Shield constructs prefabricated type collection heatable adobe sleeping platform of assembling of construction

The utility model relates to a shield constructs prefabricated type collection heatable adobe sleeping platform of assembling of construction belongs to the shield and constructs construction technical field. This album of heatable adobe sleeping platform includes: collection heatable adobe sleeping...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHUAI YUBING, WANG XIJUN, LI SHENGGUANG, WANG LIMIN, YOU DAJIANG, ZHANG HANLING, MA YUNXIN, ZHAO HONGYAN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model relates to a shield constructs prefabricated type collection heatable adobe sleeping platform of assembling of construction belongs to the shield and constructs construction technical field. This album of heatable adobe sleeping platform includes: collection heatable adobe sleeping platform bottom plate, outside fixed beam, the foundation ring roof beam forms the clearance between the fixed beam at the foundation ring roof beam and outside stating, the steel sheet is assembled in first prefabrication, the steel sheet is assembled in the second prefabrication, first prefabrication is assembled the steel sheet and is inserted on earth the collar tie beam and state and form the clearance between the fixed beam of the outside, adjacent first prefabrication is assembled through side connecting plate sealing connection between the steel sheet, assemble the steel sheet in an album heatable adobe sleeping platform bottom plate corner second prefabrication of use to it assembles steel sheet sealing connection with the second prefabrication to make the first prefabrication of collecting heatable adobe sleeping platform bottom plate corner assemble the steel sheet. The beneficial effects of the utility model are that: reduce the excavating depth, reduction excavation construction volume, reduction cement concreting construction, later stage cement structure are abolished easily to but reach the prefabrication and assemble steel sheet recycle, avoid the wasting of resources.