Split combination large steel formwork
The utility model provides a split combination large steel formwork. The split combination large steel formwork comprises an upper split formwork and a lower split formwork which is arranged below the upper split formwork. The upper split formwork is installed in place through a limiting supporting...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FENG LI'NA BAO KAIEN MENG FANKAI MA YANJUN WANG JIANSHENG LI JIAWEI SUN TAOQUAN |
description | The utility model provides a split combination large steel formwork. The split combination large steel formwork comprises an upper split formwork and a lower split formwork which is arranged below the upper split formwork. The upper split formwork is installed in place through a limiting supporting device of the lower split formwork. The lower split formwork is provided with a lateral limiting device, which facilitates one-time place taking of the formwork. Relative displacement of the formworks is little and thus, the flatness of a concrete face is ensured and the assembling speed is improved. According to the split combination large steel formwork, the upper split formwork and the lower split formwork are used for arranging shearing wall formworks of all layers in an erected mode. The split combination large steel formwork has the advantages of being high in turnaround utilization rate, high in assembling speed and good in integrality of pouring concrete. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN203361628UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN203361628UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN203361628UU3</originalsourceid><addsrcrecordid>eNrjZFALLsjJLFFIzs9NysxLLMnMz1PISSxKT1UoLklNzVFIyy_KLc8vyuZhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGxsZmhmZGFqGhxkQpAgDevSid</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Split combination large steel formwork</title><source>esp@cenet</source><creator>FENG LI'NA ; BAO KAIEN ; MENG FANKAI ; MA YANJUN ; WANG JIANSHENG ; LI JIAWEI ; SUN TAOQUAN</creator><creatorcontrib>FENG LI'NA ; BAO KAIEN ; MENG FANKAI ; MA YANJUN ; WANG JIANSHENG ; LI JIAWEI ; SUN TAOQUAN</creatorcontrib><description>The utility model provides a split combination large steel formwork. The split combination large steel formwork comprises an upper split formwork and a lower split formwork which is arranged below the upper split formwork. The upper split formwork is installed in place through a limiting supporting device of the lower split formwork. The lower split formwork is provided with a lateral limiting device, which facilitates one-time place taking of the formwork. Relative displacement of the formworks is little and thus, the flatness of a concrete face is ensured and the assembling speed is improved. According to the split combination large steel formwork, the upper split formwork and the lower split formwork are used for arranging shearing wall formworks of all layers in an erected mode. The split combination large steel formwork has the advantages of being high in turnaround utilization rate, high in assembling speed and good in integrality of pouring concrete.</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20131225&DB=EPODOC&CC=CN&NR=203361628U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20131225&DB=EPODOC&CC=CN&NR=203361628U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FENG LI'NA</creatorcontrib><creatorcontrib>BAO KAIEN</creatorcontrib><creatorcontrib>MENG FANKAI</creatorcontrib><creatorcontrib>MA YANJUN</creatorcontrib><creatorcontrib>WANG JIANSHENG</creatorcontrib><creatorcontrib>LI JIAWEI</creatorcontrib><creatorcontrib>SUN TAOQUAN</creatorcontrib><title>Split combination large steel formwork</title><description>The utility model provides a split combination large steel formwork. The split combination large steel formwork comprises an upper split formwork and a lower split formwork which is arranged below the upper split formwork. The upper split formwork is installed in place through a limiting supporting device of the lower split formwork. The lower split formwork is provided with a lateral limiting device, which facilitates one-time place taking of the formwork. Relative displacement of the formworks is little and thus, the flatness of a concrete face is ensured and the assembling speed is improved. According to the split combination large steel formwork, the upper split formwork and the lower split formwork are used for arranging shearing wall formworks of all layers in an erected mode. The split combination large steel formwork has the advantages of being high in turnaround utilization rate, high in assembling speed and good in integrality of pouring concrete.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFALLsjJLFFIzs9NysxLLMnMz1PISSxKT1UoLklNzVFIyy_KLc8vyuZhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkYGxsZmhmZGFqGhxkQpAgDevSid</recordid><startdate>20131225</startdate><enddate>20131225</enddate><creator>FENG LI'NA</creator><creator>BAO KAIEN</creator><creator>MENG FANKAI</creator><creator>MA YANJUN</creator><creator>WANG JIANSHENG</creator><creator>LI JIAWEI</creator><creator>SUN TAOQUAN</creator><scope>EVB</scope></search><sort><creationdate>20131225</creationdate><title>Split combination large steel formwork</title><author>FENG LI'NA ; BAO KAIEN ; MENG FANKAI ; MA YANJUN ; WANG JIANSHENG ; LI JIAWEI ; SUN TAOQUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN203361628UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2013</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>FENG LI'NA</creatorcontrib><creatorcontrib>BAO KAIEN</creatorcontrib><creatorcontrib>MENG FANKAI</creatorcontrib><creatorcontrib>MA YANJUN</creatorcontrib><creatorcontrib>WANG JIANSHENG</creatorcontrib><creatorcontrib>LI JIAWEI</creatorcontrib><creatorcontrib>SUN TAOQUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FENG LI'NA</au><au>BAO KAIEN</au><au>MENG FANKAI</au><au>MA YANJUN</au><au>WANG JIANSHENG</au><au>LI JIAWEI</au><au>SUN TAOQUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Split combination large steel formwork</title><date>2013-12-25</date><risdate>2013</risdate><abstract>The utility model provides a split combination large steel formwork. The split combination large steel formwork comprises an upper split formwork and a lower split formwork which is arranged below the upper split formwork. The upper split formwork is installed in place through a limiting supporting device of the lower split formwork. The lower split formwork is provided with a lateral limiting device, which facilitates one-time place taking of the formwork. Relative displacement of the formworks is little and thus, the flatness of a concrete face is ensured and the assembling speed is improved. According to the split combination large steel formwork, the upper split formwork and the lower split formwork are used for arranging shearing wall formworks of all layers in an erected mode. The split combination large steel formwork has the advantages of being high in turnaround utilization rate, high in assembling speed and good in integrality of pouring concrete.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN203361628UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Split combination large steel formwork |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T00%3A42%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FENG%20LI'NA&rft.date=2013-12-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN203361628UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |