Preheating of air and flue gas waste heat utilization system
The utility model discloses special preheating of air technical field to the boiler. The utility model discloses a preheating of air and flue gas waste heat utilization system, include: flue gas passageway (17), air duct (20), air heater (9), condensate water flue heat exchanger (8) and condensate w...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | HAO JIANGPING JIANG PING WEI SHAOQING |
description | The utility model discloses special preheating of air technical field to the boiler. The utility model discloses a preheating of air and flue gas waste heat utilization system, include: flue gas passageway (17), air duct (20), air heater (9), condensate water flue heat exchanger (8) and condensate water air duct heat exchanger (19) still include: the condensate water comes water header (15), condensate water return main (12), flue gas passageway (17) and air duct (20) all link to each other with air heater (9), condensate water flue heat exchanger (8) is arranged on flue gas passageway (17) behind air heater (9) along flue gas flow, condensate water air duct heat exchanger (19) is along the air current to arranging on air heater (9) preceding air duct (20). The utility model discloses the heat transfer of can discharging fume according to service condition's change automatically regulated realizes receiving under the prerequisite of hot side safety and system's normal operating guaranteeing, ensures the maximize of thermodynamic cycle efficiency and the economic nature of system. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204693472UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204693472UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204693472UU3</originalsourceid><addsrcrecordid>eNrjZLAJKErNSE0sycxLV8hPU0jMLFJIzEtRSMspTVVITyxWKE8sLklVAKlQKC3JzMmsAirNz1MorgQK5_IwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyMDEzNLYxNzo9BQY6IUAQAqJTB6</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Preheating of air and flue gas waste heat utilization system</title><source>esp@cenet</source><creator>HAO JIANGPING ; JIANG PING ; WEI SHAOQING</creator><creatorcontrib>HAO JIANGPING ; JIANG PING ; WEI SHAOQING</creatorcontrib><description>The utility model discloses special preheating of air technical field to the boiler. The utility model discloses a preheating of air and flue gas waste heat utilization system, include: flue gas passageway (17), air duct (20), air heater (9), condensate water flue heat exchanger (8) and condensate water air duct heat exchanger (19) still include: the condensate water comes water header (15), condensate water return main (12), flue gas passageway (17) and air duct (20) all link to each other with air heater (9), condensate water flue heat exchanger (8) is arranged on flue gas passageway (17) behind air heater (9) along flue gas flow, condensate water air duct heat exchanger (19) is along the air current to arranging on air heater (9) preceding air duct (20). The utility model discloses the heat transfer of can discharging fume according to service condition's change automatically regulated realizes receiving under the prerequisite of hot side safety and system's normal operating guaranteeing, ensures the maximize of thermodynamic cycle efficiency and the economic nature of system.</description><language>eng</language><subject>AIR SUPPLY ; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHINBOILERS ; BLASTING ; COMBUSTION APPARATUS ; COMBUSTION PROCESSES ; CONTROLLING WATER LEVEL ; DRAUGHT-INDUCING ; FEED-WATER SUPPLY ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER ; STEAM GENERATION ; SUPPLYING NON-COMBUSTIBLE LIQUID OR GAS ; WEAPONS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151007&DB=EPODOC&CC=CN&NR=204693472U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151007&DB=EPODOC&CC=CN&NR=204693472U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HAO JIANGPING</creatorcontrib><creatorcontrib>JIANG PING</creatorcontrib><creatorcontrib>WEI SHAOQING</creatorcontrib><title>Preheating of air and flue gas waste heat utilization system</title><description>The utility model discloses special preheating of air technical field to the boiler. The utility model discloses a preheating of air and flue gas waste heat utilization system, include: flue gas passageway (17), air duct (20), air heater (9), condensate water flue heat exchanger (8) and condensate water air duct heat exchanger (19) still include: the condensate water comes water header (15), condensate water return main (12), flue gas passageway (17) and air duct (20) all link to each other with air heater (9), condensate water flue heat exchanger (8) is arranged on flue gas passageway (17) behind air heater (9) along flue gas flow, condensate water air duct heat exchanger (19) is along the air current to arranging on air heater (9) preceding air duct (20). The utility model discloses the heat transfer of can discharging fume according to service condition's change automatically regulated realizes receiving under the prerequisite of hot side safety and system's normal operating guaranteeing, ensures the maximize of thermodynamic cycle efficiency and the economic nature of system.</description><subject>AIR SUPPLY</subject><subject>AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHINBOILERS</subject><subject>BLASTING</subject><subject>COMBUSTION APPARATUS</subject><subject>COMBUSTION PROCESSES</subject><subject>CONTROLLING WATER LEVEL</subject><subject>DRAUGHT-INDUCING</subject><subject>FEED-WATER SUPPLY</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER</subject><subject>STEAM GENERATION</subject><subject>SUPPLYING NON-COMBUSTIBLE LIQUID OR GAS</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAJKErNSE0sycxLV8hPU0jMLFJIzEtRSMspTVVITyxWKE8sLklVAKlQKC3JzMmsAirNz1MorgQK5_IwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyMDEzNLYxNzo9BQY6IUAQAqJTB6</recordid><startdate>20151007</startdate><enddate>20151007</enddate><creator>HAO JIANGPING</creator><creator>JIANG PING</creator><creator>WEI SHAOQING</creator><scope>EVB</scope></search><sort><creationdate>20151007</creationdate><title>Preheating of air and flue gas waste heat utilization system</title><author>HAO JIANGPING ; JIANG PING ; WEI SHAOQING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204693472UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>AIR SUPPLY</topic><topic>AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHINBOILERS</topic><topic>BLASTING</topic><topic>COMBUSTION APPARATUS</topic><topic>COMBUSTION PROCESSES</topic><topic>CONTROLLING WATER LEVEL</topic><topic>DRAUGHT-INDUCING</topic><topic>FEED-WATER SUPPLY</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER</topic><topic>STEAM GENERATION</topic><topic>SUPPLYING NON-COMBUSTIBLE LIQUID OR GAS</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>HAO JIANGPING</creatorcontrib><creatorcontrib>JIANG PING</creatorcontrib><creatorcontrib>WEI SHAOQING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HAO JIANGPING</au><au>JIANG PING</au><au>WEI SHAOQING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Preheating of air and flue gas waste heat utilization system</title><date>2015-10-07</date><risdate>2015</risdate><abstract>The utility model discloses special preheating of air technical field to the boiler. The utility model discloses a preheating of air and flue gas waste heat utilization system, include: flue gas passageway (17), air duct (20), air heater (9), condensate water flue heat exchanger (8) and condensate water air duct heat exchanger (19) still include: the condensate water comes water header (15), condensate water return main (12), flue gas passageway (17) and air duct (20) all link to each other with air heater (9), condensate water flue heat exchanger (8) is arranged on flue gas passageway (17) behind air heater (9) along flue gas flow, condensate water air duct heat exchanger (19) is along the air current to arranging on air heater (9) preceding air duct (20). The utility model discloses the heat transfer of can discharging fume according to service condition's change automatically regulated realizes receiving under the prerequisite of hot side safety and system's normal operating guaranteeing, ensures the maximize of thermodynamic cycle efficiency and the economic nature of system.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_CN204693472UU |
source | esp@cenet |
subjects | AIR SUPPLY AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHINBOILERS BLASTING COMBUSTION APPARATUS COMBUSTION PROCESSES CONTROLLING WATER LEVEL DRAUGHT-INDUCING FEED-WATER SUPPLY HEATING LIGHTING MECHANICAL ENGINEERING PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER STEAM GENERATION SUPPLYING NON-COMBUSTIBLE LIQUID OR GAS WEAPONS |
title | Preheating of air and flue gas waste heat utilization system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T03%3A29%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HAO%20JIANGPING&rft.date=2015-10-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204693472UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |