Method for installing curtain wall at bottom of large-span steel corridor

The invention discloses a method for installing a curtain wall at the bottom of a large-span steel corridor. The method comprises the following steps that coordinates and heights of curtain wall connecting rods are calculated; surveying and setting out are carried out; a curtain wall connecting rod...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MENG XIANGCHAO, RAN MENG, FANG QI, XIANG XIREN, LU WEICHAO, LIU HAIYANG, QIAO FENG, DING ZHENLONG, LI YUQI, FENG JIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MENG XIANGCHAO
RAN MENG
FANG QI
XIANG XIREN
LU WEICHAO
LIU HAIYANG
QIAO FENG
DING ZHENLONG
LI YUQI
FENG JIAN
description The invention discloses a method for installing a curtain wall at the bottom of a large-span steel corridor. The method comprises the following steps that coordinates and heights of curtain wall connecting rods are calculated; surveying and setting out are carried out; a curtain wall connecting rod is welded to the bottom of the steel corridor; the whole curtain wall is split into a plurality of curtain wall units; a fixed lifting point is arranged on the steel corridor, the position of a follow-up lifting point on the steel corridor is adjusted, and a steel wire rope winds around the fixed lifting point and the follow-up lifting point and then lifts the curtain wall unit; the hoisting system turns over the curtain wall units; the hoisting system lifts the curtain wall unit; and the curtain wall units are welded with the curtain wall connecting rods. The construction method has the beneficial effects that the curtain wall connecting rods and the curtain wall units are mounted or spliced in advance before hois
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118639878A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118639878A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118639878A3</originalsourceid><addsrcrecordid>eNqNizEKwkAQAK-xEPUP6wNShICepQRFC63sw3rZSw7W27C34vdN4QOshoGZpbveyEbpIYpCysWQOeUBwlsNU4bP7IAGTzGTF0gERh2oKhNmKEbEEEQ19aJrt4jIhTY_rtz2fHq0l4om6WgeAmWyrr3Xtd81B7_3x-af5gvcVzTD</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for installing curtain wall at bottom of large-span steel corridor</title><source>esp@cenet</source><creator>MENG XIANGCHAO ; RAN MENG ; FANG QI ; XIANG XIREN ; LU WEICHAO ; LIU HAIYANG ; QIAO FENG ; DING ZHENLONG ; LI YUQI ; FENG JIAN</creator><creatorcontrib>MENG XIANGCHAO ; RAN MENG ; FANG QI ; XIANG XIREN ; LU WEICHAO ; LIU HAIYANG ; QIAO FENG ; DING ZHENLONG ; LI YUQI ; FENG JIAN</creatorcontrib><description>The invention discloses a method for installing a curtain wall at the bottom of a large-span steel corridor. The method comprises the following steps that coordinates and heights of curtain wall connecting rods are calculated; surveying and setting out are carried out; a curtain wall connecting rod is welded to the bottom of the steel corridor; the whole curtain wall is split into a plurality of curtain wall units; a fixed lifting point is arranged on the steel corridor, the position of a follow-up lifting point on the steel corridor is adjusted, and a steel wire rope winds around the fixed lifting point and the follow-up lifting point and then lifts the curtain wall unit; the hoisting system turns over the curtain wall units; the hoisting system lifts the curtain wall unit; and the curtain wall units are welded with the curtain wall connecting rods. The construction method has the beneficial effects that the curtain wall connecting rods and the curtain wall units are mounted or spliced in advance before hois</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240913&amp;DB=EPODOC&amp;CC=CN&amp;NR=118639878A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25546,76297</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240913&amp;DB=EPODOC&amp;CC=CN&amp;NR=118639878A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MENG XIANGCHAO</creatorcontrib><creatorcontrib>RAN MENG</creatorcontrib><creatorcontrib>FANG QI</creatorcontrib><creatorcontrib>XIANG XIREN</creatorcontrib><creatorcontrib>LU WEICHAO</creatorcontrib><creatorcontrib>LIU HAIYANG</creatorcontrib><creatorcontrib>QIAO FENG</creatorcontrib><creatorcontrib>DING ZHENLONG</creatorcontrib><creatorcontrib>LI YUQI</creatorcontrib><creatorcontrib>FENG JIAN</creatorcontrib><title>Method for installing curtain wall at bottom of large-span steel corridor</title><description>The invention discloses a method for installing a curtain wall at the bottom of a large-span steel corridor. The method comprises the following steps that coordinates and heights of curtain wall connecting rods are calculated; surveying and setting out are carried out; a curtain wall connecting rod is welded to the bottom of the steel corridor; the whole curtain wall is split into a plurality of curtain wall units; a fixed lifting point is arranged on the steel corridor, the position of a follow-up lifting point on the steel corridor is adjusted, and a steel wire rope winds around the fixed lifting point and the follow-up lifting point and then lifts the curtain wall unit; the hoisting system turns over the curtain wall units; the hoisting system lifts the curtain wall unit; and the curtain wall units are welded with the curtain wall connecting rods. The construction method has the beneficial effects that the curtain wall connecting rods and the curtain wall units are mounted or spliced in advance before hois</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEKwkAQAK-xEPUP6wNShICepQRFC63sw3rZSw7W27C34vdN4QOshoGZpbveyEbpIYpCysWQOeUBwlsNU4bP7IAGTzGTF0gERh2oKhNmKEbEEEQ19aJrt4jIhTY_rtz2fHq0l4om6WgeAmWyrr3Xtd81B7_3x-af5gvcVzTD</recordid><startdate>20240913</startdate><enddate>20240913</enddate><creator>MENG XIANGCHAO</creator><creator>RAN MENG</creator><creator>FANG QI</creator><creator>XIANG XIREN</creator><creator>LU WEICHAO</creator><creator>LIU HAIYANG</creator><creator>QIAO FENG</creator><creator>DING ZHENLONG</creator><creator>LI YUQI</creator><creator>FENG JIAN</creator><scope>EVB</scope></search><sort><creationdate>20240913</creationdate><title>Method for installing curtain wall at bottom of large-span steel corridor</title><author>MENG XIANGCHAO ; RAN MENG ; FANG QI ; XIANG XIREN ; LU WEICHAO ; LIU HAIYANG ; QIAO FENG ; DING ZHENLONG ; LI YUQI ; FENG JIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118639878A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MENG XIANGCHAO</creatorcontrib><creatorcontrib>RAN MENG</creatorcontrib><creatorcontrib>FANG QI</creatorcontrib><creatorcontrib>XIANG XIREN</creatorcontrib><creatorcontrib>LU WEICHAO</creatorcontrib><creatorcontrib>LIU HAIYANG</creatorcontrib><creatorcontrib>QIAO FENG</creatorcontrib><creatorcontrib>DING ZHENLONG</creatorcontrib><creatorcontrib>LI YUQI</creatorcontrib><creatorcontrib>FENG JIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MENG XIANGCHAO</au><au>RAN MENG</au><au>FANG QI</au><au>XIANG XIREN</au><au>LU WEICHAO</au><au>LIU HAIYANG</au><au>QIAO FENG</au><au>DING ZHENLONG</au><au>LI YUQI</au><au>FENG JIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for installing curtain wall at bottom of large-span steel corridor</title><date>2024-09-13</date><risdate>2024</risdate><abstract>The invention discloses a method for installing a curtain wall at the bottom of a large-span steel corridor. The method comprises the following steps that coordinates and heights of curtain wall connecting rods are calculated; surveying and setting out are carried out; a curtain wall connecting rod is welded to the bottom of the steel corridor; the whole curtain wall is split into a plurality of curtain wall units; a fixed lifting point is arranged on the steel corridor, the position of a follow-up lifting point on the steel corridor is adjusted, and a steel wire rope winds around the fixed lifting point and the follow-up lifting point and then lifts the curtain wall unit; the hoisting system turns over the curtain wall units; the hoisting system lifts the curtain wall unit; and the curtain wall units are welded with the curtain wall connecting rods. The construction method has the beneficial effects that the curtain wall connecting rods and the curtain wall units are mounted or spliced in advance before hois</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118639878A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title Method for installing curtain wall at bottom of large-span steel corridor
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T09%3A01%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MENG%20XIANGCHAO&rft.date=2024-09-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118639878A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true