Small -size sediment field slope protection structure of water electrical engineering
(B, ) the utility model discloses a small -size sediment field slope protection structure of water electrical engineering, including sediment field barricade (4), sediment field barricade (4) one side is piled and is had slag charge (3), and slag charge (3) top is equipped with precast concrete piec...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | (B, ) the utility model discloses a small -size sediment field slope protection structure of water electrical engineering, including sediment field barricade (4), sediment field barricade (4) one side is piled and is had slag charge (3), and slag charge (3) top is equipped with precast concrete piece (2), is equipped with with muscle material (1) in slag charge (3). The utility model provides a construction of water electrical engineering sediment field sash roof beam delay construction period more slowly, problem that construction cost is high can be accelerated the construction and practice thrift the investment, can also adapt to the influence of local settlement, middle -size and small -size eaerthquake damage simultaneously. (B, ) |
---|