Build steel sheet piling cofferdam structure of exposing under water on basement rock

The utility model discloses a build steel sheet piling cofferdam structure of exposing under water on basement rock. This structure steel sheet piling cofferdam lies in between the both sides of river bank, and the multiunit owner cofferdam grid that comprises steel sheet pile combination constitute...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: REN WEIQIN, WU XIGUO, YI SHISEN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator REN WEIQIN
WU XIGUO
YI SHISEN
description The utility model discloses a build steel sheet piling cofferdam structure of exposing under water on basement rock. This structure steel sheet piling cofferdam lies in between the both sides of river bank, and the multiunit owner cofferdam grid that comprises steel sheet pile combination constitutes with the continuity of vice cofferdam grid interval, packs the grit in main cofferdam grid and the vice cofferdam grid, and steel sheet piling cofferdam bottom riverbed has the manual work to jettisoning the back -up sand to form the basic overburden that is used for the steel sheet pile location, and main, vice cofferdam grid is by constituting through the hasp structural connection. The utility model discloses the structure does not need surface of water drilling to build the mounting groove, has reduced construction cost effectively, has shortened engineering construction cycle, has improved work efficiency, forming the basic overburden that is used for the steel sheet pile location through the back -up sand of jettisoninging, forming under water the construction environment that has the overburden on the naked batholithite, beat the steel sheet pile and fold the cofferdam construction and accomplish the steel sheet piling cofferdam construction through inserting again, steel sheet pile installation location is accurate and the construction technology degree of difficulty is little, has reduced the facility request, has realized the cofferdam construction of high -efficient high grade.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204875822UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204875822UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204875822UU3</originalsourceid><addsrcrecordid>eNqNij0KAjEUBtNYiHqHh70gq-LWLoqVlamXmHzRYDYv5Ac9vit4AJuZYmYq5KE6bygXwFN-AIWi8y7cSbO1SEYNY0xVl5pAbAnvyPnbazBI9FJlJAe6qYwBoVBi_ZyLiVU-Y_HzTCxPx2t3XiFyjxyVRkDpu0uz3rb7Xds0Um7-mj5rhDo7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Build steel sheet piling cofferdam structure of exposing under water on basement rock</title><source>esp@cenet</source><creator>REN WEIQIN ; WU XIGUO ; YI SHISEN</creator><creatorcontrib>REN WEIQIN ; WU XIGUO ; YI SHISEN</creatorcontrib><description>The utility model discloses a build steel sheet piling cofferdam structure of exposing under water on basement rock. This structure steel sheet piling cofferdam lies in between the both sides of river bank, and the multiunit owner cofferdam grid that comprises steel sheet pile combination constitutes with the continuity of vice cofferdam grid interval, packs the grit in main cofferdam grid and the vice cofferdam grid, and steel sheet piling cofferdam bottom riverbed has the manual work to jettisoning the back -up sand to form the basic overburden that is used for the steel sheet pile location, and main, vice cofferdam grid is by constituting through the hasp structural connection. The utility model discloses the structure does not need surface of water drilling to build the mounting groove, has reduced construction cost effectively, has shortened engineering construction cycle, has improved work efficiency, forming the basic overburden that is used for the steel sheet pile location through the back -up sand of jettisoninging, forming under water the construction environment that has the overburden on the naked batholithite, beat the steel sheet pile and fold the cofferdam construction and accomplish the steel sheet piling cofferdam construction through inserting again, steel sheet pile installation location is accurate and the construction technology degree of difficulty is little, has reduced the facility request, has realized the cofferdam construction of high -efficient high grade.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151216&amp;DB=EPODOC&amp;CC=CN&amp;NR=204875822U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151216&amp;DB=EPODOC&amp;CC=CN&amp;NR=204875822U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>REN WEIQIN</creatorcontrib><creatorcontrib>WU XIGUO</creatorcontrib><creatorcontrib>YI SHISEN</creatorcontrib><title>Build steel sheet piling cofferdam structure of exposing under water on basement rock</title><description>The utility model discloses a build steel sheet piling cofferdam structure of exposing under water on basement rock. This structure steel sheet piling cofferdam lies in between the both sides of river bank, and the multiunit owner cofferdam grid that comprises steel sheet pile combination constitutes with the continuity of vice cofferdam grid interval, packs the grit in main cofferdam grid and the vice cofferdam grid, and steel sheet piling cofferdam bottom riverbed has the manual work to jettisoning the back -up sand to form the basic overburden that is used for the steel sheet pile location, and main, vice cofferdam grid is by constituting through the hasp structural connection. The utility model discloses the structure does not need surface of water drilling to build the mounting groove, has reduced construction cost effectively, has shortened engineering construction cycle, has improved work efficiency, forming the basic overburden that is used for the steel sheet pile location through the back -up sand of jettisoninging, forming under water the construction environment that has the overburden on the naked batholithite, beat the steel sheet pile and fold the cofferdam construction and accomplish the steel sheet piling cofferdam construction through inserting again, steel sheet pile installation location is accurate and the construction technology degree of difficulty is little, has reduced the facility request, has realized the cofferdam construction of high -efficient high grade.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNij0KAjEUBtNYiHqHh70gq-LWLoqVlamXmHzRYDYv5Ac9vit4AJuZYmYq5KE6bygXwFN-AIWi8y7cSbO1SEYNY0xVl5pAbAnvyPnbazBI9FJlJAe6qYwBoVBi_ZyLiVU-Y_HzTCxPx2t3XiFyjxyVRkDpu0uz3rb7Xds0Um7-mj5rhDo7</recordid><startdate>20151216</startdate><enddate>20151216</enddate><creator>REN WEIQIN</creator><creator>WU XIGUO</creator><creator>YI SHISEN</creator><scope>EVB</scope></search><sort><creationdate>20151216</creationdate><title>Build steel sheet piling cofferdam structure of exposing under water on basement rock</title><author>REN WEIQIN ; WU XIGUO ; YI SHISEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204875822UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>REN WEIQIN</creatorcontrib><creatorcontrib>WU XIGUO</creatorcontrib><creatorcontrib>YI SHISEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>REN WEIQIN</au><au>WU XIGUO</au><au>YI SHISEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Build steel sheet piling cofferdam structure of exposing under water on basement rock</title><date>2015-12-16</date><risdate>2015</risdate><abstract>The utility model discloses a build steel sheet piling cofferdam structure of exposing under water on basement rock. This structure steel sheet piling cofferdam lies in between the both sides of river bank, and the multiunit owner cofferdam grid that comprises steel sheet pile combination constitutes with the continuity of vice cofferdam grid interval, packs the grit in main cofferdam grid and the vice cofferdam grid, and steel sheet piling cofferdam bottom riverbed has the manual work to jettisoning the back -up sand to form the basic overburden that is used for the steel sheet pile location, and main, vice cofferdam grid is by constituting through the hasp structural connection. The utility model discloses the structure does not need surface of water drilling to build the mounting groove, has reduced construction cost effectively, has shortened engineering construction cycle, has improved work efficiency, forming the basic overburden that is used for the steel sheet pile location through the back -up sand of jettisoninging, forming under water the construction environment that has the overburden on the naked batholithite, beat the steel sheet pile and fold the cofferdam construction and accomplish the steel sheet piling cofferdam construction through inserting again, steel sheet pile installation location is accurate and the construction technology degree of difficulty is little, has reduced the facility request, has realized the cofferdam construction of high -efficient high grade.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204875822UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Build steel sheet piling cofferdam structure of exposing under water on basement rock
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T03%3A21%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=REN%20WEIQIN&rft.date=2015-12-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204875822UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true