Asymmetric pyramid shaped bridge tower

The utility model relates to an asymmetric pyramid shaped bridge tower belongs to the bridge tower structure of the novel cable -stay bridge of water conservancy project. King -post bottom respectively with respective tower mound fixed connection, the top of the tower intersect at the top, tower mou...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG TINGXIU, YANG JINLIANG, LIU JUNSHENG, RU SHIRONG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG TINGXIU
YANG JINLIANG
LIU JUNSHENG
RU SHIRONG
description The utility model relates to an asymmetric pyramid shaped bridge tower belongs to the bridge tower structure of the novel cable -stay bridge of water conservancy project. King -post bottom respectively with respective tower mound fixed connection, the top of the tower intersect at the top, tower mound and bridge tower basis fixed connection, horizontally roof beam interconnect is passed through to bridge tower counter weight position in the top of the bridge tower basis between the tower mound between each king -post, wherein king -post no. 1 is connected through roof beam no. 1 between two with the king -post, king -post no. 2 is connected through roof beam no. 2 between three with the king -post, king -post no. 3 is connected through roof beam no. 3 between four with the king -post, king -post no. 4 is connected through roof beam no. 4 between one with the king -post, roof beam no. 2, roof beam quartering do not be two perpendicular with the bridge axis of the bridge axis of bridge floor no. 1, bridge floor no. 2, bridge floor no. 1, bridge floor policy of "literature and art should serve both people and socialism" broken line bridge floor. The advantage is novel structure, sets up side direction that counter weight district both can keep balance the transmission of the broken line bridge floor load that topples, can also keep balance the unsymmetrical loading that asymmetric bridge floor transmitted, can be used to water conservancy project structural design under the non - symmetrical arrangement circumstances.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204753385UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204753385UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204753385UU3</originalsourceid><addsrcrecordid>eNrjZFBzLK7MzU0tKcpMViioLErMzUxRKM5ILEhNUUgqykxJT1UoyS9PLeJhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGJuamxsYWpqGhxkQpAgDbWSiS</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Asymmetric pyramid shaped bridge tower</title><source>esp@cenet</source><creator>ZHANG TINGXIU ; YANG JINLIANG ; LIU JUNSHENG ; RU SHIRONG</creator><creatorcontrib>ZHANG TINGXIU ; YANG JINLIANG ; LIU JUNSHENG ; RU SHIRONG</creatorcontrib><description>The utility model relates to an asymmetric pyramid shaped bridge tower belongs to the bridge tower structure of the novel cable -stay bridge of water conservancy project. King -post bottom respectively with respective tower mound fixed connection, the top of the tower intersect at the top, tower mound and bridge tower basis fixed connection, horizontally roof beam interconnect is passed through to bridge tower counter weight position in the top of the bridge tower basis between the tower mound between each king -post, wherein king -post no. 1 is connected through roof beam no. 1 between two with the king -post, king -post no. 2 is connected through roof beam no. 2 between three with the king -post, king -post no. 3 is connected through roof beam no. 3 between four with the king -post, king -post no. 4 is connected through roof beam no. 4 between one with the king -post, roof beam no. 2, roof beam quartering do not be two perpendicular with the bridge axis of the bridge axis of bridge floor no. 1, bridge floor no. 2, bridge floor no. 1, bridge floor policy of "literature and art should serve both people and socialism" broken line bridge floor. The advantage is novel structure, sets up side direction that counter weight district both can keep balance the transmission of the broken line bridge floor load that topples, can also keep balance the unsymmetrical loading that asymmetric bridge floor transmitted, can be used to water conservancy project structural design under the non - symmetrical arrangement circumstances.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151111&amp;DB=EPODOC&amp;CC=CN&amp;NR=204753385U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151111&amp;DB=EPODOC&amp;CC=CN&amp;NR=204753385U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG TINGXIU</creatorcontrib><creatorcontrib>YANG JINLIANG</creatorcontrib><creatorcontrib>LIU JUNSHENG</creatorcontrib><creatorcontrib>RU SHIRONG</creatorcontrib><title>Asymmetric pyramid shaped bridge tower</title><description>The utility model relates to an asymmetric pyramid shaped bridge tower belongs to the bridge tower structure of the novel cable -stay bridge of water conservancy project. King -post bottom respectively with respective tower mound fixed connection, the top of the tower intersect at the top, tower mound and bridge tower basis fixed connection, horizontally roof beam interconnect is passed through to bridge tower counter weight position in the top of the bridge tower basis between the tower mound between each king -post, wherein king -post no. 1 is connected through roof beam no. 1 between two with the king -post, king -post no. 2 is connected through roof beam no. 2 between three with the king -post, king -post no. 3 is connected through roof beam no. 3 between four with the king -post, king -post no. 4 is connected through roof beam no. 4 between one with the king -post, roof beam no. 2, roof beam quartering do not be two perpendicular with the bridge axis of the bridge axis of bridge floor no. 1, bridge floor no. 2, bridge floor no. 1, bridge floor policy of "literature and art should serve both people and socialism" broken line bridge floor. The advantage is novel structure, sets up side direction that counter weight district both can keep balance the transmission of the broken line bridge floor load that topples, can also keep balance the unsymmetrical loading that asymmetric bridge floor transmitted, can be used to water conservancy project structural design under the non - symmetrical arrangement circumstances.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBzLK7MzU0tKcpMViioLErMzUxRKM5ILEhNUUgqykxJT1UoyS9PLeJhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGJuamxsYWpqGhxkQpAgDbWSiS</recordid><startdate>20151111</startdate><enddate>20151111</enddate><creator>ZHANG TINGXIU</creator><creator>YANG JINLIANG</creator><creator>LIU JUNSHENG</creator><creator>RU SHIRONG</creator><scope>EVB</scope></search><sort><creationdate>20151111</creationdate><title>Asymmetric pyramid shaped bridge tower</title><author>ZHANG TINGXIU ; YANG JINLIANG ; LIU JUNSHENG ; RU SHIRONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204753385UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG TINGXIU</creatorcontrib><creatorcontrib>YANG JINLIANG</creatorcontrib><creatorcontrib>LIU JUNSHENG</creatorcontrib><creatorcontrib>RU SHIRONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG TINGXIU</au><au>YANG JINLIANG</au><au>LIU JUNSHENG</au><au>RU SHIRONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Asymmetric pyramid shaped bridge tower</title><date>2015-11-11</date><risdate>2015</risdate><abstract>The utility model relates to an asymmetric pyramid shaped bridge tower belongs to the bridge tower structure of the novel cable -stay bridge of water conservancy project. King -post bottom respectively with respective tower mound fixed connection, the top of the tower intersect at the top, tower mound and bridge tower basis fixed connection, horizontally roof beam interconnect is passed through to bridge tower counter weight position in the top of the bridge tower basis between the tower mound between each king -post, wherein king -post no. 1 is connected through roof beam no. 1 between two with the king -post, king -post no. 2 is connected through roof beam no. 2 between three with the king -post, king -post no. 3 is connected through roof beam no. 3 between four with the king -post, king -post no. 4 is connected through roof beam no. 4 between one with the king -post, roof beam no. 2, roof beam quartering do not be two perpendicular with the bridge axis of the bridge axis of bridge floor no. 1, bridge floor no. 2, bridge floor no. 1, bridge floor policy of "literature and art should serve both people and socialism" broken line bridge floor. The advantage is novel structure, sets up side direction that counter weight district both can keep balance the transmission of the broken line bridge floor load that topples, can also keep balance the unsymmetrical loading that asymmetric bridge floor transmitted, can be used to water conservancy project structural design under the non - symmetrical arrangement circumstances.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204753385UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Asymmetric pyramid shaped bridge tower
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T07%3A49%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20TINGXIU&rft.date=2015-11-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204753385UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true