Control cable insulation test auxiliary box

The utility model relates to a control cable insulation test auxiliary box, and belongs to the control cable insulation test equipment field; the technical scheme is that a 500V tramegger L-pole wiring end (20) is arranged between a 500V tramegger L-pole and a test operation zone (18), and the three...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: XU CHENJUN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XU CHENJUN
description The utility model relates to a control cable insulation test auxiliary box, and belongs to the control cable insulation test equipment field; the technical scheme is that a 500V tramegger L-pole wiring end (20) is arranged between a 500V tramegger L-pole and a test operation zone (18), and the three are mutally connected; a 500V tramegger E-pole wiring end (21) is arranged between a 500V tramegger E-pole and an insulation troubleshooting zone (19), and the three are mutally connected; a ground terminal (22) is connected with the ground; a ground end single-control switch is arranged between the 500V tramegger E-pole wiring end and the ground terminal; a to-be-tested control cable wire core wiring zone, the test operation zone and the insulation troubleshooting zone are connected in sequence; to-be tested wire cores are matched one by one in positions with a pluggable spring terminal, a dual-control switch and a single-control switch. The auxiliary box is matched with the 500V digit tramegger, so whole testing project can be operated by one person, thus reducing work load, improving work efficiency, and removing electric shock hidden troubles in insulation remote tests of the control cable wire cores.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204359903UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204359903UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204359903UU3</originalsourceid><addsrcrecordid>eNrjZNB2zs8rKcrPUUhOTMpJVcjMKy7NSSzJzM9TKEktLlFILK3IzMlMLKpUSMqv4GFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RgYmxqaWlgbGoaHGRCkCANr-Kos</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Control cable insulation test auxiliary box</title><source>esp@cenet</source><creator>XU CHENJUN</creator><creatorcontrib>XU CHENJUN</creatorcontrib><description>The utility model relates to a control cable insulation test auxiliary box, and belongs to the control cable insulation test equipment field; the technical scheme is that a 500V tramegger L-pole wiring end (20) is arranged between a 500V tramegger L-pole and a test operation zone (18), and the three are mutally connected; a 500V tramegger E-pole wiring end (21) is arranged between a 500V tramegger E-pole and an insulation troubleshooting zone (19), and the three are mutally connected; a ground terminal (22) is connected with the ground; a ground end single-control switch is arranged between the 500V tramegger E-pole wiring end and the ground terminal; a to-be-tested control cable wire core wiring zone, the test operation zone and the insulation troubleshooting zone are connected in sequence; to-be tested wire cores are matched one by one in positions with a pluggable spring terminal, a dual-control switch and a single-control switch. The auxiliary box is matched with the 500V digit tramegger, so whole testing project can be operated by one person, thus reducing work load, improving work efficiency, and removing electric shock hidden troubles in insulation remote tests of the control cable wire cores.</description><language>eng</language><subject>MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; TESTING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150527&amp;DB=EPODOC&amp;CC=CN&amp;NR=204359903U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76517</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150527&amp;DB=EPODOC&amp;CC=CN&amp;NR=204359903U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XU CHENJUN</creatorcontrib><title>Control cable insulation test auxiliary box</title><description>The utility model relates to a control cable insulation test auxiliary box, and belongs to the control cable insulation test equipment field; the technical scheme is that a 500V tramegger L-pole wiring end (20) is arranged between a 500V tramegger L-pole and a test operation zone (18), and the three are mutally connected; a 500V tramegger E-pole wiring end (21) is arranged between a 500V tramegger E-pole and an insulation troubleshooting zone (19), and the three are mutally connected; a ground terminal (22) is connected with the ground; a ground end single-control switch is arranged between the 500V tramegger E-pole wiring end and the ground terminal; a to-be-tested control cable wire core wiring zone, the test operation zone and the insulation troubleshooting zone are connected in sequence; to-be tested wire cores are matched one by one in positions with a pluggable spring terminal, a dual-control switch and a single-control switch. The auxiliary box is matched with the 500V digit tramegger, so whole testing project can be operated by one person, thus reducing work load, improving work efficiency, and removing electric shock hidden troubles in insulation remote tests of the control cable wire cores.</description><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB2zs8rKcrPUUhOTMpJVcjMKy7NSSzJzM9TKEktLlFILK3IzMlMLKpUSMqv4GFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RgYmxqaWlgbGoaHGRCkCANr-Kos</recordid><startdate>20150527</startdate><enddate>20150527</enddate><creator>XU CHENJUN</creator><scope>EVB</scope></search><sort><creationdate>20150527</creationdate><title>Control cable insulation test auxiliary box</title><author>XU CHENJUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204359903UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>XU CHENJUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XU CHENJUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Control cable insulation test auxiliary box</title><date>2015-05-27</date><risdate>2015</risdate><abstract>The utility model relates to a control cable insulation test auxiliary box, and belongs to the control cable insulation test equipment field; the technical scheme is that a 500V tramegger L-pole wiring end (20) is arranged between a 500V tramegger L-pole and a test operation zone (18), and the three are mutally connected; a 500V tramegger E-pole wiring end (21) is arranged between a 500V tramegger E-pole and an insulation troubleshooting zone (19), and the three are mutally connected; a ground terminal (22) is connected with the ground; a ground end single-control switch is arranged between the 500V tramegger E-pole wiring end and the ground terminal; a to-be-tested control cable wire core wiring zone, the test operation zone and the insulation troubleshooting zone are connected in sequence; to-be tested wire cores are matched one by one in positions with a pluggable spring terminal, a dual-control switch and a single-control switch. The auxiliary box is matched with the 500V digit tramegger, so whole testing project can be operated by one person, thus reducing work load, improving work efficiency, and removing electric shock hidden troubles in insulation remote tests of the control cable wire cores.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204359903UU
source esp@cenet
subjects MEASURING
MEASURING ELECTRIC VARIABLES
MEASURING MAGNETIC VARIABLES
PHYSICS
TESTING
title Control cable insulation test auxiliary box
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T07%3A22%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XU%20CHENJUN&rft.date=2015-05-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204359903UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true