Building construction hanging basket

Disclosed is a building construction hanging basket. The building construction hanging basket comprises a triangular truss bearing mechanism; the triangular truss bearing mechanism is provided with two main longitudinal beams, which are formed by fixedly connecting two channel steels in a back-to-ba...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DONG YUWEI, CHEN ZHENHONG, SUN MENG, HU JINGXIU, WANG PENG, WANG SIHU, LYU BAOHUA, LEI LEI, LIU YAKUN, DAI JIANG, GUO HUA, CHENG XIANG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DONG YUWEI
CHEN ZHENHONG
SUN MENG
HU JINGXIU
WANG PENG
WANG SIHU
LYU BAOHUA
LEI LEI
LIU YAKUN
DAI JIANG
GUO HUA
CHENG XIANG
description Disclosed is a building construction hanging basket. The building construction hanging basket comprises a triangular truss bearing mechanism; the triangular truss bearing mechanism is provided with two main longitudinal beams, which are formed by fixedly connecting two channel steels in a back-to-back mode; the rear ends of two main rear beams are respectively welded with a rear support leg; the lower ends of the rear support legs are welded to rear counter-force hooks through a horizontal connecting plate; the rear counter-force hooks are arranged on a walking rail; a groove steel plate is arranged between the main longitudinal beams and the rear counter-force hooks, and one side of the groove steel plate is provided with two open grooves in parallel; each open groove is welded with one winged edge of the channel steel of the corresponding main longitudinal beam and one side of the horizontal connecting plate in a matched mode. The building construction hanging basket change stress on welding steams into stress on a steel structure during walking and avoids influence on a walking process; the connecting firmness of the building construction hanging basket is far higher than that of simple welding seam connection, so that the walking difficulty and the walking time of the hanging basket can be reduced, and further security can be ensured. Besides, the building construction hanging basket is low in cost and easy to implement.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN204212069UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN204212069UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN204212069UU3</originalsourceid><addsrcrecordid>eNrjZFBxKs3MScnMS1dIzs8rLikqTS7JzM9TyEjMSwcJJiUWZ6eW8DCwpiXmFKfyQmluBiU31xBnD93Ugvz41OKCxOTUvNSSeGc_IwMTI0MjAzPL0FBjohQBAIakJ-I</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Building construction hanging basket</title><source>esp@cenet</source><creator>DONG YUWEI ; CHEN ZHENHONG ; SUN MENG ; HU JINGXIU ; WANG PENG ; WANG SIHU ; LYU BAOHUA ; LEI LEI ; LIU YAKUN ; DAI JIANG ; GUO HUA ; CHENG XIANG</creator><creatorcontrib>DONG YUWEI ; CHEN ZHENHONG ; SUN MENG ; HU JINGXIU ; WANG PENG ; WANG SIHU ; LYU BAOHUA ; LEI LEI ; LIU YAKUN ; DAI JIANG ; GUO HUA ; CHENG XIANG</creatorcontrib><description>Disclosed is a building construction hanging basket. The building construction hanging basket comprises a triangular truss bearing mechanism; the triangular truss bearing mechanism is provided with two main longitudinal beams, which are formed by fixedly connecting two channel steels in a back-to-back mode; the rear ends of two main rear beams are respectively welded with a rear support leg; the lower ends of the rear support legs are welded to rear counter-force hooks through a horizontal connecting plate; the rear counter-force hooks are arranged on a walking rail; a groove steel plate is arranged between the main longitudinal beams and the rear counter-force hooks, and one side of the groove steel plate is provided with two open grooves in parallel; each open groove is welded with one winged edge of the channel steel of the corresponding main longitudinal beam and one side of the horizontal connecting plate in a matched mode. The building construction hanging basket change stress on welding steams into stress on a steel structure during walking and avoids influence on a walking process; the connecting firmness of the building construction hanging basket is far higher than that of simple welding seam connection, so that the walking difficulty and the walking time of the hanging basket can be reduced, and further security can be ensured. Besides, the building construction hanging basket is low in cost and easy to implement.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150318&amp;DB=EPODOC&amp;CC=CN&amp;NR=204212069U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150318&amp;DB=EPODOC&amp;CC=CN&amp;NR=204212069U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DONG YUWEI</creatorcontrib><creatorcontrib>CHEN ZHENHONG</creatorcontrib><creatorcontrib>SUN MENG</creatorcontrib><creatorcontrib>HU JINGXIU</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>WANG SIHU</creatorcontrib><creatorcontrib>LYU BAOHUA</creatorcontrib><creatorcontrib>LEI LEI</creatorcontrib><creatorcontrib>LIU YAKUN</creatorcontrib><creatorcontrib>DAI JIANG</creatorcontrib><creatorcontrib>GUO HUA</creatorcontrib><creatorcontrib>CHENG XIANG</creatorcontrib><title>Building construction hanging basket</title><description>Disclosed is a building construction hanging basket. The building construction hanging basket comprises a triangular truss bearing mechanism; the triangular truss bearing mechanism is provided with two main longitudinal beams, which are formed by fixedly connecting two channel steels in a back-to-back mode; the rear ends of two main rear beams are respectively welded with a rear support leg; the lower ends of the rear support legs are welded to rear counter-force hooks through a horizontal connecting plate; the rear counter-force hooks are arranged on a walking rail; a groove steel plate is arranged between the main longitudinal beams and the rear counter-force hooks, and one side of the groove steel plate is provided with two open grooves in parallel; each open groove is welded with one winged edge of the channel steel of the corresponding main longitudinal beam and one side of the horizontal connecting plate in a matched mode. The building construction hanging basket change stress on welding steams into stress on a steel structure during walking and avoids influence on a walking process; the connecting firmness of the building construction hanging basket is far higher than that of simple welding seam connection, so that the walking difficulty and the walking time of the hanging basket can be reduced, and further security can be ensured. Besides, the building construction hanging basket is low in cost and easy to implement.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBxKs3MScnMS1dIzs8rLikqTS7JzM9TyEjMSwcJJiUWZ6eW8DCwpiXmFKfyQmluBiU31xBnD93Ugvz41OKCxOTUvNSSeGc_IwMTI0MjAzPL0FBjohQBAIakJ-I</recordid><startdate>20150318</startdate><enddate>20150318</enddate><creator>DONG YUWEI</creator><creator>CHEN ZHENHONG</creator><creator>SUN MENG</creator><creator>HU JINGXIU</creator><creator>WANG PENG</creator><creator>WANG SIHU</creator><creator>LYU BAOHUA</creator><creator>LEI LEI</creator><creator>LIU YAKUN</creator><creator>DAI JIANG</creator><creator>GUO HUA</creator><creator>CHENG XIANG</creator><scope>EVB</scope></search><sort><creationdate>20150318</creationdate><title>Building construction hanging basket</title><author>DONG YUWEI ; CHEN ZHENHONG ; SUN MENG ; HU JINGXIU ; WANG PENG ; WANG SIHU ; LYU BAOHUA ; LEI LEI ; LIU YAKUN ; DAI JIANG ; GUO HUA ; CHENG XIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN204212069UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>DONG YUWEI</creatorcontrib><creatorcontrib>CHEN ZHENHONG</creatorcontrib><creatorcontrib>SUN MENG</creatorcontrib><creatorcontrib>HU JINGXIU</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>WANG SIHU</creatorcontrib><creatorcontrib>LYU BAOHUA</creatorcontrib><creatorcontrib>LEI LEI</creatorcontrib><creatorcontrib>LIU YAKUN</creatorcontrib><creatorcontrib>DAI JIANG</creatorcontrib><creatorcontrib>GUO HUA</creatorcontrib><creatorcontrib>CHENG XIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DONG YUWEI</au><au>CHEN ZHENHONG</au><au>SUN MENG</au><au>HU JINGXIU</au><au>WANG PENG</au><au>WANG SIHU</au><au>LYU BAOHUA</au><au>LEI LEI</au><au>LIU YAKUN</au><au>DAI JIANG</au><au>GUO HUA</au><au>CHENG XIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Building construction hanging basket</title><date>2015-03-18</date><risdate>2015</risdate><abstract>Disclosed is a building construction hanging basket. The building construction hanging basket comprises a triangular truss bearing mechanism; the triangular truss bearing mechanism is provided with two main longitudinal beams, which are formed by fixedly connecting two channel steels in a back-to-back mode; the rear ends of two main rear beams are respectively welded with a rear support leg; the lower ends of the rear support legs are welded to rear counter-force hooks through a horizontal connecting plate; the rear counter-force hooks are arranged on a walking rail; a groove steel plate is arranged between the main longitudinal beams and the rear counter-force hooks, and one side of the groove steel plate is provided with two open grooves in parallel; each open groove is welded with one winged edge of the channel steel of the corresponding main longitudinal beam and one side of the horizontal connecting plate in a matched mode. The building construction hanging basket change stress on welding steams into stress on a steel structure during walking and avoids influence on a walking process; the connecting firmness of the building construction hanging basket is far higher than that of simple welding seam connection, so that the walking difficulty and the walking time of the hanging basket can be reduced, and further security can be ensured. Besides, the building construction hanging basket is low in cost and easy to implement.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN204212069UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Building construction hanging basket
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T19%3A59%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DONG%20YUWEI&rft.date=2015-03-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN204212069UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true