Informatization construction method for long, large and deep foundation pit close to subway tunnel

The invention provides an informatization construction method for a long, large and deep foundation pit adjacent to a subway tunnel, which comprises the following steps: adopting bin division excavation, performing bin division excavation on the foundation pit by combining a supporting wall with a s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KANG LIN, WU DIANWEI, CHENG GUIZHI, GUO YUANBO, LI ZHANFENG, BI YANZHE, QIAN QILONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KANG LIN
WU DIANWEI
CHENG GUIZHI
GUO YUANBO
LI ZHANFENG
BI YANZHE
QIAN QILONG
description The invention provides an informatization construction method for a long, large and deep foundation pit adjacent to a subway tunnel, which comprises the following steps: adopting bin division excavation, performing bin division excavation on the foundation pit by combining a supporting wall with a separating wall, excavating the foundation pit to a designed elevation under the action of an inner support and angle support supporting structure, and enabling the supporting wall and the separating wall to be a wall body formed by combining a secant pile with a top beam and a waist beam; after the previous foundation pit is excavated, deformation monitoring is conducted on the excavated foundation pit; on the basis of different control points, on-site construction monitoring data of the top horizontal displacement, the deep soil displacement, the ground surface settlement and the deep horizontal displacement of the enclosure structure are measured respectively; in the whole excavation process of the foundation pit
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118621794A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118621794A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118621794A3</originalsourceid><addsrcrecordid>eNqNi7EKAjEQRK-xEPUf1l6LqHhayqFoY2V_5JK98yC3G5INol9vUD_AYhiG92ZcNBdqOQxa-lcOEximKCGZzxhQ7mwhG-CYugU4HToETRYsos8gkf3-fC9gHEcEYYipeegnSCJCNy1GrXYRZ7-eFPPT8Vadl-i5xui1QUKpq6tSu-1KlfvNYf2P8walsT6O</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Informatization construction method for long, large and deep foundation pit close to subway tunnel</title><source>esp@cenet</source><creator>KANG LIN ; WU DIANWEI ; CHENG GUIZHI ; GUO YUANBO ; LI ZHANFENG ; BI YANZHE ; QIAN QILONG</creator><creatorcontrib>KANG LIN ; WU DIANWEI ; CHENG GUIZHI ; GUO YUANBO ; LI ZHANFENG ; BI YANZHE ; QIAN QILONG</creatorcontrib><description>The invention provides an informatization construction method for a long, large and deep foundation pit adjacent to a subway tunnel, which comprises the following steps: adopting bin division excavation, performing bin division excavation on the foundation pit by combining a supporting wall with a separating wall, excavating the foundation pit to a designed elevation under the action of an inner support and angle support supporting structure, and enabling the supporting wall and the separating wall to be a wall body formed by combining a secant pile with a top beam and a waist beam; after the previous foundation pit is excavated, deformation monitoring is conducted on the excavated foundation pit; on the basis of different control points, on-site construction monitoring data of the top horizontal displacement, the deep soil displacement, the ground surface settlement and the deep horizontal displacement of the enclosure structure are measured respectively; in the whole excavation process of the foundation pit</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; PHYSICS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240910&amp;DB=EPODOC&amp;CC=CN&amp;NR=118621794A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240910&amp;DB=EPODOC&amp;CC=CN&amp;NR=118621794A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KANG LIN</creatorcontrib><creatorcontrib>WU DIANWEI</creatorcontrib><creatorcontrib>CHENG GUIZHI</creatorcontrib><creatorcontrib>GUO YUANBO</creatorcontrib><creatorcontrib>LI ZHANFENG</creatorcontrib><creatorcontrib>BI YANZHE</creatorcontrib><creatorcontrib>QIAN QILONG</creatorcontrib><title>Informatization construction method for long, large and deep foundation pit close to subway tunnel</title><description>The invention provides an informatization construction method for a long, large and deep foundation pit adjacent to a subway tunnel, which comprises the following steps: adopting bin division excavation, performing bin division excavation on the foundation pit by combining a supporting wall with a separating wall, excavating the foundation pit to a designed elevation under the action of an inner support and angle support supporting structure, and enabling the supporting wall and the separating wall to be a wall body formed by combining a secant pile with a top beam and a waist beam; after the previous foundation pit is excavated, deformation monitoring is conducted on the excavated foundation pit; on the basis of different control points, on-site construction monitoring data of the top horizontal displacement, the deep soil displacement, the ground surface settlement and the deep horizontal displacement of the enclosure structure are measured respectively; in the whole excavation process of the foundation pit</description><subject>CALCULATING</subject><subject>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7EKAjEQRK-xEPUf1l6LqHhayqFoY2V_5JK98yC3G5INol9vUD_AYhiG92ZcNBdqOQxa-lcOEximKCGZzxhQ7mwhG-CYugU4HToETRYsos8gkf3-fC9gHEcEYYipeegnSCJCNy1GrXYRZ7-eFPPT8Vadl-i5xui1QUKpq6tSu-1KlfvNYf2P8walsT6O</recordid><startdate>20240910</startdate><enddate>20240910</enddate><creator>KANG LIN</creator><creator>WU DIANWEI</creator><creator>CHENG GUIZHI</creator><creator>GUO YUANBO</creator><creator>LI ZHANFENG</creator><creator>BI YANZHE</creator><creator>QIAN QILONG</creator><scope>EVB</scope></search><sort><creationdate>20240910</creationdate><title>Informatization construction method for long, large and deep foundation pit close to subway tunnel</title><author>KANG LIN ; WU DIANWEI ; CHENG GUIZHI ; GUO YUANBO ; LI ZHANFENG ; BI YANZHE ; QIAN QILONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118621794A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>KANG LIN</creatorcontrib><creatorcontrib>WU DIANWEI</creatorcontrib><creatorcontrib>CHENG GUIZHI</creatorcontrib><creatorcontrib>GUO YUANBO</creatorcontrib><creatorcontrib>LI ZHANFENG</creatorcontrib><creatorcontrib>BI YANZHE</creatorcontrib><creatorcontrib>QIAN QILONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KANG LIN</au><au>WU DIANWEI</au><au>CHENG GUIZHI</au><au>GUO YUANBO</au><au>LI ZHANFENG</au><au>BI YANZHE</au><au>QIAN QILONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Informatization construction method for long, large and deep foundation pit close to subway tunnel</title><date>2024-09-10</date><risdate>2024</risdate><abstract>The invention provides an informatization construction method for a long, large and deep foundation pit adjacent to a subway tunnel, which comprises the following steps: adopting bin division excavation, performing bin division excavation on the foundation pit by combining a supporting wall with a separating wall, excavating the foundation pit to a designed elevation under the action of an inner support and angle support supporting structure, and enabling the supporting wall and the separating wall to be a wall body formed by combining a secant pile with a top beam and a waist beam; after the previous foundation pit is excavated, deformation monitoring is conducted on the excavated foundation pit; on the basis of different control points, on-site construction monitoring data of the top horizontal displacement, the deep soil displacement, the ground surface settlement and the deep horizontal displacement of the enclosure structure are measured respectively; in the whole excavation process of the foundation pit</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118621794A
source esp@cenet
subjects CALCULATING
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
PHYSICS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Informatization construction method for long, large and deep foundation pit close to subway tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T06%3A31%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KANG%20LIN&rft.date=2024-09-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118621794A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true