Loading device and loading method for seabed corridor under soft geology

The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZUO HUANAN, LIN MEIHONG, DONG HONGJING, SHEN WENGENG, WEN CHENGYONG, YING ZONGQUAN, WANG XUEGANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZUO HUANAN
LIN MEIHONG
DONG HONGJING
SHEN WENGENG
WEN CHENGYONG
YING ZONGQUAN
WANG XUEGANG
description The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118911200A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118911200A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118911200A3</originalsourceid><addsrcrecordid>eNrjZPDwyU9MycxLV0hJLctMTlVIzEtRyIEK5aaWZOSnKKTlFykUpyYmpaYoJOcXFWWmAPmleSmpQNH8tBKF9NT8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWloaGRg4GhMjBoAeioz_A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Loading device and loading method for seabed corridor under soft geology</title><source>esp@cenet</source><creator>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</creator><creatorcontrib>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</creatorcontrib><description>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241108&amp;DB=EPODOC&amp;CC=CN&amp;NR=118911200A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241108&amp;DB=EPODOC&amp;CC=CN&amp;NR=118911200A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZUO HUANAN</creatorcontrib><creatorcontrib>LIN MEIHONG</creatorcontrib><creatorcontrib>DONG HONGJING</creatorcontrib><creatorcontrib>SHEN WENGENG</creatorcontrib><creatorcontrib>WEN CHENGYONG</creatorcontrib><creatorcontrib>YING ZONGQUAN</creatorcontrib><creatorcontrib>WANG XUEGANG</creatorcontrib><title>Loading device and loading method for seabed corridor under soft geology</title><description>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPDwyU9MycxLV0hJLctMTlVIzEtRyIEK5aaWZOSnKKTlFykUpyYmpaYoJOcXFWWmAPmleSmpQNH8tBKF9NT8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoYWloaGRg4GhMjBoAeioz_A</recordid><startdate>20241108</startdate><enddate>20241108</enddate><creator>ZUO HUANAN</creator><creator>LIN MEIHONG</creator><creator>DONG HONGJING</creator><creator>SHEN WENGENG</creator><creator>WEN CHENGYONG</creator><creator>YING ZONGQUAN</creator><creator>WANG XUEGANG</creator><scope>EVB</scope></search><sort><creationdate>20241108</creationdate><title>Loading device and loading method for seabed corridor under soft geology</title><author>ZUO HUANAN ; LIN MEIHONG ; DONG HONGJING ; SHEN WENGENG ; WEN CHENGYONG ; YING ZONGQUAN ; WANG XUEGANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118911200A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZUO HUANAN</creatorcontrib><creatorcontrib>LIN MEIHONG</creatorcontrib><creatorcontrib>DONG HONGJING</creatorcontrib><creatorcontrib>SHEN WENGENG</creatorcontrib><creatorcontrib>WEN CHENGYONG</creatorcontrib><creatorcontrib>YING ZONGQUAN</creatorcontrib><creatorcontrib>WANG XUEGANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZUO HUANAN</au><au>LIN MEIHONG</au><au>DONG HONGJING</au><au>SHEN WENGENG</au><au>WEN CHENGYONG</au><au>YING ZONGQUAN</au><au>WANG XUEGANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Loading device and loading method for seabed corridor under soft geology</title><date>2024-11-08</date><risdate>2024</risdate><abstract>The seabed corridor loading device under the soft geology comprises loading bins, a collecting ditch and a control unit, each loading bin is provided with a plurality of unit bins in a layered mode through a grating framework, and an electromagnetic spring is arranged in each unit bin and used for adjusting the height of the unit bin; the loading method comprises the steps of determining a loading scheme, adjusting an electromagnetic spring, pumping a mud-water mixture to form temporary loading, monitoring a sinking process, draining and consolidating to form permanent loading and paving a road surface. A force transducer and an attitude sensor are used for continuous monitoring in the whole corridor sinking process, the construction stability is ensured, after the corridor sinks into the seabed, water in a mud-water mixture is drained layer by layer in a drainage consolidation mode, and solid particles are left to provide permanent loading for the corridor. According to the method, the stress and stable stat</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118911200A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Loading device and loading method for seabed corridor under soft geology
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T16%3A45%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZUO%20HUANAN&rft.date=2024-11-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118911200A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true