That can pass through semi -girder truss walks guidance tape device

The utility model relates to a that can pass through semi -girder truss walks guidance tape device includes mainly that two ledger boards, two turn over board, hinge, bolt, two hinges, its characterized in that: every ledger board turns over the board with the lot and passes through hinge connection...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG CHENGHONG, TANG BIBO, LI JIAHONG, LIU BO, CHEN JIANGWEI, CHEN LI, ZHAO FEI, TANG XINYUAN, WANG ZHEN, WEI CHENKANG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHENG CHENGHONG
TANG BIBO
LI JIAHONG
LIU BO
CHEN JIANGWEI
CHEN LI
ZHAO FEI
TANG XINYUAN
WANG ZHEN
WEI CHENKANG
description The utility model relates to a that can pass through semi -girder truss walks guidance tape device includes mainly that two ledger boards, two turn over board, hinge, bolt, two hinges, its characterized in that: every ledger board turns over the board with the lot and passes through hinge connection to use the bolt fastening, every ledger board edge adopts other hinge and top mould pylon fossil fragments to be connected, and a hinge is respectively connected in two outsides of turning over the board, and the other end of every hinge is fixed on a mould pylon fossil fragments. The utility model discloses but the ledger board of wide application in a mould stores pylon is assembled to the solution is when running into a core section of thick bamboo and have member such as semi -girder truss need pass through a mould stores pylon, and top mould stores pylon is walked the guidance tape and can be dodged the member through opening, and then reduces top mould stores pylon tearing down and reconstructing in the use. The utility model provides an unable construction when meetting the component that need pass through it of top mould stores pylon system, need tear down and reconstruct the problem of stores pylon system, this method is easy and simple to handle, practical, can be applied by widely.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204662975UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204662975UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204662975UU3</originalsourceid><addsrcrecordid>eNrjZHAOyUgsUUhOzFMoSCwuVijJKMovTc9QKE7NzVTQTc8sSkktUigpKgVKlSfmZBcrpJdmpiTmJacqlCQWpCqkpJZlJqfyMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jAxMzMyNLc9PQUGOiFAEAqlwy4A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>That can pass through semi -girder truss walks guidance tape device</title><source>esp@cenet</source><creator>ZHENG CHENGHONG ; TANG BIBO ; LI JIAHONG ; LIU BO ; CHEN JIANGWEI ; CHEN LI ; ZHAO FEI ; TANG XINYUAN ; WANG ZHEN ; WEI CHENKANG</creator><creatorcontrib>ZHENG CHENGHONG ; TANG BIBO ; LI JIAHONG ; LIU BO ; CHEN JIANGWEI ; CHEN LI ; ZHAO FEI ; TANG XINYUAN ; WANG ZHEN ; WEI CHENKANG</creatorcontrib><description>The utility model relates to a that can pass through semi -girder truss walks guidance tape device includes mainly that two ledger boards, two turn over board, hinge, bolt, two hinges, its characterized in that: every ledger board turns over the board with the lot and passes through hinge connection to use the bolt fastening, every ledger board edge adopts other hinge and top mould pylon fossil fragments to be connected, and a hinge is respectively connected in two outsides of turning over the board, and the other end of every hinge is fixed on a mould pylon fossil fragments. The utility model discloses but the ledger board of wide application in a mould stores pylon is assembled to the solution is when running into a core section of thick bamboo and have member such as semi -girder truss need pass through a mould stores pylon, and top mould stores pylon is walked the guidance tape and can be dodged the member through opening, and then reduces top mould stores pylon tearing down and reconstructing in the use. The utility model provides an unable construction when meetting the component that need pass through it of top mould stores pylon system, need tear down and reconstruct the problem of stores pylon system, this method is easy and simple to handle, practical, can be applied by widely.</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150923&amp;DB=EPODOC&amp;CC=CN&amp;NR=204662975U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150923&amp;DB=EPODOC&amp;CC=CN&amp;NR=204662975U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG CHENGHONG</creatorcontrib><creatorcontrib>TANG BIBO</creatorcontrib><creatorcontrib>LI JIAHONG</creatorcontrib><creatorcontrib>LIU BO</creatorcontrib><creatorcontrib>CHEN JIANGWEI</creatorcontrib><creatorcontrib>CHEN LI</creatorcontrib><creatorcontrib>ZHAO FEI</creatorcontrib><creatorcontrib>TANG XINYUAN</creatorcontrib><creatorcontrib>WANG ZHEN</creatorcontrib><creatorcontrib>WEI CHENKANG</creatorcontrib><title>That can pass through semi -girder truss walks guidance tape device</title><description>The utility model relates to a that can pass through semi -girder truss walks guidance tape device includes mainly that two ledger boards, two turn over board, hinge, bolt, two hinges, its characterized in that: every ledger board turns over the board with the lot and passes through hinge connection to use the bolt fastening, every ledger board edge adopts other hinge and top mould pylon fossil fragments to be connected, and a hinge is respectively connected in two outsides of turning over the board, and the other end of every hinge is fixed on a mould pylon fossil fragments. The utility model discloses but the ledger board of wide application in a mould stores pylon is assembled to the solution is when running into a core section of thick bamboo and have member such as semi -girder truss need pass through a mould stores pylon, and top mould stores pylon is walked the guidance tape and can be dodged the member through opening, and then reduces top mould stores pylon tearing down and reconstructing in the use. The utility model provides an unable construction when meetting the component that need pass through it of top mould stores pylon system, need tear down and reconstruct the problem of stores pylon system, this method is easy and simple to handle, practical, can be applied by widely.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAOyUgsUUhOzFMoSCwuVijJKMovTc9QKE7NzVTQTc8sSkktUigpKgVKlSfmZBcrpJdmpiTmJacqlCQWpCqkpJZlJqfyMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jAxMzMyNLc9PQUGOiFAEAqlwy4A</recordid><startdate>20150923</startdate><enddate>20150923</enddate><creator>ZHENG CHENGHONG</creator><creator>TANG BIBO</creator><creator>LI JIAHONG</creator><creator>LIU BO</creator><creator>CHEN JIANGWEI</creator><creator>CHEN LI</creator><creator>ZHAO FEI</creator><creator>TANG XINYUAN</creator><creator>WANG ZHEN</creator><creator>WEI CHENKANG</creator><scope>EVB</scope></search><sort><creationdate>20150923</creationdate><title>That can pass through semi -girder truss walks guidance tape device</title><author>ZHENG CHENGHONG ; TANG BIBO ; LI JIAHONG ; LIU BO ; CHEN JIANGWEI ; CHEN LI ; ZHAO FEI ; TANG XINYUAN ; WANG ZHEN ; WEI CHENKANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204662975UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG CHENGHONG</creatorcontrib><creatorcontrib>TANG BIBO</creatorcontrib><creatorcontrib>LI JIAHONG</creatorcontrib><creatorcontrib>LIU BO</creatorcontrib><creatorcontrib>CHEN JIANGWEI</creatorcontrib><creatorcontrib>CHEN LI</creatorcontrib><creatorcontrib>ZHAO FEI</creatorcontrib><creatorcontrib>TANG XINYUAN</creatorcontrib><creatorcontrib>WANG ZHEN</creatorcontrib><creatorcontrib>WEI CHENKANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG CHENGHONG</au><au>TANG BIBO</au><au>LI JIAHONG</au><au>LIU BO</au><au>CHEN JIANGWEI</au><au>CHEN LI</au><au>ZHAO FEI</au><au>TANG XINYUAN</au><au>WANG ZHEN</au><au>WEI CHENKANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>That can pass through semi -girder truss walks guidance tape device</title><date>2015-09-23</date><risdate>2015</risdate><abstract>The utility model relates to a that can pass through semi -girder truss walks guidance tape device includes mainly that two ledger boards, two turn over board, hinge, bolt, two hinges, its characterized in that: every ledger board turns over the board with the lot and passes through hinge connection to use the bolt fastening, every ledger board edge adopts other hinge and top mould pylon fossil fragments to be connected, and a hinge is respectively connected in two outsides of turning over the board, and the other end of every hinge is fixed on a mould pylon fossil fragments. The utility model discloses but the ledger board of wide application in a mould stores pylon is assembled to the solution is when running into a core section of thick bamboo and have member such as semi -girder truss need pass through a mould stores pylon, and top mould stores pylon is walked the guidance tape and can be dodged the member through opening, and then reduces top mould stores pylon tearing down and reconstructing in the use. The utility model provides an unable construction when meetting the component that need pass through it of top mould stores pylon system, need tear down and reconstruct the problem of stores pylon system, this method is easy and simple to handle, practical, can be applied by widely.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204662975UU
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
title That can pass through semi -girder truss walks guidance tape device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T04%3A04%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20CHENGHONG&rft.date=2015-09-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204662975UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true