Basement outer wall reserved hole pouring construction method

The invention discloses a pouring construction method for a reserved hole in a basement outer wall. The pouring construction method comprises the steps that a supporting beam embedded into the reserved hole in the basement outer wall is dismantled; construction joints around the reserved hole are tr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LING YUN, ZHANG YUZHOU, LIANG SHITAI, YANG XIAOKANG, ZHANG RUJIAN, QU YUE, ZHOU MINGLIAAO, LI SONG, LIU WENWU, ZHANG DONGLIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LING YUN
ZHANG YUZHOU
LIANG SHITAI
YANG XIAOKANG
ZHANG RUJIAN
QU YUE
ZHOU MINGLIAAO
LI SONG
LIU WENWU
ZHANG DONGLIANG
description The invention discloses a pouring construction method for a reserved hole in a basement outer wall. The pouring construction method comprises the steps that a supporting beam embedded into the reserved hole in the basement outer wall is dismantled; construction joints around the reserved hole are treated; the reserved hole is subjected to waterproof treatment, grouting pipes are arranged around the reserved hole, and pipe openings of the grouting pipes are exposed out of the outer wall of the basement; reinforcing steel bars are constructed in the reserved holes; a formwork is constructed at the reserved hole, and a horn mouth communicated with the reserved hole is formed in the upper end of the formwork on the side, away from the supporting beam, of the reserved hole; concrete pouring is conducted on the reserved hole through the horn mouth, and after concrete poured in the reserved hole is cured for a first preset number of days, the formwork is dismantled; performing waterproof construction on the basement
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118704465A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118704465A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118704465A3</originalsourceid><addsrcrecordid>eNrjZLB1SixOzU3NK1HILy1JLVIoT8zJUShKLU4tKktNUcjIz0lVKMgvLcrMS1dIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYW5gYmJmamjsbEqAEAYukw0g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Basement outer wall reserved hole pouring construction method</title><source>esp@cenet</source><creator>LING YUN ; ZHANG YUZHOU ; LIANG SHITAI ; YANG XIAOKANG ; ZHANG RUJIAN ; QU YUE ; ZHOU MINGLIAAO ; LI SONG ; LIU WENWU ; ZHANG DONGLIANG</creator><creatorcontrib>LING YUN ; ZHANG YUZHOU ; LIANG SHITAI ; YANG XIAOKANG ; ZHANG RUJIAN ; QU YUE ; ZHOU MINGLIAAO ; LI SONG ; LIU WENWU ; ZHANG DONGLIANG</creatorcontrib><description>The invention discloses a pouring construction method for a reserved hole in a basement outer wall. The pouring construction method comprises the steps that a supporting beam embedded into the reserved hole in the basement outer wall is dismantled; construction joints around the reserved hole are treated; the reserved hole is subjected to waterproof treatment, grouting pipes are arranged around the reserved hole, and pipe openings of the grouting pipes are exposed out of the outer wall of the basement; reinforcing steel bars are constructed in the reserved holes; a formwork is constructed at the reserved hole, and a horn mouth communicated with the reserved hole is formed in the upper end of the formwork on the side, away from the supporting beam, of the reserved hole; concrete pouring is conducted on the reserved hole through the horn mouth, and after concrete poured in the reserved hole is cured for a first preset number of days, the formwork is dismantled; performing waterproof construction on the basement</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240927&amp;DB=EPODOC&amp;CC=CN&amp;NR=118704465A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240927&amp;DB=EPODOC&amp;CC=CN&amp;NR=118704465A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LING YUN</creatorcontrib><creatorcontrib>ZHANG YUZHOU</creatorcontrib><creatorcontrib>LIANG SHITAI</creatorcontrib><creatorcontrib>YANG XIAOKANG</creatorcontrib><creatorcontrib>ZHANG RUJIAN</creatorcontrib><creatorcontrib>QU YUE</creatorcontrib><creatorcontrib>ZHOU MINGLIAAO</creatorcontrib><creatorcontrib>LI SONG</creatorcontrib><creatorcontrib>LIU WENWU</creatorcontrib><creatorcontrib>ZHANG DONGLIANG</creatorcontrib><title>Basement outer wall reserved hole pouring construction method</title><description>The invention discloses a pouring construction method for a reserved hole in a basement outer wall. The pouring construction method comprises the steps that a supporting beam embedded into the reserved hole in the basement outer wall is dismantled; construction joints around the reserved hole are treated; the reserved hole is subjected to waterproof treatment, grouting pipes are arranged around the reserved hole, and pipe openings of the grouting pipes are exposed out of the outer wall of the basement; reinforcing steel bars are constructed in the reserved holes; a formwork is constructed at the reserved hole, and a horn mouth communicated with the reserved hole is formed in the upper end of the formwork on the side, away from the supporting beam, of the reserved hole; concrete pouring is conducted on the reserved hole through the horn mouth, and after concrete poured in the reserved hole is cured for a first preset number of days, the formwork is dismantled; performing waterproof construction on the basement</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB1SixOzU3NK1HILy1JLVIoT8zJUShKLU4tKktNUcjIz0lVKMgvLcrMS1dIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYW5gYmJmamjsbEqAEAYukw0g</recordid><startdate>20240927</startdate><enddate>20240927</enddate><creator>LING YUN</creator><creator>ZHANG YUZHOU</creator><creator>LIANG SHITAI</creator><creator>YANG XIAOKANG</creator><creator>ZHANG RUJIAN</creator><creator>QU YUE</creator><creator>ZHOU MINGLIAAO</creator><creator>LI SONG</creator><creator>LIU WENWU</creator><creator>ZHANG DONGLIANG</creator><scope>EVB</scope></search><sort><creationdate>20240927</creationdate><title>Basement outer wall reserved hole pouring construction method</title><author>LING YUN ; ZHANG YUZHOU ; LIANG SHITAI ; YANG XIAOKANG ; ZHANG RUJIAN ; QU YUE ; ZHOU MINGLIAAO ; LI SONG ; LIU WENWU ; ZHANG DONGLIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118704465A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LING YUN</creatorcontrib><creatorcontrib>ZHANG YUZHOU</creatorcontrib><creatorcontrib>LIANG SHITAI</creatorcontrib><creatorcontrib>YANG XIAOKANG</creatorcontrib><creatorcontrib>ZHANG RUJIAN</creatorcontrib><creatorcontrib>QU YUE</creatorcontrib><creatorcontrib>ZHOU MINGLIAAO</creatorcontrib><creatorcontrib>LI SONG</creatorcontrib><creatorcontrib>LIU WENWU</creatorcontrib><creatorcontrib>ZHANG DONGLIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LING YUN</au><au>ZHANG YUZHOU</au><au>LIANG SHITAI</au><au>YANG XIAOKANG</au><au>ZHANG RUJIAN</au><au>QU YUE</au><au>ZHOU MINGLIAAO</au><au>LI SONG</au><au>LIU WENWU</au><au>ZHANG DONGLIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Basement outer wall reserved hole pouring construction method</title><date>2024-09-27</date><risdate>2024</risdate><abstract>The invention discloses a pouring construction method for a reserved hole in a basement outer wall. The pouring construction method comprises the steps that a supporting beam embedded into the reserved hole in the basement outer wall is dismantled; construction joints around the reserved hole are treated; the reserved hole is subjected to waterproof treatment, grouting pipes are arranged around the reserved hole, and pipe openings of the grouting pipes are exposed out of the outer wall of the basement; reinforcing steel bars are constructed in the reserved holes; a formwork is constructed at the reserved hole, and a horn mouth communicated with the reserved hole is formed in the upper end of the formwork on the side, away from the supporting beam, of the reserved hole; concrete pouring is conducted on the reserved hole through the horn mouth, and after concrete poured in the reserved hole is cured for a first preset number of days, the formwork is dismantled; performing waterproof construction on the basement</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118704465A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Basement outer wall reserved hole pouring construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T06%3A22%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LING%20YUN&rft.date=2024-09-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118704465A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true