Loading device and loading method for seabed corridor under soft geology
The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for a...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZUO HUANAN LIN MEIHONG DONG HONGJING SHEN WENGENG WEN CHENGYONG YING ZONGQUAN WANG XUEGANG |
description | The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118911200A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118911200A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118911200A3</originalsourceid><addsrcrecordid>eNrjZPDwyU9MycxLV0hJLctMTlVIzEtRyIEK5aaWZOSnKKTlFykUpyYmpaYoJOcXFWWmAPmleSmpQNH8tBKF9NT8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWloaGRg4GhMjBoAeioz_A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Loading device and loading method for seabed corridor under soft geology</title><source>esp@cenet</source><creator>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</creator><creatorcontrib>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</creatorcontrib><description>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20241108&DB=EPODOC&CC=CN&NR=118911200A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20241108&DB=EPODOC&CC=CN&NR=118911200A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZUO HUANAN</creatorcontrib><creatorcontrib>LIN MEIHONG</creatorcontrib><creatorcontrib>DONG HONGJING</creatorcontrib><creatorcontrib>SHEN WENGENG</creatorcontrib><creatorcontrib>WEN CHENGYONG</creatorcontrib><creatorcontrib>YING ZONGQUAN</creatorcontrib><creatorcontrib>WANG XUEGANG</creatorcontrib><title>Loading device and loading method for seabed corridor under soft geology</title><description>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPDwyU9MycxLV0hJLctMTlVIzEtRyIEK5aaWZOSnKKTlFykUpyYmpaYoJOcXFWWmAPmleSmpQNH8tBKF9NT8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWloaGRg4GhMjBoAeioz_A</recordid><startdate>20241108</startdate><enddate>20241108</enddate><creator>ZUO HUANAN</creator><creator>LIN MEIHONG</creator><creator>DONG HONGJING</creator><creator>SHEN WENGENG</creator><creator>WEN CHENGYONG</creator><creator>YING ZONGQUAN</creator><creator>WANG XUEGANG</creator><scope>EVB</scope></search><sort><creationdate>20241108</creationdate><title>Loading device and loading method for seabed corridor under soft geology</title><author>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118911200A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZUO HUANAN</creatorcontrib><creatorcontrib>LIN MEIHONG</creatorcontrib><creatorcontrib>DONG HONGJING</creatorcontrib><creatorcontrib>SHEN WENGENG</creatorcontrib><creatorcontrib>WEN CHENGYONG</creatorcontrib><creatorcontrib>YING ZONGQUAN</creatorcontrib><creatorcontrib>WANG XUEGANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZUO HUANAN</au><au>LIN MEIHONG</au><au>DONG HONGJING</au><au>SHEN WENGENG</au><au>WEN CHENGYONG</au><au>YING ZONGQUAN</au><au>WANG XUEGANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Loading device and loading method for seabed corridor under soft geology</title><date>2024-11-08</date><risdate>2024</risdate><abstract>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN118911200A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Loading device and loading method for seabed corridor under soft geology |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T16%3A45%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZUO%20HUANAN&rft.date=2024-11-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118911200A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |