Refuse landfilling process in rainy season
The invention concerns a craft of burying garbage in the rain season. Its feature is: crossing the amount of the garbage, and garbage in the dry and rain season, we calculate the room vacuum needed to bury the garbage, using the garbage not in the rain season to repair the garbage dike around the bu...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIACAI ZHU SHOUCHUN WU JINAN WANG |
description | The invention concerns a craft of burying garbage in the rain season. Its feature is: crossing the amount of the garbage, and garbage in the dry and rain season, we calculate the room vacuum needed to bury the garbage, using the garbage not in the rain season to repair the garbage dike around the burying field of rain season garbage. Using HDPE film to cover garbage can reduce the bare area, to achieve the rain and permeating water separating in the working field. It guarantees the obvious separating of dry season garbage and rain season garbage, and reduces the road falling at most caused by garbage down, and reduces the vacuum of room. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN1631560A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN1631560A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN1631560A3</originalsourceid><addsrcrecordid>eNrjZNAKSk0rLU5VyEnMS0nLzMnJzEtXKCjKT04tLlbIzFMoSszMq1QoTk0szs_jYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXxzn6GZsaGpmYGjsaEVQAAnhAoSQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Refuse landfilling process in rainy season</title><source>esp@cenet</source><creator>JIACAI ZHU ; SHOUCHUN WU ; JINAN WANG</creator><creatorcontrib>JIACAI ZHU ; SHOUCHUN WU ; JINAN WANG</creatorcontrib><description>The invention concerns a craft of burying garbage in the rain season. Its feature is: crossing the amount of the garbage, and garbage in the dry and rain season, we calculate the room vacuum needed to bury the garbage, using the garbage not in the rain season to repair the garbage dike around the burying field of rain season garbage. Using HDPE film to cover garbage can reduce the bare area, to achieve the rain and permeating water separating in the working field. It guarantees the obvious separating of dry season garbage and rain season garbage, and reduces the road falling at most caused by garbage down, and reduces the vacuum of room.</description><edition>7</edition><language>eng</language><subject>DISPOSAL OF SOLID WASTE ; PERFORMING OPERATIONS ; RECLAMATION OF CONTAMINED SOIL SOIL ; TRANSPORTING</subject><creationdate>2005</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20050629&DB=EPODOC&CC=CN&NR=1631560A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20050629&DB=EPODOC&CC=CN&NR=1631560A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIACAI ZHU</creatorcontrib><creatorcontrib>SHOUCHUN WU</creatorcontrib><creatorcontrib>JINAN WANG</creatorcontrib><title>Refuse landfilling process in rainy season</title><description>The invention concerns a craft of burying garbage in the rain season. Its feature is: crossing the amount of the garbage, and garbage in the dry and rain season, we calculate the room vacuum needed to bury the garbage, using the garbage not in the rain season to repair the garbage dike around the burying field of rain season garbage. Using HDPE film to cover garbage can reduce the bare area, to achieve the rain and permeating water separating in the working field. It guarantees the obvious separating of dry season garbage and rain season garbage, and reduces the road falling at most caused by garbage down, and reduces the vacuum of room.</description><subject>DISPOSAL OF SOLID WASTE</subject><subject>PERFORMING OPERATIONS</subject><subject>RECLAMATION OF CONTAMINED SOIL SOIL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2005</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAKSk0rLU5VyEnMS0nLzMnJzEtXKCjKT04tLlbIzFMoSszMq1QoTk0szs_jYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXxzn6GZsaGpmYGjsaEVQAAnhAoSQ</recordid><startdate>20050629</startdate><enddate>20050629</enddate><creator>JIACAI ZHU</creator><creator>SHOUCHUN WU</creator><creator>JINAN WANG</creator><scope>EVB</scope></search><sort><creationdate>20050629</creationdate><title>Refuse landfilling process in rainy season</title><author>JIACAI ZHU ; SHOUCHUN WU ; JINAN WANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN1631560A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2005</creationdate><topic>DISPOSAL OF SOLID WASTE</topic><topic>PERFORMING OPERATIONS</topic><topic>RECLAMATION OF CONTAMINED SOIL SOIL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>JIACAI ZHU</creatorcontrib><creatorcontrib>SHOUCHUN WU</creatorcontrib><creatorcontrib>JINAN WANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIACAI ZHU</au><au>SHOUCHUN WU</au><au>JINAN WANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Refuse landfilling process in rainy season</title><date>2005-06-29</date><risdate>2005</risdate><abstract>The invention concerns a craft of burying garbage in the rain season. Its feature is: crossing the amount of the garbage, and garbage in the dry and rain season, we calculate the room vacuum needed to bury the garbage, using the garbage not in the rain season to repair the garbage dike around the burying field of rain season garbage. Using HDPE film to cover garbage can reduce the bare area, to achieve the rain and permeating water separating in the working field. It guarantees the obvious separating of dry season garbage and rain season garbage, and reduces the road falling at most caused by garbage down, and reduces the vacuum of room.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_CN1631560A |
source | esp@cenet |
subjects | DISPOSAL OF SOLID WASTE PERFORMING OPERATIONS RECLAMATION OF CONTAMINED SOIL SOIL TRANSPORTING |
title | Refuse landfilling process in rainy season |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T16%3A08%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIACAI%20ZHU&rft.date=2005-06-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN1631560A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |