Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater

The utility model relates to an excavation supporting field specifically is an abundant and the bad dark pit excavation supporting construction of geology of groundwater, and solve current building pit construction and exist and strut that the effect is unsatisfactory, the bulk strength is poor, con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LU JUN, CAI TING, XU YE, ZHANG HONG, YANG HUAQIANG, ZHANG XUGUANG, ZHANG GUOLONG, ZHAO LIXIAN, LIANG WANGTONG, NIE KEFEI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LU JUN
CAI TING
XU YE
ZHANG HONG
YANG HUAQIANG
ZHANG XUGUANG
ZHANG GUOLONG
ZHAO LIXIAN
LIANG WANGTONG
NIE KEFEI
description The utility model relates to an excavation supporting field specifically is an abundant and the bad dark pit excavation supporting construction of geology of groundwater, and solve current building pit construction and exist and strut that the effect is unsatisfactory, the bulk strength is poor, construction period is long, the high costs scheduling problem, including the precipitation well laid along foundation ditch outside interval suitable for reading, the lasson steel board pole in the excavation supporting stake limit outside in the interval excavation supporting stake and the interval of laying all around along the foundation ditch end opening, be equipped with the I-steel crossbeam between excavation supporting stake and the lasson steel board pole, the locating hole is offered to each excavation supporting stake side, and the spacer bar is established in the locating hole interpolation, and I-steel crossbeam level is set up on the spacer bar, lasson steel board pole and the outside welding of I-steel crossbeam, dark building pit construction's security had both been guaranteed to the combined supporting system that adopts well-points dewatering, lasson steel board pole and excavation supporting stake to form, also guaranteed the time limit for a project, again greatly reduced construction cost, produced good economic benefits and social.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204510230UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204510230UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204510230UU3</originalsourceid><addsrcrecordid>eNqNjM0KwjAQhHvxIOo7LN6F2uoDSFE8ebLnsk22MVB2Q7Lx5-0txQfwNMN8M7Ms7KnPbJEVkC3og6BHC5YoTCbhCMEryDATRzKK-wC9DT5RvTCkHIJE9ezACCeN2cz5tHBRpucXKsV1sRhwTLT56arYXs735rqjIB2lgIaYtGtuVXk47suqLtu2_qv0BUg-P8I</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater</title><source>esp@cenet</source><creator>LU JUN ; CAI TING ; XU YE ; ZHANG HONG ; YANG HUAQIANG ; ZHANG XUGUANG ; ZHANG GUOLONG ; ZHAO LIXIAN ; LIANG WANGTONG ; NIE KEFEI</creator><creatorcontrib>LU JUN ; CAI TING ; XU YE ; ZHANG HONG ; YANG HUAQIANG ; ZHANG XUGUANG ; ZHANG GUOLONG ; ZHAO LIXIAN ; LIANG WANGTONG ; NIE KEFEI</creatorcontrib><description>The utility model relates to an excavation supporting field specifically is an abundant and the bad dark pit excavation supporting construction of geology of groundwater, and solve current building pit construction and exist and strut that the effect is unsatisfactory, the bulk strength is poor, construction period is long, the high costs scheduling problem, including the precipitation well laid along foundation ditch outside interval suitable for reading, the lasson steel board pole in the excavation supporting stake limit outside in the interval excavation supporting stake and the interval of laying all around along the foundation ditch end opening, be equipped with the I-steel crossbeam between excavation supporting stake and the lasson steel board pole, the locating hole is offered to each excavation supporting stake side, and the spacer bar is established in the locating hole interpolation, and I-steel crossbeam level is set up on the spacer bar, lasson steel board pole and the outside welding of I-steel crossbeam, dark building pit construction's security had both been guaranteed to the combined supporting system that adopts well-points dewatering, lasson steel board pole and excavation supporting stake to form, also guaranteed the time limit for a project, again greatly reduced construction cost, produced good economic benefits and social.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150729&amp;DB=EPODOC&amp;CC=CN&amp;NR=204510230U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150729&amp;DB=EPODOC&amp;CC=CN&amp;NR=204510230U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LU JUN</creatorcontrib><creatorcontrib>CAI TING</creatorcontrib><creatorcontrib>XU YE</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YANG HUAQIANG</creatorcontrib><creatorcontrib>ZHANG XUGUANG</creatorcontrib><creatorcontrib>ZHANG GUOLONG</creatorcontrib><creatorcontrib>ZHAO LIXIAN</creatorcontrib><creatorcontrib>LIANG WANGTONG</creatorcontrib><creatorcontrib>NIE KEFEI</creatorcontrib><title>Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater</title><description>The utility model relates to an excavation supporting field specifically is an abundant and the bad dark pit excavation supporting construction of geology of groundwater, and solve current building pit construction and exist and strut that the effect is unsatisfactory, the bulk strength is poor, construction period is long, the high costs scheduling problem, including the precipitation well laid along foundation ditch outside interval suitable for reading, the lasson steel board pole in the excavation supporting stake limit outside in the interval excavation supporting stake and the interval of laying all around along the foundation ditch end opening, be equipped with the I-steel crossbeam between excavation supporting stake and the lasson steel board pole, the locating hole is offered to each excavation supporting stake side, and the spacer bar is established in the locating hole interpolation, and I-steel crossbeam level is set up on the spacer bar, lasson steel board pole and the outside welding of I-steel crossbeam, dark building pit construction's security had both been guaranteed to the combined supporting system that adopts well-points dewatering, lasson steel board pole and excavation supporting stake to form, also guaranteed the time limit for a project, again greatly reduced construction cost, produced good economic benefits and social.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjM0KwjAQhHvxIOo7LN6F2uoDSFE8ebLnsk22MVB2Q7Lx5-0txQfwNMN8M7Ms7KnPbJEVkC3og6BHC5YoTCbhCMEryDATRzKK-wC9DT5RvTCkHIJE9ezACCeN2cz5tHBRpucXKsV1sRhwTLT56arYXs735rqjIB2lgIaYtGtuVXk47suqLtu2_qv0BUg-P8I</recordid><startdate>20150729</startdate><enddate>20150729</enddate><creator>LU JUN</creator><creator>CAI TING</creator><creator>XU YE</creator><creator>ZHANG HONG</creator><creator>YANG HUAQIANG</creator><creator>ZHANG XUGUANG</creator><creator>ZHANG GUOLONG</creator><creator>ZHAO LIXIAN</creator><creator>LIANG WANGTONG</creator><creator>NIE KEFEI</creator><scope>EVB</scope></search><sort><creationdate>20150729</creationdate><title>Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater</title><author>LU JUN ; CAI TING ; XU YE ; ZHANG HONG ; YANG HUAQIANG ; ZHANG XUGUANG ; ZHANG GUOLONG ; ZHAO LIXIAN ; LIANG WANGTONG ; NIE KEFEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204510230UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LU JUN</creatorcontrib><creatorcontrib>CAI TING</creatorcontrib><creatorcontrib>XU YE</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>YANG HUAQIANG</creatorcontrib><creatorcontrib>ZHANG XUGUANG</creatorcontrib><creatorcontrib>ZHANG GUOLONG</creatorcontrib><creatorcontrib>ZHAO LIXIAN</creatorcontrib><creatorcontrib>LIANG WANGTONG</creatorcontrib><creatorcontrib>NIE KEFEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LU JUN</au><au>CAI TING</au><au>XU YE</au><au>ZHANG HONG</au><au>YANG HUAQIANG</au><au>ZHANG XUGUANG</au><au>ZHANG GUOLONG</au><au>ZHAO LIXIAN</au><au>LIANG WANGTONG</au><au>NIE KEFEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater</title><date>2015-07-29</date><risdate>2015</risdate><abstract>The utility model relates to an excavation supporting field specifically is an abundant and the bad dark pit excavation supporting construction of geology of groundwater, and solve current building pit construction and exist and strut that the effect is unsatisfactory, the bulk strength is poor, construction period is long, the high costs scheduling problem, including the precipitation well laid along foundation ditch outside interval suitable for reading, the lasson steel board pole in the excavation supporting stake limit outside in the interval excavation supporting stake and the interval of laying all around along the foundation ditch end opening, be equipped with the I-steel crossbeam between excavation supporting stake and the lasson steel board pole, the locating hole is offered to each excavation supporting stake side, and the spacer bar is established in the locating hole interpolation, and I-steel crossbeam level is set up on the spacer bar, lasson steel board pole and the outside welding of I-steel crossbeam, dark building pit construction's security had both been guaranteed to the combined supporting system that adopts well-points dewatering, lasson steel board pole and excavation supporting stake to form, also guaranteed the time limit for a project, again greatly reduced construction cost, produced good economic benefits and social.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204510230UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Abundant and the bad deep basal pit of the geology excavation supporting construction of groundwater
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T10%3A18%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LU%20JUN&rft.date=2015-07-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204510230UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true