Device for concrete surrounding of main arch by using hanging method

The utility model relates to a device for the concrete surrounding of a main arch by using a hanging method, and the device can be used for greatly increasing the construction efficiency of the concrete surrounding of the main arch and effectively improving the construction safety. The device compri...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG XIAOJING, SHEN HAIKUN, HUANG PING, LUO HONG, FU CHANGJIANG, JIANG DAILIN, PENG TONGZHOU, LONG WEI, DENG HENGCHANG, CHEN BO, DAI ZHEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG XIAOJING
SHEN HAIKUN
HUANG PING
LUO HONG
FU CHANGJIANG
JIANG DAILIN
PENG TONGZHOU
LONG WEI
DENG HENGCHANG
CHEN BO
DAI ZHEN
description The utility model relates to a device for the concrete surrounding of a main arch by using a hanging method, and the device can be used for greatly increasing the construction efficiency of the concrete surrounding of the main arch and effectively improving the construction safety. The device comprises an arch-back flat wagon (20), a driving device, hanging rods (21), construction platforms (31), upper platforms (43) and a jacking device, wherein the arch-back flat wagon (20) is arranged on a stiffening framework (10), roller groups (23) of the arch-back flat wagon (20) correspond to upper chord pipes (11), the hanging rods (21) are arranged at the outer sides of the upper chord pipes (11) in groups, the upper ends of the hanging rods (21) are connected with the arch-back flat wagon (20), the lower ends of the hanging rods (21) are connected with the construction platforms (31) which are located below the stiffening framework (10), bottom molding boards (40) are fixedly arranged on the upper platforms (43), o
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN202626841UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN202626841UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN202626841UU3</originalsourceid><addsrcrecordid>eNrjZHBxSS3LTE5VSMsvUkjOz0suSi1JVSguLSrKL81LycxLV8hPU8hNzMxTSCxKzlBIqlQoLQaJZiTmpYPo3NSSjPwUHgbWtMSc4lReKM3NoOTmGuLsoZtakB-fWlyQmJyal1oS7-xnZGBkZmRmYWIYGmpMlCIAAwgzXQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Device for concrete surrounding of main arch by using hanging method</title><source>esp@cenet</source><creator>ZHANG XIAOJING ; SHEN HAIKUN ; HUANG PING ; LUO HONG ; FU CHANGJIANG ; JIANG DAILIN ; PENG TONGZHOU ; LONG WEI ; DENG HENGCHANG ; CHEN BO ; DAI ZHEN</creator><creatorcontrib>ZHANG XIAOJING ; SHEN HAIKUN ; HUANG PING ; LUO HONG ; FU CHANGJIANG ; JIANG DAILIN ; PENG TONGZHOU ; LONG WEI ; DENG HENGCHANG ; CHEN BO ; DAI ZHEN</creatorcontrib><description>The utility model relates to a device for the concrete surrounding of a main arch by using a hanging method, and the device can be used for greatly increasing the construction efficiency of the concrete surrounding of the main arch and effectively improving the construction safety. The device comprises an arch-back flat wagon (20), a driving device, hanging rods (21), construction platforms (31), upper platforms (43) and a jacking device, wherein the arch-back flat wagon (20) is arranged on a stiffening framework (10), roller groups (23) of the arch-back flat wagon (20) correspond to upper chord pipes (11), the hanging rods (21) are arranged at the outer sides of the upper chord pipes (11) in groups, the upper ends of the hanging rods (21) are connected with the arch-back flat wagon (20), the lower ends of the hanging rods (21) are connected with the construction platforms (31) which are located below the stiffening framework (10), bottom molding boards (40) are fixedly arranged on the upper platforms (43), o</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121226&amp;DB=EPODOC&amp;CC=CN&amp;NR=202626841U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121226&amp;DB=EPODOC&amp;CC=CN&amp;NR=202626841U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG XIAOJING</creatorcontrib><creatorcontrib>SHEN HAIKUN</creatorcontrib><creatorcontrib>HUANG PING</creatorcontrib><creatorcontrib>LUO HONG</creatorcontrib><creatorcontrib>FU CHANGJIANG</creatorcontrib><creatorcontrib>JIANG DAILIN</creatorcontrib><creatorcontrib>PENG TONGZHOU</creatorcontrib><creatorcontrib>LONG WEI</creatorcontrib><creatorcontrib>DENG HENGCHANG</creatorcontrib><creatorcontrib>CHEN BO</creatorcontrib><creatorcontrib>DAI ZHEN</creatorcontrib><title>Device for concrete surrounding of main arch by using hanging method</title><description>The utility model relates to a device for the concrete surrounding of a main arch by using a hanging method, and the device can be used for greatly increasing the construction efficiency of the concrete surrounding of the main arch and effectively improving the construction safety. The device comprises an arch-back flat wagon (20), a driving device, hanging rods (21), construction platforms (31), upper platforms (43) and a jacking device, wherein the arch-back flat wagon (20) is arranged on a stiffening framework (10), roller groups (23) of the arch-back flat wagon (20) correspond to upper chord pipes (11), the hanging rods (21) are arranged at the outer sides of the upper chord pipes (11) in groups, the upper ends of the hanging rods (21) are connected with the arch-back flat wagon (20), the lower ends of the hanging rods (21) are connected with the construction platforms (31) which are located below the stiffening framework (10), bottom molding boards (40) are fixedly arranged on the upper platforms (43), o</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHBxSS3LTE5VSMsvUkjOz0suSi1JVSguLSrKL81LycxLV8hPU8hNzMxTSCxKzlBIqlQoLQaJZiTmpYPo3NSSjPwUHgbWtMSc4lReKM3NoOTmGuLsoZtakB-fWlyQmJyal1oS7-xnZGBkZmRmYWIYGmpMlCIAAwgzXQ</recordid><startdate>20121226</startdate><enddate>20121226</enddate><creator>ZHANG XIAOJING</creator><creator>SHEN HAIKUN</creator><creator>HUANG PING</creator><creator>LUO HONG</creator><creator>FU CHANGJIANG</creator><creator>JIANG DAILIN</creator><creator>PENG TONGZHOU</creator><creator>LONG WEI</creator><creator>DENG HENGCHANG</creator><creator>CHEN BO</creator><creator>DAI ZHEN</creator><scope>EVB</scope></search><sort><creationdate>20121226</creationdate><title>Device for concrete surrounding of main arch by using hanging method</title><author>ZHANG XIAOJING ; SHEN HAIKUN ; HUANG PING ; LUO HONG ; FU CHANGJIANG ; JIANG DAILIN ; PENG TONGZHOU ; LONG WEI ; DENG HENGCHANG ; CHEN BO ; DAI ZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN202626841UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG XIAOJING</creatorcontrib><creatorcontrib>SHEN HAIKUN</creatorcontrib><creatorcontrib>HUANG PING</creatorcontrib><creatorcontrib>LUO HONG</creatorcontrib><creatorcontrib>FU CHANGJIANG</creatorcontrib><creatorcontrib>JIANG DAILIN</creatorcontrib><creatorcontrib>PENG TONGZHOU</creatorcontrib><creatorcontrib>LONG WEI</creatorcontrib><creatorcontrib>DENG HENGCHANG</creatorcontrib><creatorcontrib>CHEN BO</creatorcontrib><creatorcontrib>DAI ZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG XIAOJING</au><au>SHEN HAIKUN</au><au>HUANG PING</au><au>LUO HONG</au><au>FU CHANGJIANG</au><au>JIANG DAILIN</au><au>PENG TONGZHOU</au><au>LONG WEI</au><au>DENG HENGCHANG</au><au>CHEN BO</au><au>DAI ZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Device for concrete surrounding of main arch by using hanging method</title><date>2012-12-26</date><risdate>2012</risdate><abstract>The utility model relates to a device for the concrete surrounding of a main arch by using a hanging method, and the device can be used for greatly increasing the construction efficiency of the concrete surrounding of the main arch and effectively improving the construction safety. The device comprises an arch-back flat wagon (20), a driving device, hanging rods (21), construction platforms (31), upper platforms (43) and a jacking device, wherein the arch-back flat wagon (20) is arranged on a stiffening framework (10), roller groups (23) of the arch-back flat wagon (20) correspond to upper chord pipes (11), the hanging rods (21) are arranged at the outer sides of the upper chord pipes (11) in groups, the upper ends of the hanging rods (21) are connected with the arch-back flat wagon (20), the lower ends of the hanging rods (21) are connected with the construction platforms (31) which are located below the stiffening framework (10), bottom molding boards (40) are fixedly arranged on the upper platforms (43), o</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN202626841UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Device for concrete surrounding of main arch by using hanging method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T06%3A10%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20XIAOJING&rft.date=2012-12-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN202626841UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true