High pier binder template is set up and is used support

The utility model belongs to the technical field of the construction of high pier binder, for solving the technical problem that high pier binder template was set up, provide a high pier binder template is set up and is used support, including a plurality of longerons, the both ends of every longero...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI AOLONG, QIN DEJIN, LIU XIAODONG, SUN ZHONGHUA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model belongs to the technical field of the construction of high pier binder, for solving the technical problem that high pier binder template was set up, provide a high pier binder template is set up and is used support, including a plurality of longerons, the both ends of every longeron all are located on setting up the support beam on many rod irons, and a plurality of longeron interval arrangements are on the support beam, and the rod iron is inserted and is established at pre-buried PVC in high pier intraductally, is provided with the dismantlement between rod iron and the support beam and to wedge I, has set up a plurality of crossbeams on the longeron perpendicularly, is provided with the dismantlement between longeron and the crossbeam and to wedge II, lays the plank sheathing on the crossbeam. The utility model discloses a pre-buried PVC pipe in high pier sets up the template in the intraductal rod iron method of inserting of PVC as the strong point, has improved the security and the efficiency of construction of construction, solved pre-buried steel sheet or I-steel use back cutting in the past simultaneously, the cutting plane is handled, and the cutting plane easily receives the problem of corruption, adopt to dismantle and dismantle the adjustable template height of wedge and the template of being convenient for.