Construction method of bearing platform at soft and hard geological junction of mud flat area
The invention relates to a construction method of a bearing platform at a soft and hard geological junction of a mud flat area, which comprises the following steps: pouring a layer of reinforced concrete bottom plate connected with a pile foundation steel casing into a whole at the bottom of a found...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!