Temporary support for dismantling urban viaduct in complex environment and dismantling method

The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourth...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU YU-LI, MA WEN, YAO QIHAI, WANG KAI, TANG RUI, NIU CAOYUAN, QIAN CHENG, WANG YIXIAN, HE BINGYIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU YU-LI
MA WEN
YAO QIHAI
WANG KAI
TANG RUI
NIU CAOYUAN
QIAN CHENG
WANG YIXIAN
HE BINGYIN
description The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourthly, the flange plates are cut and dismantled in a segmented mode; fifthly, the beam body is cut and dismantled in a segmented mode; sixthly, the pier column is cut and dismantled in a segmented mode; the viaduct has the beneficial effects that the support assemblies for supporting the viaduct body are arranged below the viaduct body, the viaduct body is cut into multiple sections through the rope saw, the cutting parts are aligned to the support assemblies, and the protective baffles are arranged between every two vertically adjacent support assemblies, so that falling objects generated by cutting can be collected, later cleaning can be facilitated, and the working efficiency is improved. The steel trestle hoisting
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118997031A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118997031A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118997031A3</originalsourceid><addsrcrecordid>eNqNizEKAjEQANNYiPqH9QGC4Qq9Ug7FyupaOdZkTwPJJiSbQ3-vhY2d1UwxM1fXnkKKGfMLSk0fExhjButKQBbv-A4135BhcmirEXAMJobk6QnEk8uRA7EAsv2ZAskj2qWajegLrb5cqPXp2HfnDaU4UEloiEmG7qL1vm1320Yfmn-aN4z7PU0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Temporary support for dismantling urban viaduct in complex environment and dismantling method</title><source>esp@cenet</source><creator>LIU YU-LI ; MA WEN ; YAO QIHAI ; WANG KAI ; TANG RUI ; NIU CAOYUAN ; QIAN CHENG ; WANG YIXIAN ; HE BINGYIN</creator><creatorcontrib>LIU YU-LI ; MA WEN ; YAO QIHAI ; WANG KAI ; TANG RUI ; NIU CAOYUAN ; QIAN CHENG ; WANG YIXIAN ; HE BINGYIN</creatorcontrib><description>The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourthly, the flange plates are cut and dismantled in a segmented mode; fifthly, the beam body is cut and dismantled in a segmented mode; sixthly, the pier column is cut and dismantled in a segmented mode; the viaduct has the beneficial effects that the support assemblies for supporting the viaduct body are arranged below the viaduct body, the viaduct body is cut into multiple sections through the rope saw, the cutting parts are aligned to the support assemblies, and the protective baffles are arranged between every two vertically adjacent support assemblies, so that falling objects generated by cutting can be collected, later cleaning can be facilitated, and the working efficiency is improved. The steel trestle hoisting</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CLEANING ; CLEANING IN GENERAL ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS ; PERFORMING OPERATIONS ; PREVENTION OF FOULING IN GENERAL ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241122&amp;DB=EPODOC&amp;CC=CN&amp;NR=118997031A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241122&amp;DB=EPODOC&amp;CC=CN&amp;NR=118997031A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YU-LI</creatorcontrib><creatorcontrib>MA WEN</creatorcontrib><creatorcontrib>YAO QIHAI</creatorcontrib><creatorcontrib>WANG KAI</creatorcontrib><creatorcontrib>TANG RUI</creatorcontrib><creatorcontrib>NIU CAOYUAN</creatorcontrib><creatorcontrib>QIAN CHENG</creatorcontrib><creatorcontrib>WANG YIXIAN</creatorcontrib><creatorcontrib>HE BINGYIN</creatorcontrib><title>Temporary support for dismantling urban viaduct in complex environment and dismantling method</title><description>The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourthly, the flange plates are cut and dismantled in a segmented mode; fifthly, the beam body is cut and dismantled in a segmented mode; sixthly, the pier column is cut and dismantled in a segmented mode; the viaduct has the beneficial effects that the support assemblies for supporting the viaduct body are arranged below the viaduct body, the viaduct body is cut into multiple sections through the rope saw, the cutting parts are aligned to the support assemblies, and the protective baffles are arranged between every two vertically adjacent support assemblies, so that falling objects generated by cutting can be collected, later cleaning can be facilitated, and the working efficiency is improved. The steel trestle hoisting</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CLEANING</subject><subject>CLEANING IN GENERAL</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>PREVENTION OF FOULING IN GENERAL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEKAjEQANNYiPqH9QGC4Qq9Ug7FyupaOdZkTwPJJiSbQ3-vhY2d1UwxM1fXnkKKGfMLSk0fExhjButKQBbv-A4135BhcmirEXAMJobk6QnEk8uRA7EAsv2ZAskj2qWajegLrb5cqPXp2HfnDaU4UEloiEmG7qL1vm1320Yfmn-aN4z7PU0</recordid><startdate>20241122</startdate><enddate>20241122</enddate><creator>LIU YU-LI</creator><creator>MA WEN</creator><creator>YAO QIHAI</creator><creator>WANG KAI</creator><creator>TANG RUI</creator><creator>NIU CAOYUAN</creator><creator>QIAN CHENG</creator><creator>WANG YIXIAN</creator><creator>HE BINGYIN</creator><scope>EVB</scope></search><sort><creationdate>20241122</creationdate><title>Temporary support for dismantling urban viaduct in complex environment and dismantling method</title><author>LIU YU-LI ; MA WEN ; YAO QIHAI ; WANG KAI ; TANG RUI ; NIU CAOYUAN ; QIAN CHENG ; WANG YIXIAN ; HE BINGYIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118997031A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CLEANING</topic><topic>CLEANING IN GENERAL</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>PREVENTION OF FOULING IN GENERAL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YU-LI</creatorcontrib><creatorcontrib>MA WEN</creatorcontrib><creatorcontrib>YAO QIHAI</creatorcontrib><creatorcontrib>WANG KAI</creatorcontrib><creatorcontrib>TANG RUI</creatorcontrib><creatorcontrib>NIU CAOYUAN</creatorcontrib><creatorcontrib>QIAN CHENG</creatorcontrib><creatorcontrib>WANG YIXIAN</creatorcontrib><creatorcontrib>HE BINGYIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YU-LI</au><au>MA WEN</au><au>YAO QIHAI</au><au>WANG KAI</au><au>TANG RUI</au><au>NIU CAOYUAN</au><au>QIAN CHENG</au><au>WANG YIXIAN</au><au>HE BINGYIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Temporary support for dismantling urban viaduct in complex environment and dismantling method</title><date>2024-11-22</date><risdate>2024</risdate><abstract>The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourthly, the flange plates are cut and dismantled in a segmented mode; fifthly, the beam body is cut and dismantled in a segmented mode; sixthly, the pier column is cut and dismantled in a segmented mode; the viaduct has the beneficial effects that the support assemblies for supporting the viaduct body are arranged below the viaduct body, the viaduct body is cut into multiple sections through the rope saw, the cutting parts are aligned to the support assemblies, and the protective baffles are arranged between every two vertically adjacent support assemblies, so that falling objects generated by cutting can be collected, later cleaning can be facilitated, and the working efficiency is improved. The steel trestle hoisting</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118997031A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CLEANING
CLEANING IN GENERAL
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
PERFORMING OPERATIONS
PREVENTION OF FOULING IN GENERAL
TRANSPORTING
title Temporary support for dismantling urban viaduct in complex environment and dismantling method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-21T18%3A03%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YU-LI&rft.date=2024-11-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118997031A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true