatorcontrib><creatorcontrib>PANG SHIQIANG</creatorcontrib><creatorcontrib>ZHANG YANQIU</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>CHENG BIN</creatorcontrib><creatorcontrib>WANG YUANZHONG</creatorcontrib><creatorcontrib>REN DEYONG</creatorcontrib><title>Rapid traverse fast -assembling rig</title><description>The utility model relates to a petroleum drilling equipment technical field discloses a rapid traverse fast -assembling rig, and it includes equipment module, mud module, power module, and equipment module includes derrick and base, and the mud module includes that the mud tank puddles the pump, the derrick is split into four sections from the bottom to the top in proper order, and the both sides of the bottom looks opposition of first section derrick are equipped with preceding landing leg, back landing leg, four sections derricks are all by vertical back end, the anterior segment of splitting into " L " type of being the inversion, and when two sections derricks were connected, the back end adopted the couple to connect, and the anterior segment adopts the pin otic placode to connect, and the base comprises base module, concubine module, independent winch module, pipe setback beam mold piece, carousel and the independent drive beams module of carousel, base annex, and module interconnect locates to be equipped with the quick erection joint locking device of structure of looks adaptation, the utility model discloses the dismouting is convenient, can satisfy the road transport regulation and move fortune in long -distance, can wholly directly remove between well location closely again, improves the efficiency of rig transition.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAOSizITFEoKUosSy0qTlVISywuUdBNLC5OzU3KycxLVyjKTOdhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGJpZmBhaGpqGhxkQpAgAa0ycC</recordid><startdate>20160113</startdate><enddate>20160113</enddate><creator>XIANG XIAORONG</creator><creator>PANG SHIQIANG</creator><creator>ZHANG YANQIU</creator><creator>ZHANG JIAN</creator><creator>CHENG BIN</creator><creator>WANG YUANZHONG</creator><creator>REN DEYONG</creator><scope>EVB</scope></search><sort><creationdate>20160113</creationdate><title>Rapid traverse fast -assembling rig</title><author>XIANG XIAORONG ; PANG SHIQIANG ; ZHANG YANQIU ; ZHANG JIAN ; CHENG BIN ; WANG YUANZHONG ; REN DEYONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204960815UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2016</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>XIANG XIAORONG</creatorcontrib><creatorcontrib>PANG SHIQIANG</creatorcontrib><creatorcontrib>ZHANG YANQIU</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>CHENG BIN</creatorcontrib><creatorcontrib>WANG YUANZHONG</creatorcontrib><creatorcontrib>REN DEYONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIANG XIAORONG</au><au>PANG SHIQIANG</au><au>ZHANG YANQIU</au><au>ZHANG JIAN</au><au>CHENG BIN</au><au>WANG YUANZHONG</au><au>REN DEYONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid traverse fast -assembling rig</title><date>2016-01-13</date><risdate>2016</risdate><abstract>The utility model relates to a petroleum drilling equipment technical field discloses a rapid traverse fast -assembling rig, and it includes equipment module, mud module, power module, and equipment module includes derrick and base, and the mud module includes that the mud tank puddles the pump, the derrick is split into four sections from the bottom to the top in proper order, and the both sides of the bottom looks opposition of first section derrick are equipped with preceding landing leg, back landing leg, four sections derricks are all by vertical back end, the anterior segment of splitting into " L " type of being the inversion, and when two sections derricks were connected, the back end adopted the couple to connect, and the anterior segment adopts the pin otic placode to connect, and the base comprises base module, concubine module, independent winch module, pipe setback beam mold piece, carousel and the independent drive beams module of carousel, base annex, and module interconnect locates to be equipped with the quick erection joint locking device of structure of looks adaptation, the utility model discloses the dismouting is convenient, can satisfy the road transport regulation and move fortune in long -distance, can wholly directly remove between well location closely again, improves the efficiency of rig transition.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204960815UU
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title Rapid traverse fast -assembling rig
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T20%3A29%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIANG%20XIAORONG&rft.date=2016-01-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204960815UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true